{"actual_commencement_date":null,"date_building_work_completed_under_previous_permission":null,"lpa_name":"Barking & Dagenham","subdivision_of_building":"Side Garden ","appeal_decision":null,"lapsed_date":"16/04/2029","appeal_decision_date":null,"last_updated_by":"Portal","reference_no_of_permission_being_relied_on":null,"epc_number":null,"last_updated":"2026-05-12T08:36:58.447Z","url_planning_app":"https://online-befirst.lbbd.gov.uk/planning/index.html?fa=getApplication&id=37235","street_name":"HEPWORTH GARDENS","parking_details":null,"ward":"Longbridge","bo_system":"Portal","site_name":null,"site_number":"30","application_details":{"site_area":0.031702,"total_gia_existing":0,"ownership_status":"Private","phasing_details":[{"phase_detail":"PHASE 1","intended_commencement_date":"12/2025","intended_completion_date":"02/2026"}],"garden_land_lost":true,"total_gia_gained":77,"existing_proposed_floorspace_details":[{"gia_existing":0,"use_class":"C3","gia_gained":77,"gia_lost":0}],"green_suds":false,"scheme_phasing":true,"infrastructure_details":{"no_homes_passive_cooling":1,"no_homes_to_have_electrical_heating":1,"total_annual_pm_emissions":0,"no_new_water_connections_required":1,"waste_provision":true,"no_new_gas_connections_required":1,"no_non_resi_units_to_have_full_fibre":0,"no_resi_units_to_have_full_fibre":1,"percentage_demolition_construction_material_recycling":50,"green_roof_area":0,"mobile_network_operators_consultation":false,"ghg_reduction_over_building_regulations":false,"fire_suppression_system_proposed":false,"total_annual_nox_emissions":0},"rain_water_harvesting":false,"projected_cost_of_works":"Up to £2m","building_details":[{"no_storeys":2,"max_height":7.77,"building_ref":"NEW HOUSE"}],"internal_resi_water_usage":110,"residential_details":{"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_bedrooms":2,"total_no_existing_residential_units_london_shared_ownership":0,"total_no_proposed_residential_units_shared_equity":0,"total_no_existing_residential_affordable_units":0,"total_no_proposed_residential_units_london_affordable_rent":0,"affordable_percentage":0.0,"dwelling_density":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_intermediate":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_existing_residential_units_london_living_rent":0,"habitable_rooms_density":null,"total_no_existing_residential_units":0,"total_no_existing_residential_units_affordable_rent":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_starter_homes":0,"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_proposed_residential_units_social_rent":0,"total_no_proposed_residential_affordable_units":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_proposed_residential_units_market_for_sale":0,"total_no_proposed_residential_units_market_for_rent":1,"total_gia_gained":77,"total_no_existing_residential_units_london_affordable_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0,"total_no_proposed_residential_units_london_shared_ownership":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units":1,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_starter_homes":0,"total_gia_lost":0,"total_no_proposed_residential_units_affordable_rent":0,"residential_units":[{"no_habitable_rooms":3,"provider":"Private","change_type":"Gain","unit_type":"Semi Detached Home","no_bedrooms":2,"tenure":"Market for rent","gia":77}]},"non_residential_details":{"total_gia_existing":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":77,"total_non_resi_gross_internal_floor_area_to_be_gained":0},"affordable_housing_fast_track":false,"grey_water_reuse":false,"total_gia_lost":0,"surface_water_discharge_percentage_reduction":75},"uprn":"100014702","locality":null,"date_building_work_started_under_previous_permission":null,"postcode":"IG11 9AX","valid_date":"18/02/2026","cil_liability":true,"actual_completion_date":null,"centroid":{"lat":51.548299,"lon":0.106993},"centroid_easting":546191,"application_type_full":"Full planning permission","pp_id":"14380855","lpa_app_no":"26/00206/FULL","polygon":{"geometries":[{"coordinates":[[[546186.572096126,185384.598217384],[546187.10089021,185388.149516985],[546188.68833335,185388.739202482],[546190.700890212,185389.449516982],[546191.656298344,185386.244276217],[546192.300890212,185384.099516983],[546192.920058775,185382.354587165],[546195.899087193,185374.616628153],[546198.339970504,185368.40800452],[546201.400890213,185360.649516965],[546195.633890209,185358.313516961],[546189.550890206,185355.84951696],[546186.908502674,185362.468827309],[546185.156424328,185366.857874378],[546184.600890205,185368.249516966],[546184.727890206,185370.012516971],[546184.998890206,185373.792516973],[546185.200890207,185376.599516975],[546185.887168698,185380.602805699],[546186.572096126,185384.598217384]]],"type":"Polygon"}],"crs":{"properties":{"name":"EPSG:27700"},"type":"name"},"type":"geometrycollection"},"id":"Barking_&_Dagenham-26_00206_FULL","appeal_status":null,"appeal_start_date":null,"description":"Construction of a two storey 2x bed dwelling adjacent to 30 Hepworth Gardens, with associated cycle and refuse storage","development_type":"Minor dwellings","decision_conditions":["The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.