{"postcode":"RM10 7HD","status":"Approved","decision_agency":null,"subdivision_of_building":null,"appeal_start_date":null,"cil_liability":true,"decision_conditions":["The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.<br>","<p>The development hereby approved shall only be carried out in accordance with the following approved plans and documents:</p><p>JND/1521/12 - Proposed Floor Plans - Oct 2025<br>JND/1521/13 - Proposed Elevations - Oct 2025<br>JND/1521/14 - Location and Block Plan - Oct 2025<br>JND/1521/15 - Proposed Section X X - Jan 2026<br>JND/1521/16 - Existing and Proposed Roof Plan - Oct 2025<br>Parking Stress Survey - n.d.</p><p>No other drawings or documents apply.<br></p>","<p class=\"MsoNormal\">The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing dwellinghouse.<br></p>","No development shall commence, including any works of demolition, until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority. This Plan shall incorporate details of:a) the parking of site operatives’ vehicles;b) loading and unloading of plant and materials;c) storage of plant and materials used in constructing the development;d) measures to control the emission of dust, dirt, and emissions to air during construction;e) noise and vibration controlf) a waste management plan for recycling/disposing of waste resulting from demolition and construction works.Demolition and construction work and associated activities, other than internal works inaudible outside the site boundary, are only to be carried out between the hours of 08:00 and 18:00 Monday to Friday and 08:00 and 13:00 Saturday, with no work on Sundays or public holidays without the prior written permission of the Local Planning Authority. Any works which are associated with the generation of ground borne vibration are only to be carried out between the hours of 08:00 and 18:00 Monday to Friday.Once approved the Plan shall be adhered to throughout the construction period for the development.","Prior to commencement of the development, a CLP Pro Forma must be submitted to and approved in writing by the Council. The details shall include the numbers, size and routes of construction vehicles, provisions within/around the site to ensure that all vehicles associated with the construction works are properly managed to prevent any unwanted disruption to other highway users, and other matters relating to traffic management to be agreed with the licencing officers of the council. Approved details shall be implemented throughout the project period and any changes to the document must be reported back to the council’s planning and highways department.","Prior to first occupation, details of cycle parking spaces shall be submitted to, and approved in writing by, the Local Planning Authority. The proposed cycle parking spaces shall be designed and laid out in accordance with the guidance contained in the London Cycling Design Standards. The details approved shall be implemented prior to first occupation and retained for the lifetime of the development.","Prior to first occupation, details of refuse storage shall be submitted to and approved by the Local Planning Authority. The approved refuse storage shall be provided before the occupation of the development and thereafter permanently retained.","Notwithstanding the details shown on the hereby approved plans, no above ground new development shall commence until detailed soft and hard landscaping strategies are submitted to, and approved in writing by, the Local Planning Authority. This shall include but not be limited to hard surfacing materials proposed to be used, boundary treatment, details of front curtilage arrangement, details of the garden subdivision, access arrangements and planting plans.The hard landscaping and boundary treatments as approved shall be implemented in full prior to first occupation and maintained in accordance with the details provided.The soft landscaping details as approved shall be carried out in the first available planting season following the date of that permission. Any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased, shall be replaced in the next planting season with others of similar size and species unless the Local Planning Authority gives written consent to any variation.","The effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition “(the biodiversity gain condition”) that development may not begin unless:(a) a Biodiversity Gain Plan has been submitted to the planning authority, and(b) the planning authority has approved the plan.The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan in respect of this permission would be London Borough of Barking and Dagenham.Based on the information available this permission is considered to be one which will require the approval of a biodiversity gain plan before development is begun because none of the statutory exemptions or transitional arrangements are considered to apply.Please see informatives and notes for further information in relation to the condition, exemptions, transitional arrangements, irreplaceable habitats and the effect of 73(D) of the Town and Country Planning Act 1990.","Notwithstanding the provisions of The Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no development falling within Classes A, B, D or E in Part 1 of Schedule 2 to that Order shall be carried out to the new dwelling hereby approved without the prior written permission of the Local Planning Authority."],"actual_commencement_date":null,"pp_id":"14605928","decision_target_date":"05/03/2026","valid_date":"08/01/2026","lpa_app_no":"26/00026/FULL","locality":null,"appeal_decision_date":null,"parking_details":{"net_cycle":2,"no_proposed_cycle":2,"no_existing_cycle":0},"decision_process":null,"street_name":"FRIZLANDS LANE","last_synced":"2026-05-13T03:18:49.655Z","site_number":"129","centroid_easting":549544,"polygon":{"crs":{"properties":{"name":"EPSG:27700"},"type":"name"},"geometries":[{"coordinates":[[[549558.394943148,186398.334061417],[549558.034629978,186387.311635672],[549534.104516414,186389.340162622],[549531.622007171,186389.608732444],[549530.403686022,186389.610793875],[549529.237955971,186390.411812984],[549528.781520055,186391.68939544],[549528.712172215,186392.750560521],[549528.983003569,186400.352879661],[549558.394943148,186398.334061417]]],"type":"Polygon"}],"type":"geometrycollection"},"ward":"Heath","centroid_northing":186394,"application_type":"All Other","uprn":"100010228","lapsed_date":"06/05/2029","actual_completion_date":null,"decision":"Approved","site_name":null,"borough":"London Borough of Barking and Dagenham","last_date_consultation_comments":"01/02/2026","application_type_full":"Full planning permission","url_planning_app":"https://online-befirst.lbbd.gov.uk/planning/index.html?fa=getApplication&id=37048","decision_date":"06/05/2026","bo_system":"Portal","development_type":"Minor dwellings","appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Construction of a part two- storey part single storey rear and side extension including a roof extension and a rear dormer extension, including one roof light to the front, to facilitate conversion of roof space into habitable accommodation to create a new 2x bed dwelling with associated car parking, hard and soft landscaping and cycle and refuse storage at land adjacent to 129 Frizlands Lane Dagenham RM10 7HD ","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-05-12T08:36:58.583Z","centroid":{"lon":0.155748,"lat":51.556613},"lpa_name":"Barking & Dagenham","secondary_street_name":null,"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Construction","intended_commencement_date":"04/2026","intended_completion_date":"08/2026"}],"total_gia_gained":83,"site_area":0.0302,"total_gia_existing":0,"total_gia_lost":0,"existing_proposed_floorspace_details":[{"gia_existing":0,"use_class":"C3","gia_gained":83,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"building_details":[{"no_storeys":2,"max_height":8.2,"building_ref":"New Building"}],"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":83,"total_gia_existing":0,"total_gia_lost":0},"garden_land_lost":false,"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":1,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":1,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"ownership_status":"Private"},"wgs84_polygon":{"coordinates":[[[0.155958,51.556648],[0.155948,51.556549],[0.155604,51.556573],[0.155568,51.556576],[0.15555,51.556577],[0.155534,51.556584],[0.155528,51.556596],[0.155527,51.556605],[0.155535,51.556674],[0.155958,51.556648]]],"type":"Polygon"},"id":"Barking_&_Dagenham-26_00026_FULL","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"Portal"}