{"decision_target_date":"30/05/2026","last_updated_by":"Planning Portal ingest","appeal_decision_date":null,"appeal_status":null,"development_type":"Minor general industry-storage-warehousing","postcode":"","title_number":null,"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Development","intended_commencement_date":"06/2026","intended_completion_date":"11/2026"}],"total_gia_gained":131.63,"site_area":0.10260000000000001,"total_gia_lost":0,"total_gia_existing":569,"existing_proposed_floorspace_details":[{"gia_existing":569,"use_class":"B8","gia_gained":131.63,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","occupation_status":"Vacant","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":131.63,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":131.63,"total_gia_lost":0,"total_gia_existing":569},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"urban_greening_factor_score":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":1,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":0,"ownership_status":"Private","lead_developer_company_name":"HACKNEY MEAT TRADES LTD"},"decision_date":"01/06/2026","url_planning_app":"https://online-befirst.lbbd.gov.uk/planning/index.html?fa=getApplication&id=37463","borough":"London Borough of Barking and Dagenham","locality":"Dagenham","date_building_work_started_under_previous_permission":null,"bo_system":"Portal","parking_details":{"no_existing_car":11,"net_car":-1,"no_proposed_car":10},"site_name":"Unit 2, HEATH PARK INDUSTRIAL ESTATE","epc_number":"0993-9273-2315-9306-8750","pp_id":"14835640","subdivision_of_building":"The documents describe a front extension to the existing warehouse, not work to the whole building","status":"Approved","description":"Construction of a two storey front extension to accommodate office space ancillary to the existing warehouse unit","decision_conditions":["The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.<br>","<p>The development hereby approved shall only be carried out in accordance with the following approved plans and documents:</p><p>- DRAWING XXX REV XX DATED XX<br>- USE [SHIFT]+[ENTER] FOR REGULAR LINE SPACING<br>- USE [ENTER] FOR LARGER LINE SPACING</p><p>No other drawings or documents apply.</p>","Prior to above ground works, full details of external materials shall be submitted to and approved in writing by the Local Planning Authority. This shall include the schedule of materials and annotated, coloured elevational drawings.","Prior to first occupation of the development, a Car Parking Design and Management Plan shall be submitted to, and approved in writing by, the Local Planning Authority. The Plan shall detail:&nbsp;Number and layout of car parking bays including visitor bays and blue badge bays.&nbsp;&nbsp;How blue badge bays will be allocated;&nbsp;Management strategy for all bays including details of who will be responsible for enforcing spaces.&nbsp;&nbsp;&nbsp;All bays must be designed in line with the Traffic Signs Regulations and General Directions (TSRGDs) and shall not have dual uses.&nbsp;&nbsp;&nbsp;The approved car parking areas shall be constructed and marked out prior to the first occupation of the development and thereafter retained permanently for the accommodation of vehicles of occupiers and visitors to the premises and not used for any other purpose.&nbsp;&nbsp;All blue badge car parking spaces shall be constructed and marked out prior to the first occupation of the development as accessible parking bays (to be clearly marked with a British Standard disabled symbol). &nbsp;&nbsp;The approved car parking design and management plan shall thereafter be retained for the lifetime of the development.","Prior to commencement of the development, a CLP Pro Forma must be submitted to and approved in writing by the Council. The details shall include the numbers, size and routes of construction vehicles, provisions within/around the site to ensure that all vehicles associated with the construction works are properly managed to prevent any unwanted disruption to other highway users, and other matters relating to traffic management to be agreed with the licencing officers of the council. Approved details shall be implemented throughout the project period and any changes to the document must be reported back to the council’s planning and highways department.","No development shall commence, including any works of demolition, until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority. This Plan shall incorporate details of:a) the parking of site operatives’ vehicles;b) loading and unloading of plant and materials;c) storage of plant and materials used in constructing the development;d) measures to control the emission of dust, dirt, and emissions to air during construction;e) noise and vibration control;f) a waste management plan for recycling/disposing of waste resulting from demolition and construction works.Demolition and construction work and associated activities, other than internal works inaudible outside the site boundary, are only to be carried out between the hours of 08:00 and 18:00 Monday to Friday and 08:00 and 13:00 Saturday, with no work on Sundays or public holidays without the prior written permission of the Local Planning Authority.Any works which are associated with the generation of ground borne vibration are only to be carried out between the hours of 08:00 and 18:00 Monday to Friday. Once approved the Plan shall be adhered to throughout the construction period for the development.