{"site_name":"ROWALLEN PARADE","lapsed_date":null,"appeal_decision":null,"decision_agency":null,"last_synced":"2026-10-21T15:01:59.862Z","bo_system":"Portal","lpa_app_no":"26/00523/FULL","valid_date":"27/04/2026","title_number":null,"epc_number":null,"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Development","intended_commencement_date":"07/2026","intended_completion_date":"12/2026"}],"total_gia_gained":11,"site_area":0.0455,"total_gia_lost":0,"total_gia_existing":456,"scheme_name":"17 ROWALLAN PARADE","existing_proposed_floorspace_details":[{"gia_existing":456,"use_class":"EG1","gia_gained":11,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","occupation_status":"Vacant","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":10,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":11,"total_gia_lost":0,"total_gia_existing":456},"garden_land_lost":false,"residential_details":{"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_bedrooms":9,"total_no_proposed_residential_units":6,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_affordable_units":1,"total_no_existing_residential_units":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_market_for_rent":0,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_market_for_sale":0,"total_no_existing_residential_affordable_units":0,"total_no_existing_residential_units_affordable_rent":0,"habitable_rooms_density":null,"total_no_existing_residential_units_london_shared_ownership":0,"total_gia_gained":370.6,"total_no_proposed_residential_units_social_rent":0,"total_no_existing_residential_units_london_affordable_rent":0,"dwelling_density":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_starter_homes":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_discount_market_rent":1,"total_no_proposed_residential_units_intermediate":0,"affordable_percentage":16.666666666666668,"total_no_proposed_residential_units_london_shared_ownership":0,"residential_units":[{"provider":"Private rented sector","no_habitable_rooms":1,"change_type":"Gain","no_bedrooms":1,"unit_type":"Studio Bedsit","gia":42},{"provider":"Private rented sector","no_habitable_rooms":2,"change_type":"Gain","no_bedrooms":1,"unit_type":"Flat Apartment Maisonette","gia":58.4,"tenure":"Discount Market Rent"},{"provider":"Private rented sector","no_habitable_rooms":3,"change_type":"Gain","no_bedrooms":2,"unit_type":"Flat Apartment Maisonette","gia":76.2},{"provider":"Private rented sector","no_habitable_rooms":2,"change_type":"Gain","no_bedrooms":1,"unit_type":"Flat Apartment Maisonette","gia":54},{"provider":"Private rented sector","no_habitable_rooms":2,"change_type":"Gain","no_bedrooms":1,"unit_type":"Flat Apartment Maisonette","gia":51.5},{"provider":"Private rented sector","no_habitable_rooms":4,"change_type":"Gain","no_bedrooms":3,"unit_type":"Flat Apartment Maisonette","gia":88.5}],"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0,"total_gia_lost":0},"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":6,"green_roof_area":0,"urban_greening_factor_score":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":6,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":100,"ownership_status":"Private","constraints_details":[{"result":"HMO Article 4","constraints_layer_description":"Article 4 Directions"},{"result":"Proposed Becontree Design Guide Article 4","constraints_layer_description":"Article 4 Directions"},{"result":"11/00799/FUL","constraints_layer_description":"Historic Applications"},{"result":"06/00139/FUL","constraints_layer_description":"Historic Applications"},{"result":"06/00933/FUL","constraints_layer_description":"Historic Applications"},{"result":"11/01063/CDN","constraints_layer_description":"Historic Applications"},{"result":"14/00600/ADV","constraints_layer_description":"Historic Applications"},{"result":"11/00797/FUL","constraints_layer_description":"Historic Applications"},{"result":"98/00014/ADV","constraints_layer_description":"Historic Applications"},{"result":"96/00046/ADV","constraints_layer_description":"Historic Applications"},{"result":"05/00584/FUL","constraints_layer_description":"Historic Applications"},{"result":"11/00186/FUL","constraints_layer_description":"Historic