{"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Development","intended_completion_date":"11/2028","intended_commencement_date":"11/2026"}],"total_gia_gained":141,"site_area":0.0234,"total_gia_existing":80,"total_gia_lost":9,"existing_proposed_floorspace_details":[{"gia_existing":80,"use_class":"C3","gia_gained":141,"gia_lost":9}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":true,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":141,"total_gia_existing":80,"total_gia_lost":9},"garden_land_lost":true,"internal_resi_water_usage":125,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":1,"no_new_water_connections_required":1,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":1,"ghg_reduction_over_building_regulations":false},"ownership_status":"Private"},"parking_details":null,"secondary_street_name":null,"appeal_start_date":null,"lapsed_date":"02/02/2029","actual_commencement_date":null,"last_updated_by":"Portal","cil_liability":null,"last_updated":"2026-04-15T11:20:40.098Z","street_name":"GROSVENOR ROAD","decision":"Approved","epc_number":null,"decision_date":"02/02/2026","reference_no_of_permission_being_relied_on":null,"actual_completion_date":null,"url_planning_app":"https://online-befirst.lbbd.gov.uk/planning/index.html?fa=getApplication&id=36819","date_building_work_started_under_previous_permission":null,"status":"Approved","centroid":{"lon":0.147818,"lat":51.563754},"appeal_status":null,"decision_target_date":"07/01/2026","lpa_app_no":"25/01628/FULL","postcode":"RM8 1NP","application_type_full":"Full planning permission","uprn":"100012622","title_number":null,"decision_agency":null,"subdivision_of_building":null,"appeal_decision_date":null,"borough":"London Borough of Barking and Dagenham","centroid_northing":187172,"description":"Demolition of existing single storey side extension and construction of a new two storey 2 bed dwelling","appeal_decision":null,"id":"Barking_&_Dagenham-25_01628_FULL","site_name":null,"development_type":"Minor dwellings","pp_id":"14484303","lpa_name":"Barking & Dagenham","wgs84_polygon":{"type":"Polygon","coordinates":[[[0.147627,51.563773],[0.147678,51.563781],[0.147735,51.563789],[0.14778,51.563796],[0.147842,51.563805],[0.147878,51.563811],[0.147938,51.563819],[0.147946,51.5638],[0.147956,51.563775],[0.147967,51.563749],[0.147978,51.563722],[0.147947,51.563717],[0.147883,51.563707],[0.147823,51.563702],[0.147783,51.5637],[0.147751,51.563701],[0.147725,51.563703],[0.147681,51.563709],[0.147661,51.563718],[0.147651,51.563726],[0.147646,51.563732],[0.147636,51.563752],[0.147627,51.563773]]]},"site_number":"18","last_date_consultation_comments":"08/12/2025","valid_date":"12/11/2025","application_type":"All Other","decision_conditions":["The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.<br>","<p class=\"MsoNormal\">The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing dwellinghouse.<br></p>","&lt;p&gt;&amp;nbsp;Prior to commencement of the development an Air \r\nQuality Neutral assessment considering emissions from buildings and transport sources \r\nshall be submitted to and approved in writing by the Local Planning Authority. The \r\nassessment methodology used shall be in line with the GLA Air Quality Neutral Guidance \r\n2023.&amp;nbsp;&amp;nbsp;&lt;/p&gt;","&lt;p&gt;The proposed development shall achieve Secured by design principles to the satisfaction of the local \r\nauthority &amp;amp; Metropolitan Police, details of which shall be provided to the Local Planning Authority for \r\nits written approval prior to the first occupation of the approved development. All security measures \r\napplied to the approved development shall be permanently retained thereafter.&lt;/p&gt;","&lt;p&gt;Notwithstanding the provisions of The Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no development falling within Classes A and E in Part 1 of Schedule 2 to that Order shall be carried out without the prior written permission of the Local Planning Authority.&lt;br&gt;&lt;/p&gt;","&lt;p&gt;An application to&amp;nbsp;reinstate the existing dropped kerb back to footway and introduce a new shared crossing must be submitted to, and approved in writing by, the LPA, prior to commencement of the development.&amp;nbsp;&amp;nbsp;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-family: Arial, Helvetica, sans-serif; font-size: 14.6667px; background-color: rgb(229, 229, 229);&quot;&gt;No part of the property shall be occupied or used until the cycle storage arrangements have been implemented in accordance with the approved details. The cycle storage arrangements shall thereafter be retained.