{"actual_commencement_date":null,"date_building_work_completed_under_previous_permission":null,"lpa_name":"Barking & Dagenham","subdivision_of_building":null,"appeal_decision":null,"lapsed_date":"28/05/2029","appeal_decision_date":null,"last_updated_by":"Portal","reference_no_of_permission_being_relied_on":null,"epc_number":null,"last_updated":"2026-06-09T07:29:59.942Z","url_planning_app":"https://online-befirst.lbbd.gov.uk/planning/index.html?fa=getApplication&id=37328","street_name":"CAVENDISH GARDENS","parking_details":{"no_proposed_car":2,"no_existing_car":2,"net_car":0},"ward":"Longbridge","bo_system":"Portal","site_name":null,"site_number":"35","application_details":{"site_area":0.0413,"total_gia_existing":216.3,"ownership_status":"Private","phasing_details":[{"phase_detail":"MAIN","intended_completion_date":"08/2026","intended_commencement_date":"06/2026"}],"garden_land_lost":false,"total_gia_gained":323.8,"existing_proposed_floorspace_details":[{"gia_existing":216.3,"use_class":"C3","gia_gained":161.9,"gia_lost":216.3},{"gia_existing":0,"use_class":"SpecifiedOther","gia_gained":161.9,"gia_lost":0}],"green_suds":false,"scheme_phasing":true,"infrastructure_details":{"no_homes_passive_cooling":0,"no_homes_to_have_electrical_heating":0,"total_annual_pm_emissions":5.3,"no_new_water_connections_required":0,"waste_provision":true,"no_new_gas_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"no_resi_units_to_have_full_fibre":0,"percentage_demolition_construction_material_recycling":0,"green_roof_area":0,"mobile_network_operators_consultation":false,"ghg_reduction_over_building_regulations":false,"fire_suppression_system_proposed":false,"total_annual_nox_emissions":5.3},"rain_water_harvesting":false,"projected_cost_of_works":"Up to £2m","building_details":[{"no_storeys":2,"max_height":8.55,"building_ref":"SIDE"}],"internal_resi_water_usage":60,"residential_details":{"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_bedrooms":4,"total_no_existing_residential_units_london_shared_ownership":0,"total_no_proposed_residential_units_shared_equity":0,"total_no_existing_residential_affordable_units":0,"total_no_proposed_residential_units_london_affordable_rent":0,"affordable_percentage":0.0,"dwelling_density":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_intermediate":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_existing_residential_units_london_living_rent":0,"habitable_rooms_density":null,"total_no_existing_residential_units":0,"total_no_existing_residential_units_affordable_rent":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_starter_homes":0,"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_proposed_residential_units_social_rent":0,"total_no_proposed_residential_affordable_units":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_proposed_residential_units_market_for_sale":0,"total_no_proposed_residential_units_market_for_rent":1,"total_gia_gained":162,"total_no_existing_residential_units_london_affordable_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0,"total_no_proposed_residential_units_london_shared_ownership":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units":1,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_starter_homes":0,"total_gia_lost":0,"total_no_proposed_residential_units_affordable_rent":0,"residential_units":[{"provider":"Private","no_habitable_rooms":5,"change_type":"Gain","unit_type":"Semi Detached Home","no_bedrooms":4,"tenure":"Market for rent","gia":162}]},"non_residential_details":{"total_gia_existing":216.3,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":216.3,"total_gia_gained":323.8,"total_non_resi_gross_internal_floor_area_to_be_gained":0},"affordable_housing_fast_track":false,"grey_water_reuse":false,"total_gia_lost":216.3,"surface_water_discharge_percentage_reduction":0},"uprn":"100005904","locality":null,"date_building_work_started_under_previous_permission":null,"postcode":"IG11 9DR","valid_date":"11/03/2026","cil_liability":true,"actual_completion_date":null,"centroid":{"lat":51.546141,"lon":0.096451},"centroid_easting":545467,"application_type_full":"Full planning permission","pp_id":"14757402","lpa_app_no":"26/00288/FULL","polygon":{"geometries":[{"coordinates":[[[545469.600889792,185123.849516649],[545465.266889789,185120.831516646],[545457.903655046,185115.705751259],[545451.711693689,185111.394595623],[545447.050889778,185108.149516633],[545455.780318738,185105.632621669],[545460.721435589,185104.208342918],[545476.094923247,185099.932334117],[545479.450889792,185098.949516634],[545480.268137459,185102.055056394],[545481.200889795,185105.599516637],[545469.600889792,185123.849516649]]],"type":"Polygon"}],"crs":{"properties":{"name":"EPSG:27700"},"type":"name"},"type":"geometrycollection"},"id":"Barking_&_Dagenham-26_00288_FULL","appeal_status":null,"appeal_start_date":null,"description":"Demolition of existing side extensions and the construction of a new two storey 4x bed dwelling including single storey rear extensions and rear dormer extensions for both the host and new dwellings","development_type":"Minor dwellings","decision_conditions":["The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.