Applications"},{"result":"11/00800/ADV","constraints_layer_description":"Historic Applications"},{"result":"11/00668/FUL","constraints_layer_description":"Historic Applications"},{"result":"99/00464/ADV","constraints_layer_description":"Historic Applications"},{"result":"11/00803/FUL","constraints_layer_description":"Historic Applications"},{"result":"11/00798/FUL","constraints_layer_description":"Historic Applications"},{"result":"51/00031/REDHAV","constraints_layer_description":"Historic Applications"},{"result":"86/00936/REDHAV","constraints_layer_description":"Historic Applications"},{"result":"55/00070/REDHAV","constraints_layer_description":"Historic Applications"},{"result":"85/00924/REDHAV","constraints_layer_description":"Historic Applications"},{"result":"62/00196/REDHAV","constraints_layer_description":"Historic Applications"},{"result":"62/00180/REDHAV","constraints_layer_description":"Historic Applications"},{"result":"62/00182/REDHAV","constraints_layer_description":"Historic Applications"},{"result":"89/01096/REDHAV","constraints_layer_description":"Historic Applications"},{"result":"89/01125/REDHAV","constraints_layer_description":"Historic Applications"},{"result":"89/01095/REDHAV","constraints_layer_description":"Historic Applications"},{"result":"89/01124/REDHAV","constraints_layer_description":"Historic Applications"},{"result":"82/00767/REDHAV","constraints_layer_description":"Historic Applications"},{"result":"10/00520/FUL","constraints_layer_description":"Historic Applications"},{"result":"85/00898/REDHAV","constraints_layer_description":"Historic Applications"},{"result":"84/00888/REDHAV","constraints_layer_description":"Historic Applications"},{"result":"164819","constraints_layer_description":"topoarea"},{"result":"124979","constraints_layer_description":"topoarea"},{"result":"78155","constraints_layer_description":"topoarea"},{"result":"111463","constraints_layer_description":"topoarea"},{"result":"188636","constraints_layer_description":"topoarea"},{"result":"238583","constraints_layer_description":"topoarea"},{"result":"57273","constraints_layer_description":"topoarea"},{"result":"75055","constraints_layer_description":"topoarea"},{"result":"93265","constraints_layer_description":"topoarea"},{"result":"Becontree","constraints_layer_description":"Ward"},{"result":"714","constraints_layer_description":"Commercial Land Use"},{"result":"2178","constraints_layer_description":"Commercial Land Use"},{"result":"715","constraints_layer_description":"Commercial Land Use"},{"result":"2179","constraints_layer_description":"Commercial Land Use"},{"result":"716","constraints_layer_description":"Commercial Land Use"},{"result":"2180","constraints_layer_description":"Commercial Land Use"},{"result":"11/00799/FUL","constraints_layer_description":"Applications"},{"result":"06/00139/FUL","constraints_layer_description":"Applications"},{"result":"14/00600/ADV","constraints_layer_description":"Applications"},{"result":"11/01063/CDN","constraints_layer_description":"Applications"},{"result":"11/00797/FUL","constraints_layer_description":"Applications"},{"result":"98/00014/ADV","constraints_layer_description":"Applications"},{"result":"96/00046/ADV","constraints_layer_description":"Applications"},{"result":"05/00584/FUL","constraints_layer_description":"Applications"},{"result":"11/00186/FUL","constraints_layer_description":"Applications"},{"result":"11/00800/ADV","constraints_layer_description":"Applications"},{"result":"11/00668/FUL","constraints_layer_description":"Applications"},{"result":"99/00464/ADV","constraints_layer_description":"Applications"},{"result":"11/00803/FUL","constraints_layer_description":"Applications"},{"result":"11/00798/FUL","constraints_layer_description":"Applications"},{"result":"89/01125/REDHAV","constraints_layer_description":"Applications"},{"result":"55/00070/REDHAV","constraints_layer_description":"Applications"},{"result":"89/01096/REDHAV","constraints_layer_description":"Applications"},{"result":"89/01095/REDHAV","constraints_layer_description":"Applications"},{"result":"62/00182/REDHAV","constraints_layer_description":"Applications"},{"result":"51/00031/REDHAV","constraints_layer_description":"Applications"},{"result":"62/00196/REDHAV","constraints_layer_description":