{"actual_completion_date":null,"appeal_start_date":null,"application_type_full":"Removal/Variation of a condition","decision_conditions":["The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.<br>","<p>The development hereby approved shall only be carried out in accordance with the following approved plans and documents:</p><p>- DRAWING XXX REV XX DATED XX<br>- USE [SHIFT]+[ENTER] FOR REGULAR LINE SPACING<br>- USE [ENTER] FOR LARGER LINE SPACING</p><p>No other drawings or documents apply.</p>","No development approved by this planning permission shall commence until a remediation strategy to deal with the risks associated with contamination of the site in respect of the development hereby permitted, has been submitted to, and approved in writing by, the LPA. This strategy will include the following components:1. Up to date Preliminary Risk Assessment (PRA) and conceptual model following the results of an exploratory investigation2. A detailed site investigation scheme, based on the results from (1) to provide information for a detailed risk assessment to all receptors that may be affected, including those off-site.3. A tiered risk assessment using the results of the site investigation referred to in (2).4. An options appraisal including sustainability and treatability studies of the remediation measures required and how they are to be undertaken.5. A remediation strategy and verification plan providing details of the data that will be collected in order to demonstrate that the works set out in the remediation strategy are complete and identifying any requirements for longer-term monitoring of pollutant linkages, mitigation, maintenance and arrangements for contingency action.Any changes to these components require the written consent of the LPA. The scheme shall be implemented as approved.","Prior to any part of the permitted development being brought into use, a verification report demonstrating the completion of works set out in the approved remediation strategy and the effectiveness of the remediation shall be submitted to, and approved in writing, by the LPA. The report shall include results of sampling and monitoring carried out in accordance with the approved verification plan to demonstrate that the site remediation criteria have been met.","The development hereby permitted may not commence until such time as a detailed scheme for groundwater monitoring in respect of contamination has been submitted to, and approved in writing by, the LPA.The scheme shall, where necessary, be supported by:• detailed sampling and analytical schedules• programme for future maintenance and decommissioning• schedule for submission of interim and final monitoring reports• contingency action plan including the list of potential mitigation measures that will be implemented, should unexpectedly changes in groundwater quality be noted as a result of decommissioning or redevelopment works.The scheme shall be fully implemented and subsequently maintained, in accordance with the timing/phasing arrangements embodied within the scheme, or any details as may subsequently be agreed, in writing, by the LPA.","If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the LPA) shall be carried out until further investigation and a remediation strategy detailing how this contamination will be dealt with has been submitted to, and approved in writing by, the LPA. The remediation strategy shall be implemented as approved.&nbsp;","The development hereby permitted may not commence until such time as a scheme for managing any borehole installed for the investigation of soils, groundwater or geotechnical purposes shall be submitted to and approved in writing by the LPA. The scheme shall provide details of how redundant boreholes are to be decommissioned and how any boreholes that need to be retained, post-development, for monitoring purposes will be secured, protected and inspected. The scheme shall be fully implemented and subsequently maintained, in accordance with the scheme, or any changes as may subsequently be agreed, in writing, by the LPA. The scheme will need to include the following:i. Decommissioning Plan to include intended programme/schedule of works and detailed method statement ii. Borehole Retention Plan to include location, security and protection measures iii. Verification report for the decommissioned boreholes to include records of:• the reason for abandonment; • groundwater level prior to decommissioning; • any removal of casing or attempts to remove the casing; • the depth, position and nature of backfill materials; • problems encountered during decommissioning.","Piling / investigation boreholes using penetrative method hereby permitted by the LPA may not commence until such time as a scheme has been submitted to, and approved in writing by, the LPA.The scheme shall be based on the information submitted as part of the application and, where necessary, supported by:• Foundation Works Risk Assessment• A conceptual site model• Specification of the type, number and depth of proposed piles/ foundations• A detailed groundwater monitoring programme including a schedule for submission of interim and final monitoring reports• A contingency action plan including the list of potential mitigation measures that will be implemented, should unexpected changes in groundwater quality be noted as a result of piling.• Timing/phasing arrangements.The scheme shall be fully implemented and subsequently maintained, in accordance with the timing/phasing arrangements contained in the scheme, or any details as may subsequently be agreed, in writing, by the LPA.","\r\n A detailed Acoustic Report prepared by a competent Acoustic\r\n     Consultant shall be submitted and approved in writing by the Local\r\n     Planning Authority (LPA).