<br>","&lt;p&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;&lt;span style=&quot;font-family:Arial,Helvetica,sans-serif&quot;&gt;Prior to first occupation of the dwelling, the cycle parking facilities, as approved, &amp;nbsp;shall be implemented. Thereafter, the cycle parking facilities shall be permanently retained. &lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align:justify&quot;&gt;&lt;br&gt;&lt;/p&gt;","&lt;p&gt;The development hereby approved shall only be carried out in accordance with the following approved plans and documents:&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Plans - drawing no. C1-01 -dated February 2026&lt;/li&gt;&lt;li&gt;Plans - drawing no.C1-02 - dated February 2026&lt;/li&gt;&lt;li&gt;Plans - drawing no.C1-03 - dated February 2026&lt;/li&gt;&lt;li&gt;Elevations - drawing no.C1-04 - dated February 2026&lt;/li&gt;&lt;li&gt;Elevations - drawing no.C1-05 - dated February 2026&lt;/li&gt;&lt;li&gt;Elevations - drawing no.C1-06 - dated February 2026&lt;/li&gt;&lt;li&gt;Elevations - drawing no.C1-07 - dated February 2026&lt;/li&gt;&lt;li&gt;Roof Plans - drawing no. C1-08 -dated February 2026&lt;/li&gt;&lt;li&gt;Block Plans - drawing no. C1-09 - dated February 2026&lt;/li&gt;&lt;li&gt;Block Plans - drawing no. C1-13 - dated February 2026&lt;/li&gt;&lt;li&gt;Site Location Plan - ref:&amp;nbsp;PP-14757402v1 - dated 06 March 2026&lt;/li&gt;&lt;li&gt;Design and Access Statement&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;No other drawings or documents apply.&lt;/p&gt;","<p class=\"MsoNormal\">The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing dwellinghouse.<br></p>","&lt;p&gt;The proposed development shall achieve security standards (based on Secured by Design principles) to \r\nthe satisfaction of the local authority &amp;amp; Metropolitan Police, details of which shall be provided to the \r\nLocal Planning Authority for its written approval prior to the first occupation of the approved \r\ndevelopment. All security measures applied to the approved development shall be permanently \r\nretained thereafter.&amp;nbsp;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;&lt;span style=&quot;font-family:Arial,Helvetica,sans-serif&quot;&gt;Notwithstanding the provisions of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (or any order revoking and re-enacting that Order with or without modification), no development falling within Classes A, B, C, D or E in Part 1 of Schedule 2 to that Order shall be carried out without the prior written permission of the Local Planning Authority.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;&amp;nbsp;No development shall commence until:\r\na. an investigation and risk assessment, in addition to any assessment provided with the planning\r\napplication, has been completed in accordance with a scheme to assess the nature and extent\r\nof any contamination on the site, whether or not it originates on the site. The contents of the\r\nscheme are subject to the approval in writing of the Local Planning Authority. The investigation\r\nand risk assessment must be undertaken by competent persons, and a written report of the\r\nfindings must be produced. The written report is subject to the approval in writing of the Local\r\nPlanning Authority. The report of the findings must include:\r\ni. a survey of the extent, scale, and nature of contamination.\r\nii. an assessment of the potential risks to human health, property (existing or proposed)\r\nincluding buildings, crops, livestock, pets, woodland, service lines and pipes, adjoining\r\nland, groundwaters and surface waters, ecological systems, archaeological sites, and\r\nancient monuments;  and\r\niii. an appraisal of remedial options, and proposal of the preferred option(s).\r\n \r\n                             This must be undertaken by a suitably qualified person and in accordance with British Standard BS\r\n10175: Investigation of Potentially Contaminated Sites – Code\r\n                              of Practice and the Environment Agency’s Guidelines for the Land Contamination: Risk\r\nManagement (LCRM 2020) (or equivalent if replaced);\r\n \r\nb. a detailed remediation scheme, to bring the site to a condition suitable for the intended use by\r\nremoving unacceptable risks to human health, buildings and other property and the natural and\r\nhistorical environment, has been prepared and submitted to the Local Planning Authority for\r\napproval in writing. The scheme must include all works to be undertaken, proposed remediation\r\nobjectives and remediation criteria, timetable of works and site management procedures. The\r\nscheme must ensure that the site will not qualify as contaminated land under Part 2A of the\r\nEnvironmental Protection Act 1990 in relation to the intended use of the land after remediation.\r\n \r\nc. The approved remediation scheme must be carried out in accordance with its terms prior to\r\ncommencement of the development, other than that required to carry out remediation, unless\r\notherwise agreed in writing by the Local Planning Authority. The Local Planning Authority must\r\nbe given two weeks written notification of commencement of the remediation scheme works.\r\nFollowing completion of measures identified in the approved remediation scheme, a verification\r\nreport that demonstrates the effectiveness of the remediation carried out must be produced and\r\nis subject to the approval in writing of the Local Planning Authority. The report shall include\r\nresults of sampling and monitoring carried out to demonstrate that the site remediation criteria\r\nhave been met.