{"actual_completion_date":null,"appeal_start_date":null,"application_type_full":"Full planning permission","decision_conditions":["The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.<br>","<p>The development hereby approved shall only be carried out in accordance with the following approved plans and documents:</p><p>- DRAWING XXX REV XX DATED XX<br>- USE [SHIFT]+[ENTER] FOR REGULAR LINE SPACING<br>- USE [ENTER] FOR LARGER LINE SPACING</p><p>No other drawings or documents apply.</p>","<p class=\"MsoNormal\">The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing dwellinghouse.<br></p>","&lt;p&gt;The proposed development shall achieve Secured by design principles to the satisfaction of the local \r\nauthority &amp;amp; Metropolitan Police, details of which shall be provided to the Local Planning Authority for \r\nits written approval prior to the first occupation of the approved development. All security measures \r\napplied to the approved development shall be permanently retained thereafter.&amp;nbsp;&lt;/p&gt;","&lt;p style=&quot;margin-bottom:6.0pt; margin-right:0cm; margin-top:12.0pt; text-align:justify&quot;&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;Prior to first occupation of the development, a Car Parking Design and Management Plan shall be submitted to, and approved in writing by, the Local Planning Authority. The Plan shall detail:&lt;/span&gt;&lt;/p&gt;&lt;ol style=&quot;list-style-type:lower-alpha&quot;&gt;&lt;li style=&quot;text-align:justify&quot;&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;Number and layout of car parking bays including loading bays, visitor bays and blue badge bays. &lt;/span&gt;&lt;/li&gt;&lt;li style=&quot;text-align:justify&quot;&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;Details of all active and passive electrical vehicle charging points;&lt;/span&gt;&lt;/li&gt;&lt;li style=&quot;text-align:justify&quot;&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;How blue badge bays will be allocated;&lt;/span&gt;&lt;/li&gt;&lt;li style=&quot;text-align:justify&quot;&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;Details of parking restrictions to be imposed; &lt;/span&gt;&lt;/li&gt;&lt;li style=&quot;text-align:justify&quot;&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;Management strategy for all bays including details of who will be responsible for enforcing spaces.&amp;nbsp; &lt;/span&gt;&lt;/li&gt;&lt;li style=&quot;text-align:justify&quot;&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;Strategy for additional blue badge bays to be created should demand required this.&lt;/span&gt;&lt;/li&gt;&lt;li style=&quot;text-align:justify&quot;&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;Details of the operation of gates providing access to the pick-up drop off area and other parking areas, and measures to be implemented to avoid queuing of traffic within the Heathway and potential impacts to nearby bus stops.&lt;/span&gt;&lt;/li&gt;&lt;/ol&gt;&lt;p style=&quot;text-align:justify&quot;&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;All bays must be designed in line with the Traffic Signs Regulations and General Directions (TSRGDs) and shall not have dual uses. &lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align:justify&quot;&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;The approved Car Parking Design and Management Plan shall thereafter be retained for the lifetime of the development. &lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align:justify&quot;&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;&lt;em&gt;Reason: In the interest of sustainable methods of transport.&lt;/em&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-size:11pt;&quot;&gt;&lt;span style=&quot;font-family:Arial,Helvetica,sans-serif;&quot;&gt;Prior to commencement, details of the materials (render) shall be submitted to and approved in writing by the Local Planning Authority. The development shall be constructed in accordance with the approved materials and thereafter retained permanently.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;","&lt;p&gt;No development shall commence, \r\nincluding any works of demolition, until a Construction Environmental Management Plan \r\n(CEMP)has been submitted to and approved in writing by the Local Planning Authority.  