&nbsp;","No development shall commence until:a) an investigation and risk assessment, in addition to any assessment provided with the planning application, has been completed in accordance with a scheme to assess the nature and extent of any contamination on the site, whether or not it originates on the site. The contents of the scheme are subject to the approval in writing of the Local Planning Authority. The investigation and risk assessment must be undertaken by competent persons, and a written report of the findings must be produced. The written report is subject to the approval in writing of the Local Planning Authority. The report of the findings must include:a survey of the extent, scale, and nature of contamination.an assessment of the potential risks to human health, property (existing or proposed) including buildings, crops, livestock, pets, woodland, service lines and pipes, adjoining land, groundwaters and surface waters, ecological systems, archaeological sites, and ancient monuments; andan appraisal of remedial options, and proposal of the preferred option(s).This must be undertaken by a suitably qualified person and in accordance with British Standard BS 10175: Investigation of Potentially Contaminated Sites – Code of Practice and the Environment Agency’s Guidelines for the Land Contamination: Risk Management (LCRM 2020) (or equivalent if replaced);b) a detailed remediation scheme, to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment, has been prepared and submitted to the Local Planning Authority for approval in writing. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation.c) The approved remediation scheme must be carried out in accordance with its terms prior to commencement of the development, other than that required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority. The Local Planning Authority must be given two weeks written notification of commencement of the remediation scheme works. Following completion of measures identified in the approved remediation scheme, a verification report that demonstrates the effectiveness of the remediation carried out must be produced and is subject to the approval in writing of the Local Planning Authority. The report shall include results of sampling and monitoring carried out to demonstrate that the site remediation criteria have been met.d) If contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken in accordance with the requirements of (a), and where remediation is necessary a remediation scheme must be prepared in accordance with the requirements of (b), which is subject to the approval in writing of the Local Planning Authority.Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority.","The proposed development shall achieve security standards (based on Secured by Design principles) to the satisfaction of the local authority &amp; Metropolitan Police, details of which shall be provided to the Local Planning Authority for its written approval prior to the first occupation of the approved development. All security measures applied to the approved development shall be permanently retained thereafter.&nbsp;"],"site_number":null,"last_updated":"2026-08-08T01:14:37.168Z","last_date_consultation_comments":"04/05/2026","valid_date":"04/04/2026","actual_commencement_date":null,"centroid_northing":187393,"appeal_decision":null,"decision_agency":null,"lpa_app_no":"26/00435/FULL","date_building_work_completed_under_previous_permission":null,"decision":"Approved","id":"Barking_&_Dagenham-26_00435_FULL","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[548059.700891553,187405.549518859],[548066.363764376,187405.951274687],[548077.063985514,187406.596491714],[548089.886780586,187407.366734319],[548094.600891571,187407.649518864],[548098.640891571,187400.28951886],[548098.971850822,187396.262847655],[548099.476367296,187388.766349544],[548100.000891569,187380.380518845],[548093.168690187,187380.048252116],[548082.172891559,187379.51351884],[548060.850183008,187378.538905046],[548059.700891553,187405.549518859]]],"type":"Polygon"}],"crs":{"type":"name","properties":{"name":"EPSG:27700"}}},"appeal_start_date":null,"decision_process":null,"ward":"Whalebone","street_name":"FRESHWATER ROAD","secondary_street_name":null,"last_synced":"2026-08-08T02:31:57.411Z","lpa_name":"Barking & Dagenham","reference_no_of_permission_being_relied_on":null,"cil_liability":true,"wgs84_polygon":{"type":"Polygon","coordinates":[[[0.134779,51.566093],[0.134875,51.566095],[0.13503,51.566098],[0.135215,51.566101],[0.135283,51.566102],[0.135338,51.566035],[0.135342,51.565999],[0.135346,51.565931],[0.13535,51.565856],[0.135251,51.565855],[0.135092,51.565853],[0.134784,51.56585],[0.134779,51.566093]]]},"uprn":"10023592614","application_type":"All Other","centroid":{"lat":51.565975,"lon":0.135067},"lapsed_date":"01/06/2029","application_type_full":"Full planning permission","centroid_easting":548080,"actual_completion_date":null}