{"borough":"London Borough of Barking and Dagenham","application_type":"All Other","decision":"Approved","decision_conditions":["The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.<br>","&lt;p&gt;The development hereby approved shall only be carried out in accordance with the following approved plans and documents:&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Proposed Ground Floor Plan - drawing no. D03 Rev1 - dated 13-11-2025&lt;/li&gt;&lt;li&gt;Proposed First Floor Plan - drawing no. D04 Rev1 - dated 13-11-2025&lt;/li&gt;&lt;li&gt;Proposed Roof Plan - drawing no. D06 Rev1 - dated 13-11-2025&lt;/li&gt;&lt;li&gt;Proposed Elevations - drawing no. D09 Rev1 - dated 13-11-2025&lt;/li&gt;&lt;li&gt;Proposed Elevations - drawing no. D10 - dated 15-10-2025&lt;/li&gt;&lt;li&gt;Proposed Section AA - drawing no. D11 - dated 15-10-2025&lt;/li&gt;&lt;li&gt;Site Location - drawing no. D12 - dated 15-10-2025&lt;/li&gt;&lt;li&gt;Block Plan - drawing no. D12 - dated 15-10-2025&lt;/li&gt;&lt;li&gt;Site Photographs&lt;/li&gt;&lt;li&gt;Small Sites BNG Metric&lt;/li&gt;&lt;li&gt;Design and Access Statement&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;No other drawings or documents apply.&lt;/p&gt;","<p class=\"MsoNormal\">The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing dwellinghouse.<br></p>","&lt;p&gt;Notwithstanding the provisions of The Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no development falling within Classes A and E in Part 1 of Schedule 2 to that Order shall be carried out without the prior written permission of the Local Planning Authority.&lt;br&gt;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;&lt;span style=&quot;font-family:Arial,Helvetica,sans-serif&quot;&gt;No part of the property shall be occupied or used until the cycle storage arrangements have been implemented in accordance with the approved details. The cycle storage arrangements shall thereafter be retained.&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;&amp;nbsp;No development shall commence, \r\nincluding any works of demolition, until a Construction Environmental Management Plan \r\n(CEMP)has been submitted to and approved in writing by the Local Planning Authority. This \r\nPlan shall incorporate details of:&amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; a) the parking of site operatives’ vehicles;&amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; b) loading and unloading of plant and materials;&amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; c) storage of plant and materials used in constructing the development;&amp;nbsp; &amp;nbsp; &amp;nbsp; d) measures to control the emission of dust, dirt, and emissions to air during \r\nconstruction;&amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; e) noise and vibration control;&amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; f) a waste management plan for recycling/disposing of waste resulting from demolition \r\nand construction works. &lt;/p&gt;&lt;p&gt;\r\n \r\n Demolition and construction work and associated activities, other than internal works inaudible \r\noutside the site boundary, are only to be carried out between the hours of \r\n 08:00 and 18:00 Monday to Friday and 08:00 and 13:00 Saturday, with no work on Sundays or \r\npublic holidays without the prior written permission of the Local Planning \r\n Authority. &lt;/p&gt;&lt;p&gt;\r\n Any works which are associated with the generation of ground borne vibration are only to be \r\ncarried out between the hours of 08:00 and 18:00 Monday \r\n to Friday. &lt;/p&gt;&lt;p&gt;\r\n Once approved the Plan shall be adhered to throughout the construction period for the \r\ndevelopment.&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-family: Arial, Helvetica, sans-serif; font-size: 14.6667px;&quot;&gt;No part of the property shall be occupied or used until&amp;nbsp;&lt;/span&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;&lt;span style=&quot;font-family:Arial,Helvetica,sans-serif&quot;&gt;adequate hard standing for the off-street car parking space has been provided&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;font-family: Arial, Helvetica, sans-serif; font-size: 14.6667px;&quot;&gt;in accordance with the approved details.