{"actual_commencement_date":null,"date_building_work_completed_under_previous_permission":null,"lpa_name":"Barking & Dagenham","subdivision_of_building":null,"appeal_decision":null,"lapsed_date":"29/04/2029","appeal_decision_date":null,"last_updated_by":"Portal","reference_no_of_permission_being_relied_on":null,"epc_number":null,"last_updated":"2026-05-12T08:33:05.684Z","url_planning_app":"https://online-befirst.lbbd.gov.uk/planning/index.html?fa=getApplication&id=37317","street_name":"TEMPLE AVENUE","parking_details":{"no_proposed_car":4,"no_existing_cycle":0,"no_existing_car":2,"net_car":2,"net_cycle":4,"no_proposed_cycle":4},"ward":"Whalebone","bo_system":"Portal","site_name":null,"site_number":"110","application_details":{"site_area":0.022350000000000002,"total_gia_existing":141,"ownership_status":"Private","phasing_details":[{"phase_detail":"AS SOON AS PERMISSION IS GRANTED","intended_commencement_date":"06/2026","intended_completion_date":"12/2026"}],"garden_land_lost":true,"total_gia_gained":150.83,"existing_proposed_floorspace_details":[{"gia_existing":141,"use_class":"C3","gia_gained":150.83,"gia_lost":0}],"green_suds":false,"scheme_phasing":true,"infrastructure_details":{"no_homes_passive_cooling":0,"no_active_slow_ev_charging_points":2,"no_homes_to_have_electrical_heating":0,"total_annual_pm_emissions":0,"no_new_water_connections_required":1,"waste_provision":true,"no_passive_slow_ev_charging_points":2,"no_non_resi_units_to_have_full_fibre":0,"no_resi_units_to_have_full_fibre":1,"percentage_demolition_construction_material_recycling":0,"green_roof_area":0,"mobile_network_operators_consultation":false,"no_new_gas_connections_required":1,"ghg_reduction_over_building_regulations":false,"fire_suppression_system_proposed":false,"total_annual_nox_emissions":0},"rain_water_harvesting":false,"projected_cost_of_works":"Up to £2m","building_details":[{"no_storeys":2,"max_height":8.55,"building_ref":"NEW DWELLING"}],"internal_resi_water_usage":109,"residential_details":{"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_bedrooms":3,"total_no_existing_residential_units_london_shared_ownership":0,"total_no_proposed_residential_units_shared_equity":0,"total_no_existing_residential_affordable_units":0,"total_no_proposed_residential_units_london_affordable_rent":0,"affordable_percentage":0.0,"dwelling_density":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_intermediate":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_existing_residential_units_london_living_rent":0,"habitable_rooms_density":null,"total_no_existing_residential_units":0,"total_no_existing_residential_units_affordable_rent":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_starter_homes":0,"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_proposed_residential_units_social_rent":0,"total_no_proposed_residential_affordable_units":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_proposed_residential_units_market_for_sale":0,"total_no_proposed_residential_units_market_for_rent":1,"total_gia_gained":106,"total_no_existing_residential_units_london_affordable_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0,"total_no_proposed_residential_units_london_shared_ownership":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units":1,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_starter_homes":0,"total_gia_lost":0,"total_no_proposed_residential_units_affordable_rent":0,"residential_units":[{"no_habitable_rooms":4,"provider":"Private","change_type":"Gain","unit_type":"Terraced Home","no_bedrooms":3,"tenure":"Market for rent","gia":106}]},"non_residential_details":{"total_gia_existing":141,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":150.83,"total_non_resi_gross_internal_floor_area_to_be_gained":0},"affordable_housing_fast_track":false,"grey_water_reuse":false,"total_gia_lost":0,"surface_water_discharge_percentage_reduction":0},"uprn":"100030139","locality":null,"date_building_work_started_under_previous_permission":null,"postcode":"RM8 1LX","valid_date":"09/03/2026","cil_liability":null,"actual_completion_date":null,"centroid":{"lat":51.565335,"lon":0.149899},"centroid_easting":549110,"application_type_full":"Full planning permission","pp_id":"14580768","lpa_app_no":"26/00300/FULL","polygon":{"geometries":[{"coordinates":[[[549091.100892068,187353.699519009],[549101.381312772,187355.778529854],[549114.143216568,187358.208293461],[549126.250892088,187360.499519021],[549126.850892087,187357.699519022],[549127.264892087,187354.949519018],[549127.400892087,187354.049519021],[549127.168607481,187350.465698269],[549127.050892086,187348.649519013],[549116.352320228,187346.930652384],[549101.500385164,187344.437163534],[549093.250892067,187342.949519003],[549092.035892068,187348.655519006],[549091.100892068,187353.699519009]]],"type":"Polygon"}],"crs":{"properties":{"name":"EPSG:27700"},"type":"name"},"type":"geometrycollection"},"id":"Barking_&_Dagenham-26_00300_FULL","appeal_status":null,"appeal_start_date":null,"description":"Demolition of existing garage and storage area and the construction of a new two storey, 3x bedroom dwelling including the construction of a rear dormer extension","development_type":"Minor dwellings","decision_conditions":["<p class=\"MsoNormal\">The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing dwellinghouse.