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;background-color: rgb(229, 229, 229);&quot;&gt;Prior to commencement of the development, a CLP Pro Forma must be submitted to and approved in writing by the Council. The details shall include the numbers, size and routes of construction vehicles, provisions within/around the site to ensure that all vehicles associated with the construction works are properly managed to prevent any unwanted disruption to other highway users, and other matters relating to traffic management to be agreed with the licencing officers of the council. Approved details shall be implemented throughout the project period and any changes to the document must be reported back to the council’s planning and highways department.&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;No development shall commence, \r\nincluding any works of demolition, until a Construction Environmental Management Plan \r\n(CEMP)has been submitted to and approved in writing by the Local Planning Authority. This \r\nPlan shall incorporate details of: \r\na) the parking of site operatives’ vehicles. \r\nb) loading and unloading of plant and materials; \r\nc) storage of plant and materials used in constructing the development; \r\nd) measures to control the emission of dust, dirt, and emissions to air during \r\nconstruction; \r\ne) noise and vibration control; \r\nf) a waste management plan for recycling/disposing of waste resulting from demolition \r\nand construction works. \r\n \r\n Demolition and construction work and associated activities, other than internal works inaudible \r\noutside the site boundary, are only to be carried out between the hours of \r\n 08:00 and 18:00 Monday to Friday and 08:00 and 13:00 Saturday, with no work on Sundays or \r\npublic holidays without the prior written permission of the Local Planning \r\n Authority. \r\n Any works which are associated with the generation of ground borne vibration are only to be \r\ncarried out between the hours of 08:00 and 18:00 Monday \r\n to Friday. \r\n Once approved the Plan shall be adhered to throughout the construction period for the \r\ndevelopment.&amp;nbsp;&amp;nbsp;&lt;/p&gt;","&lt;p&gt;With regard to surface water drainage, the applicant must&amp;nbsp;follow the sequential\r\napproach to the disposal of surface water.&amp;nbsp;Public sewers are crossing or close to the development and build over agreements are required for any building works\r\nwithin 3 metres of a public sewer. As such, the applicant must&amp;nbsp; apply to determine if a build over\r\nagreement will be granted prior to commencement of the development.&amp;nbsp;&lt;/p&gt;","&lt;p&gt;The development hereby approved shall only be carried out in accordance with the following approved plans and documents:&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Proposed Access &amp;amp; Parking Arrangements - drawing no. RHC-25-249-01 - dated 17/12/2025&lt;/li&gt;&lt;li&gt;Existing &amp;amp; Proposed Plans and Elevations - drawing no.A25-81-01c - dated September 2025&lt;/li&gt;&lt;li&gt;Location Plan - drawing no. A25-81-LP&lt;/li&gt;&lt;li&gt;Planning, Design &amp;amp; Access Statement - ref: 18GR-2883 - dated 16th October 2025&lt;/li&gt;&lt;li&gt;Appeal Decision - Appeal Ref: APP/Z5060/W/24/3346185 - dated 23rd December 2024&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;No other drawings or documents apply.&lt;/p&gt;"],"bo_system":"Portal","centroid_easting":548971,"locality":null,"ward":"Whalebone","polygon":{"type":"geometrycollection","crs":{"type":"name","properties":{"name":"EPSG:27700"}},"geometries":[{"coordinates":[[[548957.700891966,187173.69951885],[548961.203569854,187174.646187087],[548965.10089197,187175.699518853],[548968.227815896,187176.55038109],[548972.450891974,187177.699518855],[548974.925891976,187178.362518857],[548979.036891978,187179.46451886],[548979.668891978,187177.290518857],[548980.462838117,187174.563739336],[548981.312479717,187171.646352774],[548982.167891978,187168.70951885],[548980.000891976,187168.049518848],[548975.650891974,187166.899518849],[548971.450891972,187166.149518848],[548968.75089197,187165.899518848],[548966.500891969,187165.899518846],[548964.700891968,187166.049518846],[548961.600891966,187166.699518844],[548960.200891966,187167.599518846],[548959.450891966,187168.499518847],[548959.100891966,187169.099518847],[548958.380012561,187171.3668869],[548957.700891966,187173.69951885]]],"type":"Polygon"}]},"decision_process":null,"date_building_work_completed_under_previous_permission":null,"last_synced":"2026-04-16T02:03:08.445Z"}