This \r\nPlan shall incorporate details of: \r\n \r\n                a) the parking of site operatives’ vehicles; \r\n                b) loading and unloading of plant and materials; \r\n                c) storage of plant and materials used in constructing the development; \r\n                d) measures to control the emission of dust, dirt, and emissions to air during construction; \r\n                e) noise and vibration control;           \r\n                 f)  a waste management plan for recycling/disposing of waste resulting from demolition and \r\nconstruction works. \r\n  \r\n           Demolition and construction work and associated activities, other than internal works inaudible \r\noutside the site boundary, are only to be carried out between the hours of  \r\n           08:00 and 18:00 Monday to Friday and 08:00 and 13:00 Saturday, with no work on Sundays or \r\npublic holidays without the prior written permission of the Local Planning  \r\n           Authority.   \r\n \r\n           Any works which are associated with the generation of ground borne vibration are only to be \r\ncarried out between the hours of 08:00 and 18:00 Monday to Friday. \r\n \r\n           Once approved the Plan shall be adhered to throughout the construction period for the \r\ndevelopment.&amp;nbsp;&lt;/p&gt;","&lt;p style=&quot;text-align:justify&quot;&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;Prior to the first occupation of the building (extension), a Travel Plan Statement (TPS) shall be submitted in writing and approved by the Local Planning Authority, the information within TPS shall include, but will not be limited to the following:&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;Appointment of a Travel Plan Coordinator – a named person, representing the human face of the travel plan. The Travel Plan Coordinator will lead the delivery of the Travel Plan and be responsible for monitoring its progress&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;Travel Plan report – published and made available to the public&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;Measures to improve modal choice which can include – bus passes, cycle storage facilities, new footway connections, car share database, marketing strategy, new or improved bus stop, real time information etc.&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;Modal share targets are required to identify modal splits that need to be achieved in the life of the development. They need to be Specific, Measurable, Attainable, Realistic, “Time bound” (SMART) Targets&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;Monitoring Mechanism – a systematic approach to measuring the performance of the Travel Plan over time&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-size:11pt&quot;&gt;Resources – a specific allocation of resources and finance to implement the measures of the Travel Plan&lt;/span&gt;&lt;/li&gt;&lt;/ul&gt;","&lt;p class=&quot;Sub-SubTitle&quot;&gt;Prior\r\nto approval of this application, adequate cycle parking spaces must be\r\nidentified and agreed with the highways officer.&amp;nbsp;&lt;span style=&quot;color: rgb(51, 51, 51);&quot;&gt;The cycle storage arrangements shall thereafter be retained.&amp;nbsp;&lt;/span&gt;&amp;nbsp;&lt;/p&gt;&lt;p&gt;\r\n\r\n\r\n\r\n&lt;/p&gt;&lt;p class=&quot;Sub-SubTitle&quot;&gt;&lt;br&gt;&lt;/p&gt;","&lt;p&gt;No development shall commence until:  \r\n \r\na) an investigation and risk assessment, in addition to any assessment provided with the \r\nplanning application, has been completed in accordance with a scheme to assess the \r\nnature and extent of any contamination on the site, whether or not it originates on the \r\nsite. The contents of the scheme are subject to the approval in writing of the Local \r\nPlanning Authority. The investigation and risk assessment must be undertaken by \r\ncompetent persons, and a written report of the findings must be produced. The written \r\nreport is subject to the approval in writing of the Local Planning Authority. The report of \r\nthe findings must include: \r\n \r\ni. a survey of the extent, scale, and nature of contamination.  \r\nii. an assessment of the potential risks to human health, property (existing or \r\nproposed) including buildings, crops, livestock, pets, woodland, service lines \r\nand pipes, adjoining land, groundwaters and surface waters, ecological \r\nsystems, archaeological sites, and ancient monuments;  and \r\niii. an appraisal of remedial options, and proposal of the preferred option(s). \r\n \r\n                             This must be undertaken by a suitably qualified person and in accordance with British \r\nStandard BS 10175: Investigation of Potentially Contaminated Sites – Code  \r\n                              of Practice and the Environment Agency’s Guidelines for the Land Contamination: Risk \r\nManagement (LCRM 2020) (or equivalent if replaced); \r\n \r\nb) a detailed remediation scheme, to bring the site to a condition suitable for the intended \r\nuse by removing unacceptable risks to human health, buildings and other property and \r\nthe natural and historical environment, has