\r\n \r\nd. If contamination is found at any time when carrying out the approved development that was not\r\npreviously identified it must be reported in writing immediately to the Local Planning Authority.\r\nAn investigation and risk assessment must be undertaken in accordance with the requirements\r\nof (a), and where remediation is necessary a remediation scheme must be prepared in\r\naccordance with the requirements of (b), which is subject to the approval in writing of the Local\r\nPlanning Authority.\r\n \r\n                        Following completion of measures identified in the approved remediation scheme a verification report\r\nmust be prepared, which is subject to the approval in\r\n                        writing of the Local Planning Authority&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;&lt;span style=&quot;font-family:Arial,Helvetica,sans-serif&quot;&gt;No development above ground level shall take place until details of refuse enclosures showing the design; location and external appearance have been submitted to and approved in writing by the Local Planning Authority. The approved enclosures shall be provided before the commencement of the use and thereafter permanently retained. &lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align:justify&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p style=&quot;text-align:justify&quot;&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;&lt;span style=&quot;font-family:Arial,Helvetica,sans-serif&quot;&gt;&lt;em&gt;.&lt;/em&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-family: Arial, Helvetica, sans-serif; font-size: 11pt;&quot;&gt;Prior to&amp;nbsp;&lt;/span&gt;&lt;span style=&quot;font-family: Arial, Helvetica, sans-serif; font-size: 14.6667px;&quot;&gt;the first occupation and or use of the dwelling hereby consented,&lt;/span&gt;&lt;span style=&quot;font-family: Arial, Helvetica, sans-serif; font-size: 11pt;&quot;&gt;&amp;nbsp;the applicant must enter into a Highways agreement with the London Borough of Barking and Dagenham for the reinstatement of the pavement to the front of the site and t&lt;/span&gt;&lt;span style=&quot;font-family: Arial, Helvetica, sans-serif; font-size: 11pt;&quot;&gt;hereafter retained for the lifetime of the development.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align:justify&quot;&gt;&lt;br&gt;&lt;/p&gt;","&lt;p&gt;No development shall commence, including any\r\nworks of demolition, until a Construction Environmental Management Plan (CEMP)has been submitted\r\nto and approved in writing by the Local Planning Authority.  This Plan shall incorporate details of:\r\n \r\n                a) the parking of site operatives’ vehicles;\r\n                b) loading and unloading of plant and materials;\r\n                c) storage of plant and materials used in constructing the development;\r\n                d) measures to control the emission of dust, dirt, and emissions to air during construction;\r\n                e) noise and vibration control;         \r\n                 f)  a waste management plan for recycling/disposing of waste resulting from demolition and construction\r\nworks.\r\n \r\n           Demolition and construction work and associated activities, other than internal works inaudible outside the site\r\nboundary, are only to be carried out between the hours of\r\n           08:00 and 18:00 Monday to Friday and 08:00 and 13:00 Saturday, with no work on Sundays or public holidays\r\nwithout the prior written permission of the Local Planning\r\n           Authority. \r\n \r\n           Any works which are associated with the generation of ground borne vibration are only to be carried out\r\nbetween the hours of 08:00 and 18:00 Monday to Friday.\r\n \r\n           Once approved the Plan shall be adhered to throughout the construction period for the development.&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;&lt;span style=&quot;font-family:Arial,Helvetica,sans-serif&quot;&gt;Prior to commencement of the development, a CLP Pro Forma must be submitted to and approved in writing by the Council. The details shall include the numbers, size and routes of construction vehicles, provisions within/around the site to ensure that all vehicles associated with the construction works are properly managed to prevent any unwanted disruption to other highway users, and other matters relating to traffic management to be agreed with the licencing officers of the council. Approved details shall be implemented throughout the project period and any changes to the document must be reported back to the council’s planning and highways department.&amp;nbsp;&amp;nbsp; &lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align:justify&quot;&gt;&lt;br&gt;&lt;/p&gt;"],"last_synced":"2026-06-10T01:46:57.349Z","secondary_street_name":null,"title_number":null,"last_date_consultation_comments":"06/04/2026","decision_process":null,"centroid_northing":185110,"borough":"London Borough of Barking and Dagenham","decision":"Approved","application_type":"All Other","wgs84_polygon":{"coordinates":[[[0.096494,51.546264],[0.09643,51.546238],[0.096322,51.546194],[0.096231,51.546157],[0.096163,51.546129],[0.096287,51.546104],[0.096358,51.54609],[0.096578,51.546048],[0.096626,51.546038],[0.096639,51.546066],[0.096654,51.546097],[0.096494,51.546264]]],"type":"Polygon"},"decision_agency":null,"decision_target_date":"06/05/2026","status":"Approved","decision_date":"28/05/2026"}