{"decision_target_date":"19/12/2025","last_updated_by":"Planning Portal ingest","appeal_decision_date":null,"appeal_status":null,"development_type":"Other change of use","postcode":"IG11 7NZ","title_number":null,"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"N/A","intended_completion_date":"01/2026","intended_commencement_date":"01/2026"}],"total_gia_gained":82,"site_area":0.0222,"total_gia_lost":0,"total_gia_existing":140,"existing_proposed_floorspace_details":[{"gia_existing":140,"gia_gained":82,"use_class":"B8","gia_lost":0}],"projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":82,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":82,"total_gia_lost":0,"total_gia_existing":140},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"urban_greening_factor_score":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":0,"ownership_status":"Private"},"decision_date":"12/12/2025","url_planning_app":"https://online-befirst.lbbd.gov.uk/planning/index.html?fa=getApplication&id=36721","borough":"Barking And Dagenham","locality":"Barking","date_building_work_started_under_previous_permission":null,"bo_system":"Portal","parking_details":{"no_proposed_car":8,"no_existing_car":8,"net_car":0},"site_name":"New England Industrial Estate, Unit 2","epc_number":null,"pp_id":"14436900","subdivision_of_building":null,"status":"Approved","description":"Change of use from mixed B8, F1 (Education), E (Retail) to B8 including ancillary office","decision_conditions":["The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.<br>","Hours of operation\r\n\r\nThe ancillary office use\r\nhereby permitted shall only operate between the hours of 08:00 till 18:00 Monday\r\nto Friday.&nbsp;","No development shall commence until a detailed Transport Assessment has been submitted to and approved in writing by the Local Planning Authority. The Assessment shall demonstrate, but not be limited to, the trip generation and modal split, parking demand, access arrangements, servicing arrangements and measures to promote sustainable transport.","No development shall commence until a Car Park Management Plan has been submitted to and approved in writing by the Local Planning Authority. The plan shall set out how parking demand will be managed and how dedicated spaces will be retained for warehouse use only. The approved plan shall be implemented prior to occupation and maintained thereafter.","Cycle StoragePrior to first use, details of secure,\r\ncovered cycle storage facilities have been submitted to and approved in writing\r\nby the Local Planning Authority. All\r\ncycle storage should be designed and laid out in accordance with the guidance\r\ncontained in the London Cycling Design Standards. &nbsp;The\r\napproved details shall be implemented prior to first use of the development and\r\nthereafter permanently retained for the lifetime of the development. &nbsp;","&lt;p&gt;The development hereby approved shall only be carried out in accordance with the following approved plans and documents:&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Amended Planning, Design and Access Statement (received: 20/11/2025)&lt;/li&gt;&lt;li&gt;Flood Risk Assessment (dated: 11/11/2025)&lt;/li&gt;&lt;li&gt;Site Location Plan, Block Plan and Aerial View Photograph of Site (drawing no: 01, revision: 1, dated: 23/10/2025)&lt;/li&gt;&lt;li&gt;Proposed Ground Floor Plan (drawing no.: 04, revision: 1, dated: 23/10/2025)&lt;/li&gt;&lt;li&gt;Proposed First Floor Plan&amp;nbsp;&amp;nbsp;(drawing no.: 05, revision: 1, dated: 23/10/2025)&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;No other drawings or documents apply.&lt;/p&gt;"],"site_number":null,"last_updated":"2026-06-27T18:20:04.292Z","last_date_consultation_comments":"01/12/2025","valid_date":"24/10/2025","actual_commencement_date":null,"centroid_northing":183261,"appeal_decision":null,"decision_agency":null,"lpa_app_no":"25/01525/FULL","date_building_work_completed_under_previous_permission":null,"decision":"Approved","id":"Barking_&_Dagenham-25_01525_FULL","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[544318.027159064,183283.830760146],[544332.902647309,183252.579802415],[544277.377370915,183226.219034021],[544251.655976318,183252.66689299],[544318.027159064,183283.830760146]]],"type":"Polygon"}],"crs":{"type":"name","properties":{"name":"EPSG:27700"}}},"appeal_start_date":null,"decision_process":null,"ward":"Gascoigne","street_name":"Gascoigne Road","secondary_street_name":null,"last_synced":"2026-06-28T02:46:56.254Z","lpa_name":"Barking & Dagenham","reference_no_of_permission_being_relied_on":null,"cil_liability":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[0.078999,51.529837],[0.078997,51.52981],[0.078954,51.529811],[0.078955,51.529838],[0.078999,51.529837]]]},"uprn":100055809,"application_type":"All Other","centroid":{"lat":51.529824,"lon":0.078976},"lapsed_date":"12/12/2028","application_type_full":"Full planning permission","centroid_easting":544307,"actual_completion_date":null}