been prepared and submitted to the Local \r\nPlanning Authority for approval in writing. The scheme must include all works to be \r\nundertaken, proposed remediation objectives and remediation criteria, timetable of \r\nworks and site management procedures. The scheme must ensure that the site will not \r\nqualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in \r\nrelation to the intended use of the land after remediation. \r\n \r\nc) The approved remediation scheme must be carried out in accordance with its terms \r\nprior to commencement of the development, other than that required to carry out \r\nremediation, unless otherwise agreed in writing by the Local Planning Authority. The \r\nLocal Planning Authority must be given two weeks written notification of \r\ncommencement of the remediation scheme works. Following completion of measures \r\nidentified in the approved remediation scheme, a verification report that demonstrates \r\nthe effectiveness of the remediation carried out must be produced and is subject to the \r\napproval in writing of the Local Planning Authority. The report shall include results of \r\nsampling and monitoring carried out to demonstrate that the site remediation criteria \r\nhave been met. \r\n \r\nd) If contamination is found at any time when carrying out the approved development that \r\nwas not previously identified it must be reported in writing immediately to the Local \r\nPlanning Authority. An investigation and risk assessment must be undertaken in \r\naccordance with the requirements of (a), and where remediation is necessary a \r\n3\r\nremediation scheme must be prepared in accordance with the requirements of (b), \r\nwhich is subject to the approval in writing of the Local Planning Authority.  \r\n \r\n                        Following completion of measures identified in the approved remediation scheme a \r\nverification report must be prepared, which is subject to the approval in  \r\n                        writing of the Local Planning Authority.&amp;nbsp;&lt;/p&gt;","&lt;p&gt;&amp;nbsp;Before any mechanical services plant \r\nincluding heating, ventilation and air conditioning (HVAC), to which the application refers, is \r\nused at the premises, a scheme shall be submitted to and approved in writing by the Local \r\nPlanning Authority (LPA) which demonstrates that the following noise design requirements \r\ncan be complied with and shall thereafter be retained as approved. \r\n \r\na) The cumulative measured or calculated rating level of noise emitted from the mechanical \r\nservices plant to which the application refers, shall be lower than the existing background \r\nnoise level by 10dB at all times when the plant is in operation. \r\n \r\n                      Measurements shall be made at a height of 1.2 – 1.5 metres above the adjacent ground \r\nlevel and at least 3.5 metres from any sound reflecting surfaces other than the  \r\n                      ground or 1 metre from the facade of the nearest first floor (or higher) noise sensitive \r\npremises, and in accordance with the latest British Standard BS4142:2014. The  \r\n                      measurement value shall be adjusted to remove the additional sound energy contribution \r\nfrom reflected surfaces other than from the ground. \r\n \r\n                      An alternative position for assessment /measurement may be used to allow ease of \r\naccess, this must be shown on a map and noise propagation calculations detailed  \r\n                       to show how the design criteria is achieved. \r\n \r\nb) At all times the plant shall be isolated to ensure that vibration amplitudes which causes re\r\nradiated noise do not exceed the limits detailed in table 4 in section 7.7.2 of BS8233:2014 \r\n“Guidance on sound insulation and noise reduction for buildings”. Alternatively, the plant \r\nshall be supported on adequate proprietary anti-vibration mounts to reduce the structural \r\ntransmission of vibration and regenerated noise within adjacent premises.  These shall be \r\nso maintained thereafter.&amp;nbsp;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-family: Arial, sans-serif; font-size: 16px; background-color: rgb(229, 229, 229);&quot;&gt;Prior to commencement of the development, a CLP Pro Forma must be submitted to and approved in writing by the Council. The details shall include the numbers, size and routes of construction vehicles, provisions within/around the site to ensure that all vehicles associated with the construction works are properly managed to prevent any unwanted disruption to other highway users, and other matters relating to traffic management to be agreed with the licencing officers of the council. Approved details shall be implemented throughout the project period and any changes to the document must be reported back to the council’s planning and highways department.