"Applications"},{"result":"62/00180/REDHAV","constraints_layer_description":"Applications"},{"result":"89/01124/REDHAV","constraints_layer_description":"Applications"},{"result":"85/00924/REDHAV","constraints_layer_description":"Applications"},{"result":"86/00936/REDHAV","constraints_layer_description":"Applications"},{"result":"82/00767/REDHAV","constraints_layer_description":"Applications"},{"result":"10/00520/FUL","constraints_layer_description":"Applications"},{"result":"84/00888/REDHAV","constraints_layer_description":"Applications"},{"result":"85/00898/REDHAV","constraints_layer_description":"Applications"},{"result":"06/00933/FUL","constraints_layer_description":"Applications"},{"result":"26/00042/PRE","constraints_layer_description":"Pre-Applications"},{"result":"Tesco Express, 17, ROWALLEN PARADE Green Lane, Dagenham, Barking And Dagenham, RM8 1XU","constraints_layer_description":"Locations"},{"result":"Atm Site, 17, ROWALLEN PARADE Green Lane, Dagenham, Barking And Dagenham","constraints_layer_description":"Locations"},{"result":"GREEN LANE SHOPPING CENTRE Green Lane, Dagenham, Barking And Dagenham","constraints_layer_description":"Locations"}]},"centroid_easting":null,"decision_process":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[0.120807,51.562869],[0.120908,51.563042],[0.120969,51.563149],[0.121068,51.563126],[0.121152,51.563106],[0.12112,51.56305],[0.121043,51.562917],[0.12099,51.562827],[0.120841,51.562861],[0.120807,51.562869]]]},"reference_no_of_permission_being_relied_on":null,"appeal_start_date":null,"decision_target_date":"22/06/2026","actual_commencement_date":null,"parking_details":null,"last_date_consultation_comments":"23/05/2026","url_planning_app":"https://online-befirst.lbbd.gov.uk/planning/index.html?fa=getApplication&id=37542","last_updated":"2026-10-20T07:25:36.892Z","application_type":"All Other","site_number":"17","lpa_name":"Barking & Dagenham","application_type_full":"Full planning permission","centroid_northing":null,"actual_completion_date":null,"cil_liability":null,"subdivision_of_building":"The ground floor is occupied by Tesco Metro, the proposals relate to the ground floor front entrance and floors one and two.","decision_conditions":["&lt;p&gt;A scheme for the \r\nsound insulation of the partition floor/ceiling between the commercial unit and the structurally \r\nadjoining noise sensitive receiver properties shall be submitted to and approved in writing by \r\nthe Local Planning Authority (LPA).  \r\n               Details of the scheme shall be in accordance with the specification given in the approved \r\nNoise Impact Assessment \r\n                The scheme approved by the LPA shall be fully implemented in accordance with the approved \r\ndetails before the use, hereby permitted, commences. \r\n                The works and scheme shall thereafter be retained in accordance with the approved details.  \r\n             No alteration to the separating partition which undermines the sound insulation integrity shall be \r\nundertaken without the grant of further specific consent of the LPA.&amp;nbsp;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;&lt;span style=&quot;font-family:Arial,Helvetica,sans-serif&quot;&gt;Prior to first occupation, the refuse storage, as approved, must be implemented and&amp;nbsp; shall be permanently retained thereafter. The&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;font-family: Arial, Helvetica, sans-serif; font-size: 11pt;&quot;&gt;council’s refuse department are consulted to ensure the refuse storage is adequate.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align:justify&quot;&gt;&lt;br&gt;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;&lt;span style=&quot;font-family:Arial,Helvetica,sans-serif&quot;&gt;No development shall commence, including any works of demolition, until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority. This Plan shall incorporate details of: &lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;&lt;span style=&quot;font-family:Arial,Helvetica,sans-serif&quot;&gt;a) the parking of site operatives’ vehicles;&amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp;&lt;br&gt;b) loading and unloading of plant and