{"uprn":"100101061","ward":"Whalebone","epc_number":null,"description":"Demolition of existing workshop and the construction of a new workshop (Use Class B2) with ancillary office facilities and associated works","centroid_easting":548315,"decision_date":"16/10/2026","street_name":"FRESHWATER ROAD","last_synced":"2026-10-21T15:01:59.862Z","locality":null,"status":"Application Under Consideration","date_building_work_started_under_previous_permission":null,"application_type_full":"Full planning permission","lpa_name":"Barking & Dagenham","decision_target_date":"26/08/2026","lpa_app_no":"26/00783/FULL","title_number":null,"decision":null,"last_updated":"2026-10-20T07:25:38.011Z","appeal_start_date":null,"actual_commencement_date":null,"bo_system":"Portal","secondary_street_name":null,"decision_agency":null,"last_date_consultation_comments":"02/08/2026","appeal_decision_date":null,"actual_completion_date":null,"centroid_northing":187528,"wgs84_polygon":{"type":"Polygon","coordinates":[[[0.13843,51.56655],[0.138417,51.566698],[0.138402,51.566876],[0.138377,51.567139],[0.138341,51.567565],[0.138335,51.567643],[0.138395,51.567671],[0.138464,51.567698],[0.138531,51.567719],[0.138586,51.567732],[0.138594,51.567676],[0.138602,51.567587],[0.138626,51.567322],[0.138655,51.567001],[0.138673,51.566788],[0.138685,51.566653],[0.138693,51.566558],[0.13843,51.56655]]]},"date_building_work_completed_under_previous_permission":null,"lapsed_date":"16/10/2029","decision_conditions":["<p class=\"MsoNormal\">The development shall be constructed in accordance with the external materials shown on DRAWING NO. Simplex-1RX-26 PL005 and&nbsp;Simplex-1RX-26 PL008, and to the satisfaction of the Local Planning Authority.<br></p>","<div>No development, including demolition, shall commence until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority. The CEMP shall include details of:</div><div>a) parking of site operatives' vehicles;</div><div>b) loading and unloading of plant and materials;</div><div>c) storage of plant and materials;</div><div>d) measures to control dust, dirt and emissions to air;</div><div>e) noise and vibration control measures; and</div><div>f) a waste management plan for recycling/disposing of waste resulting from demolition and construction works.</div><div>Demolition and construction works shall only be carried out between 08:00-18:00 Monday to Friday and 08:00-13:00 Saturdays, with no works on Sundays or Bank Holidays unless otherwise agreed in writing by the Local Planning Authority.&nbsp;</div><div>Any works which are associated with the generation of ground borne vibration are only to be carried out between the hours of 08:00 and 18:00 Monday to Friday.</div><div>The approved CEMP shall be adhered to throughout the construction period.</div><div><br></div>","<div>No development shall commence until a Construction Logistics Plan (CLP) has been submitted to and approved in writing by the Local Planning Authority.</div><div>The CLP shall include details of:</div><div>a) construction vehicle routing;</div><div>b) staff travel arrangements;</div><div>c) delivery and collection arrangements;</div><div>d) wheel washing facilities, where required;</div><div>e) temporary traffic management measures; and</div><div>f) measures to minimise impacts on the surrounding highway network.</div><div>The approved CLP shall be adhered to throughout the construction period.</div><div><br></div>","<p class=\"MsoNormal\" style=\"margin-bottom:8.0pt;line-height:115%\">Prior to the first occupation of the new\r\ndevelopment, details of secure and covered cycle parking facilities shall be\r\nsubmitted to and approved in writing by the Local Planning Authority.<o:p></o:p></p>\r\n\r\n<p class=\"MsoNormal\" style=\"margin-bottom:8.0pt;line-height:115%\">The approved facilities shall include\r\nprovision for a minimum of two long-stay cycle parking spaces and two\r\nshort-stay cycle parking spaces and shall thereafter be provided, retained and\r\nmaintained for the lifetime of the development.<o:p></o:p></p>","The use hereby approved shall not commence\r\nuntil a scheme for the extraction and treatment of fumes and odours\r\ncommercially generated from activities undertaken within the premises has been\r\nsubmitted to and approved in writing by the Local Planning Authority.Any equipment, plant or process approved\r\npursuant to such details shall be installed prior to the first use of the\r\npremises and shall thereafter be operated and retained in accordance with the approved\r\ndetails and manufacturer&#39;s instructions.","No development shall commence until:&nbsp;a. an investigation and risk assessment, in addition to any assessment provided with the planning application, has been completed in accordance with a scheme to assess the nature and extent of any contamination on the site, whether or not it originates on the site. The contents of the scheme are subject to the approval in writing of the Local Planning Authority. The investigation and risk assessment must be undertaken by competent persons and a written report of the findings must be produced. The written report is subject to the approval in writing of the Local Planning Authority. The report of the findings must include:&nbsp;i.\ta survey of the extent, scale and nature of contamination;&nbsp;ii.