\r\n&nbsp;The\r\nreport shall detail all noise sources that may impact on the occupiers of\r\nadjacent premises and noise sensitive property including proposed noise\r\nsensitive development.\r\n&nbsp;The report shall include the assessment of noise levels at times\r\nrepresentative of the operational hours of the process and shall be in\r\naccordance with the latest British Standard BS4142:2014.&nbsp;Where the noise impact assessment finds that measures are required to mitigate\r\nnoise levels a relevant mitigation scheme shall be submitted to and approved in\r\nwriting by the Local Planning Authority (LPA).The measures required by the approved mitigation scheme shall be fully\r\nimplemented prior to first use of the development and shall be maintained\r\nthereafter.","\r\n No\r\n     development shall commence, including any works of demolition, until a\r\n     Construction Environmental Management Plan (CEMP)has been submitted to and\r\n     approved in writing by the Local Planning Authority.&nbsp; This Plan shall\r\n     incorporate details of:\r\n&nbsp;a) the parking of site operatives’ vehicles;b) loading and unloading of plant and materials;c) storage of plant and materials used in constructing the development;d) measures\r\nto control the emission of dust, dirt, and emissions to air during\r\nconstruction;e) noise and vibration\r\ncontrol;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; f)&nbsp;&nbsp;a waste\r\nmanagement plan for recycling/disposing of waste resulting from demolition and\r\nconstruction works.&nbsp;Demolition and construction work and associated activities, other than internal\r\nworks inaudible outside the site boundary, are only to be carried out between\r\nthe hours of 08:00\r\nand 18:00 Monday to Friday and 08:00 and 13:00 Saturday, with no work on\r\nSundays or public holidays without the prior written permission of the Local\r\nPlanning Authority.&nbsp;&nbsp;Any works which are associated with the generation of ground borne vibration\r\nare only to be carried out between the hours of 08:00 and 18:00 Monday to\r\nFriday.&nbsp;Once approved the Plan shall be adhered to throughout the construction period\r\nfor the development."],"decision":"Approved","appeal_decision":null,"valid_date":"14/05/2026","description":"Construction of 12no. Bitumen tanks,&nbsp; polymer storage shed, mill with canopy, mix container and an electricity substation&nbsp;","status":"Approved","last_updated_by":"Portal","site_number":null,"cil_liability":null,"decision_process":null,"development_type":"Minor general industry-storage-warehousing","subdivision_of_building":null,"centroid_northing":181993,"last_updated":"2026-08-07T12:52:43.199Z","lapsed_date":"31/07/2029","bo_system":"Portal","centroid":{"lat":51.517245,"lon":0.144275},"parking_details":null,"url_planning_app":"https://online-befirst.lbbd.gov.uk/planning/index.html?fa=getApplication&id=37664","pp_id":"14790379","locality":"Dagenham","reference_no_of_permission_being_relied_on":null,"uprn":"10090633643","ward":"Barking Riverside","last_synced":"2026-08-08T03:29:20.545Z","application_details":{},"street_name":"HINDMANS WAY","decision_agency":null,"appeal_decision_date":null,"site_name":"Stolthaven Terminal, STOLTHAVEN OPERATIONAL SITE","last_date_consultation_comments":"14/06/2026","secondary_street_name":null,"lpa_name":"Barking & Dagenham","title_number":null,"epc_number":null,"decision_date":"31/07/2026","wgs84_polygon":{"coordinates":[[[0.144431,51.517534],[0.144555,51.517538],[0.144667,51.517542],[0.144683,51.517542],[0.144724,51.517542],[0.144721,51.517527],[0.144707,51.517449],[0.144681,51.517301],[0.144665,51.517209],[0.144633,51.517032],[0.144593,51.516801],[0.144513,51.516834],[0.144462,51.516849],[0.144418,51.516863],[0.14431,51.516929],[0.144091,51.517004],[0.143788,51.517109],[0.143788,51.517383],[0.143759,51.517382],[0.143757,51.517416],[0.143786,51.517417],[0.143783,51.517516],[0.143888,51.51752],[0.144077,51.517525],[0.144431,51.517534]]],"type":"Polygon"},"date_building_work_started_under_previous_permission":null,"decision_target_date":"09/07/2026","postcode":"","appeal_status":null,"polygon":{"crs":{"properties":{"name":"EPSG:27700"},"type":"name"},"geometries":[{"coordinates":[[[548886.900890942,182025.449514961],[548895.504709041,182026.114185002],[548903.230439502,182026.748545411],[548904.336041311,182026.842821979],[548907.180890952,182026.899514965],[548907.050890952,182025.199514964],[548906.341237135,182016.455972891],[548905.000890946,181999.999514945],[548904.193614907,181989.762857243],[548902.55872096,181970.031738719],[548900.500890933,181944.259514902],[548894.856890931,181947.706514902],[548891.28259427,181949.336058952],[548888.177890928,181950.751514905],[548880.488890926,181957.854514908],[548865.070942636,181965.822216987],[548843.660890911,181976.886514916],[548842.824546044,182007.25593924],[548840.774084352,182007.098701827],[548840.515128729,182010.956669734],[548842.537480083,182011.058268539],[548841.994673747,182022.113929231],[548849.250890922,182022.749514949],[548862.373890929,182023.680514953],[548886.900890942,182025.449514961]]],"type":"Polygon"}],"type":"geometrycollection"},"centroid_easting":548877,"date_building_work_completed_under_previous_permission":null,"borough":"London Borough of Barking and Dagenham","id":"Barking_&_Dagenham-26_00378_FULL","application_type":"All Other","lpa_app_no":"26/00378/FULL","actual_commencement_date":null}