<br></p>","&lt;p&gt;No development shall commence until:  \r\n \r\na) an investigation and risk assessment, in addition to any assessment provided with the \r\nplanning application, has been completed in accordance with a scheme to assess the \r\nnature and extent of any contamination on the site, whether or not it originates on the \r\nsite. The contents of the scheme are subject to the approval in writing of the Local \r\nPlanning Authority. The investigation and risk assessment must be undertaken by \r\ncompetent persons, and a written report of the findings must be produced. The written \r\nreport is subject to the approval in writing of the Local Planning Authority. The report of \r\nthe findings must include: \r\n \r\ni. a survey of the extent, scale, and nature of contamination.  \r\nii. an assessment of the potential risks to human health, property (existing or \r\nproposed) including buildings, crops, livestock, pets, woodland, service lines \r\nand pipes, adjoining land, groundwaters and surface waters, ecological \r\nsystems, archaeological sites, and ancient monuments;  and \r\niii. an appraisal of remedial options, and proposal of the preferred option(s). \r\n \r\n                             This must be undertaken by a suitably qualified person and in accordance with British \r\nStandard BS 10175: Investigation of Potentially Contaminated Sites – Code  \r\n                              of Practice and the Environment Agency’s Guidelines for the Land Contamination: Risk \r\nManagement (LCRM 2020) (or equivalent if replaced); \r\n2\r\n \r\nb) a detailed remediation scheme, to bring the site to a condition suitable for the intended \r\nuse by removing unacceptable risks to human health, buildings and other property and \r\nthe natural and historical environment, has been prepared and submitted to the Local \r\nPlanning Authority for approval in writing. The scheme must include all works to be \r\nundertaken, proposed remediation objectives and remediation criteria, timetable of \r\nworks and site management procedures. The scheme must ensure that the site will not \r\nqualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in \r\nrelation to the intended use of the land after remediation. \r\n \r\nc) The approved remediation scheme must be carried out in accordance with its terms \r\nprior to commencement of the development, other than that required to carry out \r\nremediation, unless otherwise agreed in writing by the Local Planning Authority. The \r\nLocal Planning Authority must be given two weeks written notification of \r\ncommencement of the remediation scheme works. Following completion of measures \r\nidentified in the approved remediation scheme, a verification report that demonstrates \r\nthe eAectiveness of the remediation carried out must be produced and is subject to the \r\napproval in writing of the Local Planning Authority. The report shall include results of \r\nsampling and monitoring carried out to demonstrate that the site remediation criteria \r\nhave been met. \r\n \r\nd) If contamination is found at any time when carrying out the approved development that \r\nwas not previously identified it must be reported in writing immediately to the Local \r\nPlanning Authority. An investigation and risk assessment must be undertaken in \r\naccordance with the requirements of (a), and where remediation is necessary a \r\nremediation scheme must be prepared in accordance with the requirements of (b), \r\nwhich is subject to the approval in writing of the Local Planning Authority.  \r\n \r\n                        Following completion of measures identified in the approved remediation scheme a \r\nverification report must be prepared, which is subject to the approval in  \r\n                        writing of the Local Planning Authority.&amp;nbsp;&lt;/p&gt;","The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.<br>","<p>The development hereby approved shall only be carried out in accordance with the following approved plans and documents:</p><p>- DRAWING XXX REV XX DATED XX<br>- USE [SHIFT]+[ENTER] FOR REGULAR LINE SPACING<br>- USE [ENTER] FOR LARGER LINE SPACING</p><p>No other drawings or documents apply.</p>","&lt;p&gt;No development shall commence, \r\nincluding any works of demolition, until a Construction Environmental Management Plan \r\n(CEMP)has been submitted to and approved in writing by the Local Planning Authority.  This \r\nPlan shall incorporate details of: \r\n \r\n                a) the parking of site operatives’ vehicles; \r\n                b) loading and unloading of plant and materials; \r\n3\r\n                c) storage of plant and materials used in constructing the development; \r\n                d) measures to control the emission of dust, dirt, and emissions to air during construction; \r\n                e) noise and vibration control;           \r\n                 f)  a waste management plan for recycling/disposing of waste resulting from demolition and \r\nconstruction works. \r\n  \r\n           Demolition and construction work and associated activities, other than internal works inaudible \r\noutside the site boundary, are only to be carried out between the hours of  \r\n           08:00 and 18:00 Monday to Friday and 08:00 and 13:00 Saturday, with no work on Sundays or \r\npublic holidays without the prior written permission of the Local Planning  \r\n           Authority.   \r\n \r\n           Any works which are associated with the generation of ground borne vibration are only to be \r\ncarried out between the hours of 08:00 and 18:00 Monday to Friday. \r\n \r\n           Once approved the Plan shall be adhered to throughout the construction period for the \r\ndevelopment.&lt;/p&gt;","&lt;p&gt;The proposed development shall achieve security standards (based on Secured by Design principles) to \r\nthe satisfaction of the local authority &amp;amp; Metropolitan Police, details of which shall be provided to the \r\nLocal Planning Authority for its written approval prior to the first occupation of the approved \r\ndevelopment. All security measures applied to the approved development shall be permanently \r\nretained thereafter.&amp;nbsp;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-family: Arial, sans-serif; font-size: 16px; background-color: rgb(229, 229, 229);&quot;&gt;Prior to commencement of the development, a CLP Pro Forma must be submitted to and approved in writing by the Council. The details shall include the numbers, size and routes of construction vehicles, provisions within/around the site to ensure that all vehicles associated with the construction works are properly managed to prevent any unwanted disruption to other highway users, and other matters relating to traffic management to be agreed with the licencing officers of the council. Approved details shall be implemented throughout the project period and any changes to the document must be reported back to the council’s planning and highways department.&amp;nbsp;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;background-color: rgb(229, 229, 229);&quot;&gt;Prior to commencement of the development, the applicant must enter into a Highways agreement with the London Borough of Barking and Dagenham for the reinstatement of the pavement to the front of the site. Prior to the first occupation and or use of the dwelling hereby consented, the crossover shall be removed, the pavement reinstated and thereafter retained for the lifetime of the development.&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;Notwithstanding the provisions of The Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no development falling within Classes&amp;nbsp;A, B, C, D or E&amp;nbsp;in Part 1 of Schedule 2 to that Order shall be carried out without the prior written permission of the Local Planning Authority.&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;No development above ground level shall take place until a scheme showing those areas to be soft and hard landscaped and the details of that soft and hard landscaping have been submitted to and approved in writing by the Local Planning Authority. The scheme as approved shall be carried out prior to the occupation of the development and thereafter permanently retained.&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;background-color: rgb(229, 229, 229); font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;span style=&quot;background-color: rgb(229, 229, 229);&quot;&gt;No development above ground level shall take place until there has been submitted to and approved in writing by the Local Planning Authority a plan indicating the position, design, materials, and type of boundary treatment to be erected. The plan shall include pedestrian gates to the&amp;nbsp; rear of the building to prevent unauthorised access to the site. The development shall not be occupied until the approved boundary treatment has been provided. The approved boundary treatment shall be retained unless the Local Planning Authority gives prior written approval for its removal.&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;No development above ground level shall take place until details of refuse enclosures showing the design; location and external appearance have been submitted to and approved in writing by the Local Planning Authority. The approved enclosures shall be provided before the commencement of the use and thereafter permanently retained.&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;Prior to first occupation, details of the cycle parking facilities, as approved,&lt;span style=&quot;text-indent:-18pt&quot;&gt;&amp;nbsp;shall be implemented. The development shall not be occupied until the approved details have been implemented. Thereafter, the cycle parking facilities shall be permanently retained.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;&lt;span style=&quot;font-family:Arial,Helvetica,sans-serif&quot;&gt;&amp;nbsp;A&amp;nbsp;formal application to the Council Highways department will need to be submitted to obtain the necessary approval required for the new vehicular dropped kerbed access proposed to the rear of the site.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;"],"last_synced":"2026-05-13T02:54:33.629Z","secondary_street_name":null,"title_number":null,"last_date_consultation_comments":"03/04/2026","decision_process":null,"centroid_northing":187352,"borough":"London Borough of Barking and Dagenham","decision":"Approved","application_type":"All Other","wgs84_polygon":{"coordinates":[[[0.149627,51.565355],[0.149776,51.565371],[0.149961,51.56539],[0.150137,51.565407],[0.150144,51.565382],[0.150149,51.565357],[0.15015,51.565349],[0.150145,51.565317],[0.150143,51.5653],[0.149988,51.565288],[0.149773,51.565269],[0.149653,51.565258],[0.149638,51.56531],[0.149627,51.565355]]],"type":"Polygon"},"decision_agency":null,"decision_target_date":"04/05/2026","status":"Approved","decision_date":"29/04/2026"}