&amp;nbsp;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;"],"decision":"Approved","appeal_decision":null,"valid_date":"11/05/2026","description":"Construction of a single storey rear extension to provide additional treatment rooms and waiting area","status":"Approved","last_updated_by":"Portal","site_number":null,"cil_liability":true,"decision_process":null,"development_type":"Minor all other minor developments","subdivision_of_building":"Rear Ground Floor","centroid_northing":185762,"last_updated":"2026-08-26T07:33:49.237Z","lapsed_date":"15/07/2029","bo_system":"Portal","centroid":{"lat":51.551378,"lon":0.131181},"parking_details":{"no_proposed_car":13,"no_existing_car":13,"net_car":0},"url_planning_app":"https://online-befirst.lbbd.gov.uk/planning/index.html?fa=getApplication&id=37636","pp_id":"14882017","locality":"Dagenham","reference_no_of_permission_being_relied_on":null,"uprn":"10023592728","ward":"Parsloes","last_synced":"2026-08-27T02:31:07.358Z","application_details":{"affordable_housing_fast_track":true,"phasing_details":[{"phase_detail":"1","intended_completion_date":"10/2026","intended_commencement_date":"06/2026"}],"total_gia_gained":149,"site_area":0.08650000000000001,"total_gia_lost":0,"total_gia_existing":229.2,"existing_proposed_floorspace_details":[{"gia_existing":229.2,"use_class":"EE","gia_gained":149,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","scheme_phasing":true,"rain_water_harvesting":false,"building_details":[{"no_storeys":0,"max_height":0,"building_ref":"0"}],"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":149,"total_gia_lost":0,"total_gia_existing":229.2},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"urban_greening_factor_score":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":50,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":true,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":true},"internal_resi_water_usage":0,"ownership_status":"Private"},"street_name":"HOBART ROAD","decision_agency":null,"appeal_decision_date":null,"site_name":"Car Park, HEALTH CENTRE","last_date_consultation_comments":"12/06/2026","secondary_street_name":null,"lpa_name":"Barking & Dagenham","title_number":null,"epc_number":"0292-2129-2330-4800-1403","decision_date":"15/07/2026","wgs84_polygon":{"coordinates":[[[0.130913,51.55119],[0.130916,51.551194],[0.130895,51.55121],[0.131044,51.551287],[0.13108,51.551305],[0.13102,51.551444],[0.13099,51.551514],[0.131019,51.551536],[0.13104,51.551553],[0.13115,51.551563],[0.131356,51.551582],[0.131424,51.551588],[0.131432,51.551551],[0.131437,51.551541],[0.131443,51.551534],[0.131464,51.551518],[0.131506,51.551488],[0.131465,51.551467],[0.13145,51.551459],[0.131455,51.551455],[0.131417,51.551435],[0.131299,51.551375],[0.131279,51.551365],[0.131257,51.551312],[0.131292,51.551285],[0.131332,51.551256],[0.131249,51.551213],[0.13113,51.551152],[0.13103,51.5511],[0.130956,51.551157],[0.130913,51.55119]]],"type":"Polygon"},"date_building_work_started_under_previous_permission":null,"decision_target_date":"06/07/2026","postcode":"","appeal_status":null,"polygon":{"crs":{"properties":{"name":"EPSG:27700"},"type":"name"},"geometries":[{"coordinates":[[[547840.050891122,185740.499517562],[547840.250891123,185740.999517559],[547838.750891122,185742.749517559],[547848.794020342,185751.547392239],[547851.250891131,185753.699517573],[547846.636643964,185768.969677316],[547844.300891132,185776.699517586],[547846.243576646,185779.270718188],[547847.700891134,185781.199517591],[547855.262305304,185782.52837116],[547869.519732956,185784.991120815],[547874.200891148,185785.799517601],[547874.850891148,185781.749517598],[547875.200891148,185780.649517598],[547875.686317246,185779.916173305],[547877.199730233,185778.186558263],[547880.20089115,185774.849517593],[547877.423374562,185772.435549772],[547876.380891147,185771.529517589],[547876.760891147,185771.099517589],[547874.177987247,185768.844080767],[547866.211830983,185761.887909134],[547864.850891139,185760.699517582],[547863.530891137,185754.769517575],[547866.030380196,185751.917655419],[547868.850891138,185748.699517573],[547863.237262493,185743.801908731],[547855.204627386,185736.738675127],[547848.450891125,185730.749517552],[547843.098891123,185736.961517558],[547840.050891122,185740.499517562]]],"type":"Polygon"}],"type":"geometrycollection"},"centroid_easting":547858,"date_building_work_completed_under_previous_permission":null,"borough":"London Borough of Barking and Dagenham","id":"Barking_&_Dagenham-26_00533_FULL","application_type":"All Other","lpa_app_no":"26/00533/FULL","actual_commencement_date":null}