materials;&amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp;&lt;br&gt;c) storage of plant and materials used in constructing the development;&amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp;&lt;br&gt;d) measures to control the emission of dust, dirt and emissions to air during construction;&amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp;&lt;br&gt;e) noise and vibration control;&amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp; &amp;nbsp;&lt;br&gt;f) a waste management plan for recycling/disposing of waste resulting from demolition and construction works. &lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;&lt;span style=&quot;font-family:Arial,Helvetica,sans-serif&quot;&gt;Demolition and construction work and associated activities, other than internal works inaudible outside the site boundary, are only to be carried out between the hours of 08:00 and 18:00 Monday to Friday and 08:00 and 13:00 Saturday, with no work on Sundays or public holidays without the prior written permission of the Local Planning Authority. Any works which are associated with the generation of ground borne vibration are only to be carried out between the hours of 08:00 and 18:00 Monday to Friday. Once approved the Plan shall be adhered to throughout the construction period for the development.&amp;nbsp; &lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align:justify&quot;&gt;&lt;br&gt;&lt;/p&gt;","The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.<br>","<p>The development hereby approved shall only be carried out in accordance with the following approved plans and documents:</p><p>- DRAWING XXX REV XX DATED XX<br>- USE [SHIFT]+[ENTER] FOR REGULAR LINE SPACING<br>- USE [ENTER] FOR LARGER LINE SPACING</p><p>No other drawings or documents apply.</p>","<p class=\"MsoNormal\">The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing dwellinghouse.<br></p>","&lt;p&gt;A \r\ndetailed Acoustic Report prepared by a competent Acoustic Consultant shall be submitted and \r\napproved in writing by the Local Planning Authority (LPA). \r\nThe report shall detail all external noise sources that may impact on the future occupiers, including \r\nexternal mechanical services equipment, transport noise, delivery noise, and other commercially \r\ngenerated noise. The report shall include the assessment of noise levels at times \r\nrepresentative of the operational hours of nearby commercial premises.  \r\nWhere mitigation measures are required to ensure that internal noise levels comply with \r\nrelevant guidance in BS 8233:2014 the report shall detail the required acoustic specification to \r\nensure that an adequate level of sound attenuation is provided.&amp;nbsp;&lt;/p&gt;","&lt;p&gt;The building envelope of the development to which the application refers shall be constructed \r\nto provide sound attenuation against externally generated noise sources to achieve the \r\ninternal ambient noise levels detailed in Table 1 below. The measured or calculated noise \r\nlevels shall be determined in accordance with the latest British Standard 8233:2014 \r\n“Guidance on sound insulation and noise reduction for buildings” .  \r\nDetails of the scheme shall be in accordance with the specification given in the approved \r\nNoise Impact Assessment and shall be submitted to the Local Planning  \r\n1\r\n2\r\n               Authority (LPA) for approval in writing.  Any works which form part of the scheme shall be \r\ncompleted in accordance with the approved details before the dwellings are \r\n               occupied and shall thereafter be retained as approved. \r\n \r\n                Internal noise levels should be achieved with windows open for rapid ventilation purposes. \r\nWhere this cannot be achieved alternative means of ventilation and cooling will \r\n                be required. Where whole house ventilation is provided then acoustically treated inlets and \r\noutlets should ideally be located away from the façade(s) most exposed to  \r\n                noise (and any local sources of air pollution). Any ventilation strategy shall consider the \r\nAssociation of Noise Consultants ‘Acoustics, Ventilation and Overheating:  \r\n                Residential Design Guide’ (2020). \r\n \r\n               