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;No development shall commence until:&amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp;a) an investigation and risk assessment, in addition to any assessment provided with the \r\nplanning application, has been completed in accordance with a scheme to assess the \r\nnature and extent of any contamination on the site, whether or not it originates on the \r\nsite. The contents of the scheme are subject to the approval in writing of the Local \r\nPlanning Authority. The investigation and risk assessment must be undertaken by \r\ncompetent persons, and a written report of the findings must be produced. The written \r\nreport is subject to the approval in writing of the Local Planning Authority. The report of \r\nthe findings must include:&amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp;i. a survey of the extent, scale, and nature of contamination;&amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; ii. an assessment of the potential risks to human health, property (existing or \r\nproposed) including buildings, crops, livestock, pets, woodland, service lines \r\nand pipes, adjoining land, groundwaters and surface waters, ecological \r\nsystems, archaeological sites and ancient monuments; and&amp;nbsp; &amp;nbsp; &amp;nbsp; iii. an appraisal of remedial options, and proposal of the preferred option(s). &lt;/p&gt;&lt;p&gt;\r\n This must be undertaken by a suitably qualified person and in accordance with British \r\nStandard BS 10175: Investigation of Potentially Contaminated Sites – Code \r\n of Practice and the Environment Agency’s Guidelines for the Land Contamination: Risk \r\nManagement (LCRM 2020) (or equivalent if replaced);&amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; b) a detailed remediation scheme, to bring the site to a condition suitable for the intended \r\nuse by removing unacceptable risks to human health, buildings and other property and \r\nthe natural and historical environment, has been prepared and submitted to the Local \r\nPlanning Authority for approval in writing. The scheme must include all works to be \r\nundertaken, proposed remediation objectives and remediation criteria, timetable of \r\nworks and site management procedures. The scheme must ensure that the site will not \r\nqualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in \r\nrelation to the intended use of the land after remediation.&amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; c) The approved remediation scheme must be carried out in accordance with its terms \r\nprior to commencement of the development, other than that required to carry out \r\nremediation, unless otherwise agreed in writing by the Local Planning Authority. The \r\nLocal Planning Authority must be given two weeks written notification of \r\ncommencement of the remediation scheme works. Following completion of measures \r\nidentified in the approved remediation scheme, a verification report that demonstrates \r\nthe effectiveness of the remediation carried out must be produced and is subject to the \r\napproval in writing of the Local Planning Authority. The report shall include results of \r\nsampling and monitoring carried out to demonstrate that the site remediation criteria \r\nhave been met.&amp;nbsp; d) If contamination is found at any time when carrying out the approved development that \r\nwas not previously identified it must be reported in writing immediately to the Local&amp;nbsp; Planning Authority. An investigation and risk assessment must be undertaken in \r\naccordance with the requirements of (a), and where remediation is necessary a \r\nremediation scheme must be prepared in accordance with the requirements of (b), \r\nwhich is subject to the approval in writing of the Local Planning Authority. &lt;/p&gt;&lt;p&gt;\r\n Following completion of measures identified in the approved remediation scheme a \r\nverification report must be prepared, which is subject to the approval in \r\n writing of the Local Planning Authority.&amp;nbsp;&amp;nbsp;&lt;/p&gt;","&lt;p&gt;Prior to commencement of the development, a CLP Pro Forma must be submitted to and approved in writing by the Council. The details shall include the numbers, size and routes of construction vehicles, provisions within/around the site to ensure that all vehicles associated with the construction works are properly managed to prevent any unwanted disruption to other highway users, and other matters relating to traffic management to be agreed with the licencing officers of the council. Approved details shall be implemented throughout the project period and any changes to the document must be reported back to the council’s planning and highways department&lt;/p&gt;"],"last_synced":"2026-04-16T01:58:08.222Z","centroid_northing":186120,"url_planning_app":"https://online-befirst.lbbd.gov.uk/planning/index.html?fa=getApplication&id=36770","lpa_app_no":"25/01471/FULL","site_number":"4","ward":"Valence","locality":null,"last_date_consultation_comments":"30/11/2025","date_building_work_started_under_previous_permission":null,"description":"Construction