{"took":1,"timed_out":false,"_shards":{"total":1,"successful":1,"skipped":0,"failed":0},"hits":{"total":{"value":1,"relation":"eq"},"max_score":13.072529,"hits":[{"_index":"applications","_type":"_doc","_id":"Haringey-HGY_2023_2769","_score":13.072529,"_ignored":["polygon"],"_source":{"epc_number":"0561-2824-7821-9991-1865","appeal_decision_date":null,"parking_details":{},"appeal_decision":null,"last_synced":"2026-08-14T02:11:16.805Z","decision_agency":null,"application_type":"All Other","lpa_app_no":"HGY/2023/2769","application_type_full":"Full planning permission","uprn":"10093593931","borough":"Out of Borough","street_name":"Hawke Park Road","locality":null,"ward":"West Green","actual_commencement_date":null,"lpa_name":"Haringey","bo_system":"Arcus","decision_conditions":null,"date_building_work_started_under_previous_permission":null,"centroid_easting":531913,"status":"Approved","decision_date":"11/12/2023","wgs84_polygon":null,"decision_target_date":"11/12/2023","subdivision_of_building":"affects only garden of flat A. No effect on any existing buildings.","last_date_consultation_comments":"05/12/2023","development_type":"Major dwellings","title_number":null,"appeal_status":null,"last_updated":"2026-08-13T21:05:05.400Z","last_updated_by":"Arcus","site_name":"Flat A, 5 Hawke Park Road, Tottenham, London, N22 6RE","id":"Haringey-HGY_2023_2769","decision":"Approved","cil_liability":null,"centroid_northing":189931,"appeal_start_date":null,"postcode":"N22 6RE","url_planning_app":"https://publicregister.haringey.gov.uk/pr/s/detail/a0i8d000005UJW8","date_building_work_completed_under_previous_permission":null,"secondary_street_name":null,"site_number":null,"reference_no_of_permission_being_relied_on":null,"description":"Installation of a pre-fabricated garden office in the back garden","valid_date":"16/10/2023","polygon":{"coordinates":[[[531898.85,189921.2],[531896.8,189919.15],[531900.2,189915.65],[531902.25,189917.6],[531907.4,189922.45],[531911.2,189926.1],[531913.6,189928.35],[531915.1,189929.8],[531918.9,189933.4],[531922.6,189936.9],[531926.4,189940.5],[531928.7,189942.6],[531926.875,189944.45],[531925.05,189946.3],[531922.783,189944.127],[531905.65,189927.7],[531904.55,189926.6],[531903.25,189925.35],[531900.85,189923.1],[531898.85,189921.2]]],"type":"Polygon"},"pp_id":"PP-12461084","application_details":{"open_and_protected_space_details":{"open_space_green_belt_area_gain":0,"open_space_local_and_other_area_gain":0,"open_space_green_belt_area_loss":0,"open_space_mol_area_gain":0,"open_space_local_and_other_area_loss":0,"protected_space_count":0,"open_spaces_details":[{"area":0.0010500000000000002,"access":"Restricted","land_swap":false,"open_space_designation":"Not Designated","description":"10 m2 of our 100 m2 private garden will switch from paved/grassed patio to the garden office.\nThis is 10% of the garden and 5% of our entire curtilage/plot.","open_space_type":"Parks and gardens"}],"open_space_mol_area_loss":0},"green_suds":false,"non_residential_details":{"total_gia_existing":77,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_gia_gained":8.93,"total_gia_lost":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0},"affordable_housing_fast_track":false,"garden_land_lost":true,"site_area":0.02,"total_gia_existing":77,"rain_water_harvesting":false,"grey_water_reuse":false,"building_details":[{"no_storeys":1,"max_height":2.5,"building_ref":"garden office"}],"existing_proposed_floorspace_details":[{"gia_existing":77,"use_class":"C3","gia_gained":8.93,"gia_lost":0}],"internal_resi_water_usage":0,"surface_water_discharge_percentage_reduction":0,"phasing_details":[{"phase_detail":"Entire development","intended_commencement_date":"11/2023","intended_completion_date":"12/2023"}],"total_gia_lost":0,"infrastructure_details":{"waste_provision":true,"percentage_demolition_construction_material_recycling":100,"ghg_reduction_over_building_regulations":false,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"total_annual_nox_emissions":0,"no_new_gas_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"no_resi_units_to_have_full_fibre":1,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"green_roof_area":0,"fire_suppression_system_proposed":false,"total_annual_pm_emissions":0},"scheme_phasing":true,"lead_developer_company_name":"I, the applicant, and my partner are the developers. Michael Edwards and Sue Hirst","total_gia_gained":8.93,"ownership_status":"Private","existing_uprns":null,"projected_cost_of_works":"Up to £2m"},"centroid":{"lon":-7.55716,"lat":49.766807},"lapsed_date":"11/12/2026","decision_process":"Delegated","actual_completion_date":null}}]}}