Table 1: - Internal Ambient Noise Levels for Dwellings \r\nSituation Location 07:00 – 23:00 \r\nhrs. \r\n23:00 – 07:00 \r\nhrs. \r\nResting Living room 35 dB LAeq,16 \r\nhour - \r\nDining Dining room/area 40 dB LAeq, 16 \r\nhour - \r\nSleeping (daytime \r\nresting) \r\nBedroom 35 dB LAeq,16 \r\nhour \r\n30 dB LAeq, 8 \r\nhour \r\nSleeping                Bedroom - 45 dB LAMax \r\n(several times in \r\nany one hour)  \r\n \r\n \r\n               The design and layout of the development shall be constructed so as to protect external \r\namenity spaces (including gardens, balconies and terraces) against externally  \r\n                Generated noise sources to achieve 50dB(A) LAeq,16hour with a maximum limit of 55dB(A) \r\nLAeq,16hour. Any works which form part of the scheme shall be completed in  \r\n                accordance with the approved details before the dwellings are occupied and shall thereafter \r\nbe retained as approved. The measured or calculated noise levels shall be  \r\n                determined in accordance with the Professional Practice Guidance: Planning &amp;amp; Noise – New \r\nResidential Development’ (2017).&amp;nbsp;&lt;/p&gt;","&lt;p&gt;Before any mechanical services plant \r\nincluding heating, ventilation and air conditioning (HVAC), to which the application refers, is \r\nused at the premises, a scheme shall be submitted to and approved in writing by the Local \r\nPlanning Authority (LPA) which demonstrates that the following noise design requirements \r\ncan be complied with and shall thereafter be retained as approved. \r\na) The cumulative measured or calculated rating level of noise emitted from the mechanical \r\nservices plant to which the application refers, shall be lower than the existing background \r\nnoise level by 10dB at all times when the plant is in operation. \r\n                  Measurements shall be made at a height of 1.2 – 1.5 metres above the adjacent ground level \r\nand at least 3.5 metres from any sound reflecting surfaces other than the  \r\n                  ground or 1 metre from the facade of the nearest first floor (or higher) noise sensitive \r\npremises, and in accordance with the latest British Standard BS4142:2014. The  \r\n                  measurement value shall be adjusted to remove the additional sound energy contribution \r\nfrom reflected surfaces other than from the ground. \r\n \r\n                   An alternative position for assessment /measurement may be used to allow ease of access, \r\nthis must be shown on a map and noise propagation calculations detailed  \r\n                   to show how the design criteria is achieved. \r\n \r\nb) At all times the plant shall be isolated to ensure that vibration amplitudes which causes re\r\nradiated noise do not exceed the limits detailed in table 4 in section 7.7.2 of BS8233:2014 \r\n“Guidance on sound insulation and noise reduction for buildings”. Alternatively, the plant \r\nshall be supported on adequate proprietary anti-vibration mounts to reduce the structural \r\ntransmission of vibration and regenerated noise within adjoining premises.  These shall be \r\nso maintained thereafter.&amp;nbsp;&lt;/p&gt;","&lt;p&gt;No development shall commence, \r\nincluding any works of demolition, until a Construction Environmental Management Plan \r\n(CEMP)has been submitted to and approved in writing by the Local Planning Authority.  This \r\nPlan shall incorporate details of: \r\n \r\n                a) the parking of site operatives’ vehicles; \r\n                b) loading and unloading of plant and materials; \r\n                c) storage of plant and materials used in constructing the development; \r\n                d) measures to control the emission of dust, dirt, and emissions to air during construction; \r\n                e) noise and vibration control;           \r\n                 f)  a waste management plan for recycling/disposing of waste resulting from demolition and \r\nconstruction works. \r\n  \r\n           Demolition and construction work and associated activities, other than internal works inaudible \r\noutside the site boundary, are only to be carried out between the hours of  \r\n           08:00 and 18:00 Monday to Friday and 08:00 and 13:00 Saturday, with no work on Sundays or \r\npublic holidays without the prior written permission of the Local Planning  \r\n           Authority.   \r\n \r\n           Any works which are associated with the generation of ground borne vibration are only to be \r\ncarried out between the hours of 08:00 and 18:00 Monday to Friday. \r\n \r\n           Once approved the Plan shall be adhered to throughout the construction period for the \r\ndevelopment.&amp;nbsp;&lt;/p&gt;","&lt;p&gt;Within 3 months of grant of this planning permission, an Air Quality Neutral Report shall be submitted to the Local Planning Authority for its approval in writing. The report must consider mitigation measures as necessary to ensure the development is Air Quality Neutral, in accordance with the GLA’s Air Quality Neutral Guidance 2023. Any assessment should take account of emissions from the installation of temporary and permanent boilers, transport sources, and all other sources of emissions.&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;","&lt;p&gt;The development hereby approved shall achieve security standards (based on Secured by Design principles) to the satisfaction of the Local Planning Authority and the Metropolitan Police, details of which shall be provided to the Local Planning Authority for its written approval within three months of the date of this planning permission. All security measures applied to the approved development shall be permanently retained thereafter.&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;&lt;span style=&quot;font-family:Arial,Helvetica,sans-serif&quot;&gt;Prior to first occupation, the cycle parking facilities, as approved, shall be implemented. The development shall not be occupied until the approved details have been implemented. Thereafter, the cycle parking facilities shall be permanently retained. &lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align:justify&quot;&gt;&lt;br&gt;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;&lt;span style=&quot;font-family:Arial,Helvetica,sans-serif&quot;&gt;Due to the constrained location of the development, Prior to approval of the application, an outline CLP Pro Forma must be submitted to and approved in writing by the Council. The details shall include the numbers, size and routes of construction vehicles, provisions within/around the site to ensure that all vehicles associated with the construction works are properly managed to prevent any unwanted disruption to other highway users, and other matters relating to traffic management to be agreed with the licencing officers of the council. Approved details shall be implemented throughout the project period and any changes to the document must be reported back to the council’s planning and highways department.&amp;nbsp; &lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align:justify&quot;&gt;&lt;br&gt;&lt;/p&gt;"],"uprn":"100089969","centroid":{"lon":-7.55716,"lat":49.766807},"date_building_work_completed_under_previous_permission":null,"borough":"London Borough of Barking and Dagenham","postcode":"RM8 1XU","date_building_work_started_under_previous_permission":null,"description":"Change of Use of first floor and loft offices (Use Class E(G)) to 6 dwellings (Use Class C3) comprising of 1x3bed, 1x2bed, 2xStudio, and 2x1bed&nbsp;including the construction\r\nof a rear dormer extension","last_updated_by":"Portal","ward":"Becontree","street_name":"GREEN LANE","development_type":"Other change of use","decision_date":null,"appeal_status":null,"appeal_decision_date":null,"polygon":{"crs":{"properties":{"name":"EPSG:27700"},"type":"name"},"type":"geometrycollection","geometries":[{"coordinates":[[[547101.80089099,187018.849518386],[547108.236460231,187038.306218533],[547112.100891001,187050.349518411],[547119.008813364,187048.019176203],[547124.950891006,187045.89951841],[547122.891877515,187039.680507946],[547117.950525119,187024.721883302],[547114.600890995,187014.599518385],[547104.132601866,187018.07531488],[547101.80089099,187018.849518386]]],"type":"Polygon"}]},"secondary_street_name":null,"locality":"ROMFORD","id":"Barking_&_Dagenham-26_00523_FULL","pp_id":"14851447","status":"Application Under Consideration","decision":null}