<br>","<p>The development hereby approved shall only be carried out in accordance with the following approved plans and documents:</p><p>- DRAWING XXX REV XX DATED XX<br>- USE [SHIFT]+[ENTER] FOR REGULAR LINE SPACING<br>- USE [ENTER] FOR LARGER LINE SPACING</p><p>No other drawings or documents apply.</p>","<p class=\"MsoNormal\">The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing dwellinghouse.<br></p>","No development shall commence, including any works of demolition, until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority. This Plan shall incorporate details of:a) the parking of site operatives’ vehicles;b) loading and unloading of plant and materials;c) storage of plant and materials used in constructing the development;d) measures to control the emission of dust, dirt, and emissions to air during construction;e) noise and vibration controlf) a waste management plan for recycling/disposing of waste resulting from demolition and construction works.Demolition and construction work and associated activities, other than internal works inaudible outside the site boundary, are only to be carried out between the hours of 08:00 and 18:00 Monday to Friday and 08:00 and 13:00 Saturday, with no work on Sundays or public holidays without the prior written permission of the Local Planning Authority. Any works which are associated with the generation of ground borne vibration are only to be carried out between the hours of 08:00 and 18:00 Monday to Friday. Once approved the Plan shall be adhered to throughout the construction period for the development.","Prior to commencement of the development, a CLP Pro Forma must be submitted to and approved in writing by the Council. The details shall include the numbers, size and routes of construction vehicles, provisions within/around the site to ensure that all vehicles associated with the construction works are properly managed to prevent any unwanted disruption to other highway users, and other matters relating to traffic management to be agreed with the licencing officers of the council. Approved details shall be implemented throughout the project period and any changes to the document must be reported back to the council’s planning and highways department.","Prior to first occupation, details of cycle parking spaces shall be submitted to, and approved in writing by, the Local Planning Authority. The proposed cycle parking spaces shall be designed and laid out in accordance with the guidance contained in the London Cycling Design Standards. The details approved shall be implemented prior to first occupation and retained for the lifetime of the development.","Prior to first occupation, details of refuse storage shall be submitted to and approved by the Local Planning Authority. The approved refuse storage shall be provided before the occupation of the development and thereafter permanently retained.","No above ground new development shall&nbsp;commence&nbsp;until detailed soft and hard landscaping strategies are&nbsp;submitted&nbsp;to,&nbsp;and approved in writing by,&nbsp;the Local Planning Authority.  This shall include, but not&nbsp;be limited&nbsp;to&nbsp;hard surfacing materials proposed to be used, details of the garden subdivision, access arrangements and planting plans.The hard landscaping and boundary treatments as approved shall be implemented in full prior to first occupation and maintained in accordance with the details provided.The soft landscaping details&nbsp;as approved shall be carried out in the first available planting season following the date of that&nbsp;permission. Any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased, shall be replaced in the next planting season with others of similar size and species unless the Local Planning Authority gives written consent to any variation."],"last_synced":"2026-05-13T03:21:49.764Z","secondary_street_name":null,"title_number":null,"last_date_consultation_comments":"15/03/2026","decision_process":null,"centroid_northing":185371,"borough":"London Borough of Barking and Dagenham","decision":"Approved","application_type":"All Other","wgs84_polygon":{"coordinates":[[[0.106935,51.548422],[0.106944,51.548454],[0.106967,51.548459],[0.106996,51.548465],[0.107008,51.548436],[0.107017,51.548416],[0.107025,51.5484],[0.107065,51.54833],[0.107097,51.548274],[0.107138,51.548203],[0.107054,51.548184],[0.106965,51.548163],[0.10693,51.548223],[0.106907,51.548263],[0.106899,51.548276],[0.106902,51.548292],[0.106907,51.548325],[0.106911,51.548351],[0.106923,51.548386],[0.106935,51.548422]]],"type":"Polygon"},"decision_agency":null,"decision_target_date":"15/04/2026","status":"Approved","decision_date":"16/04/2026"}