of a new two- storey 2x bed dwelling with associated external amenity space, car parking, refuse and cycle storage at land adjacent to 4 Grafton Road Dagenham RM8 3EP","parking_details":{"no_proposed_car":1,"no_proposed_cycle":2,"no_existing_car":1,"net_cycle":2,"no_existing_cycle":0,"net_car":0},"postcode":"RM8 3EP","appeal_status":null,"cil_liability":null,"date_building_work_completed_under_previous_permission":null,"pp_id":"14414433","status":"Approved","last_updated_by":"Portal","polygon":{"crs":{"type":"name","properties":{"name":"EPSG:27700"}},"type":"geometrycollection","geometries":[{"coordinates":[[[548535.224052515,186108.295936872],[548536.543678025,186110.541268772],[548539.43869488,186111.945920054],[548535.851434459,186120.060700194],[548534.160793211,186124.274157413],[548529.950482391,186135.308068165],[548518.429425319,186118.492809989],[548525.001810108,186114.3543214],[548532.164734963,186109.820659064],[548535.224052515,186108.295936872]]],"type":"Polygon"}]},"wgs84_polygon":{"coordinates":[[[0.141087,51.554312],[0.141107,51.554332],[0.14115,51.554344],[0.141101,51.554417],[0.141079,51.554456],[0.141023,51.554556],[0.14085,51.554408],[0.140942,51.554369],[0.141044,51.554326],[0.141087,51.554312]]],"type":"Polygon"},"appeal_decision_date":null,"secondary_street_name":null,"lapsed_date":"16/12/2028","bo_system":"Portal","decision_date":"16/12/2025","centroid_easting":548529,"actual_commencement_date":null,"id":"Barking_&_Dagenham-25_01471_FULL","lpa_name":"Barking & Dagenham","decision_target_date":"27/12/2025","valid_date":"01/11/2025","development_type":"Minor dwellings","last_updated":"2026-04-15T11:21:56.380Z","subdivision_of_building":"Garden land","reference_no_of_permission_being_relied_on":null,"centroid":{"lat":51.554419,"lon":0.141002},"decision_process":null,"application_type_full":"Full planning permission","decision_agency":null,"street_name":"GRAFTON ROAD","appeal_decision":null,"title_number":null,"site_name":null,"appeal_start_date":null,"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Building Works","intended_completion_date":"12/2025","intended_commencement_date":"11/2025"}],"total_gia_gained":89.25,"site_area":0.01,"total_gia_existing":84,"total_gia_lost":0,"existing_proposed_floorspace_details":[{"gia_existing":84,"use_class":"C3","gia_gained":89.25,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"building_details":[{"no_storeys":2,"max_height":8,"building_ref":"1"}],"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":89.25,"total_gia_existing":84,"total_gia_lost":0},"garden_land_lost":false,"residential_details":{"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_bedrooms":2,"total_no_proposed_residential_units":1,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_affordable_units":1,"total_no_proposed_residential_units_affordable_rent":0,"total_no_existing_residential_units":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_market_for_rent":0,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":1,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_market_for_sale":0,"total_no_existing_residential_affordable_units":0,"total_no_existing_residential_units_affordable_rent":0,"habitable_rooms_density":null,"total_no_existing_residential_units_london_shared_ownership":0,"total_gia_gained":89.5,"total_no_proposed_residential_units_social_rent":0,"total_no_existing_residential_units_london_affordable_rent":0,"dwelling_density":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_starter_homes":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_gia_lost":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_intermediate":0,"affordable_percentage":100.0,"total_no_proposed_residential_units_london_shared_ownership":0,"residential_units":[{"provider":"Private","no_habitable_rooms":2,"change_type":"Gain","unit_type":"Terraced Home","no_bedrooms":2,"tenure":"Self-Build and Custom Build","gia":89.5}],"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0},"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":1,"no_new_water_connections_required":1,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":1,"mobile_network_operators_consultation":true,"fire_suppression_system_proposed":true,"no_new_gas_connections_required":1,"ghg_reduction_over_building_regulations":false},"ownership_status":"Private"},"epc_number":"8989-6623-8660-0879-8922","uprn":"100011476","actual_completion_date":null}