\tan assessment of the potential risks to human health, property (existing or proposed) including buildings, crops, livestock, pets, woodland, service lines and pipes, adjoining land, groundwaters and surface waters, ecological systems, archaeological sites and ancient monuments; and&nbsp;iii.\tan appraisal of remedial options, and proposal of the preferred option(s).&nbsp;This must be undertaken by a suitably qualified person and in accordance with British Standard BS 10175: Investigation of Potentially Contaminated Sites – Code of Practice and the Environment Agency’s Guidelines for the Land Contamination: Risk Management (LCRM 2020) (or equivalent if replaced);&nbsp;b. a detailed remediation scheme, to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment, has been prepared and submitted to the Local Planning Authority for approval in writing. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation.c. The approved remediation scheme must be carried out in accordance with its terms prior to commencement of the development, other than that required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority. The Local Planning Authority must be given two weeks written notification of commencement of the remediation scheme works. Following completion of measures identified in the approved remediation scheme, a verification report that demonstrates the effectiveness of the remediation carried out must be produced and is subject to the approval in writing of the Local Planning Authority. The report shall include results of sampling and monitoring carried out to demonstrate that the site remediation criteria have been met.&nbsp;d. In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken in accordance with the requirements of (a), and where remediation is necessary a remediation scheme must be prepared in accordance with the requirements of (b), which is subject to the approval in writing of the Local Planning Authority.&nbsp;Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority.&nbsp;","Prior to the first occupation of the new development, details of electric vehicle charging infrastructure shall be submitted to and approved in writing by the Local Planning Authority.The approved details shall include the provision of a minimum of one active electric vehicle charging point together with passive provision for future electric vehicle charging infrastructure serving the remaining parking spaces.The approved infrastructure shall be installed prior to first occupation of the development and retained thereafter.","Prior to the first occupation of the new development, details shall be submitted to and approved in writing by the Local\r\nPlanning Authority demonstrating that servicing, loading, unloading and refuse\r\ncollection activities can be undertaken wholly within the site and that\r\nvehicles are capable of entering and leaving the site in a forward gear.The approved arrangements shall be\r\nimplemented prior to first occupation and retained for the lifetime of the\r\ndevelopment.","The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.<br>","<p>The development hereby approved shall only be carried out in accordance with the following approved plans and documents:</p><p class=\"MsoNormal\" style=\"margin-bottom:8.0pt;line-height:115%\">Plans:<b><o:p></o:p></b></p><p class=\"MsoListParagraphCxSpFirst\" style=\"margin-bottom:8.0pt;mso-add-space:\r\nauto;text-indent:-18.0pt;line-height:115%;mso-list:l0 level1 lfo2\"><!--[if !supportLists]--><span style=\"font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family:\r\nSymbol\">·<span style=\"font-style: normal; font-variant: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;\">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;\r\n</span></span><!--[endif]-->Existing\r\nBlock &amp; Site plans - Simplex-1RX-26 PL001 Rev.A <o:p></o:p></p><p class=\"MsoListParagraphCxSpMiddle\" style=\"margin-bottom:8.0pt;mso-add-space:\r\nauto;text-indent:-18.0pt;line-height:115%;mso-list:l0 level1 lfo2\"><!--[if !supportLists]--><span style=\"font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family:\r\nSymbol\">·<span style=\"font-style: normal; font-variant: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;\">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;\r\n</span></span><!--[endif]-->Proposed\r\nBlock &amp; Site plans - Simplex-1RX-26 PL002<o:p></o:p></p><p class=\"MsoListParagraphCxSpMiddle\" style=\"margin-bottom:8.0pt;mso-add-space:\r\nauto;text-indent:-18.0pt;line-height:115%;mso-list:l0 level1 lfo2\"><!--[if !supportLists]--><span style=\"font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family:\r\nSymbol\">·<span style=\"font-style: normal; font-variant: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;\">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;\r\n</span></span><!--[endif]-->Existing\r\nElevations and Sections - Simplex-1RX-26 PL003<o:p></o:p></p><p class=\"MsoListParagraphCxSpMiddle\" style=\"margin-bottom:8.0pt;mso-add-space:\r\nauto;text-indent:-18.0pt;line-height:115%;mso-list:l0 level1 lfo2\"><!--[if !supportLists]--><span style=\"font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family:\r\nSymbol\">·<span style=\"font-style: normal; font-variant: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;\">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;\r\n</span></span><!--[endif]-->Existing\r\nGround Floor &amp; Roof Plans - Simplex-1RX-26 PL004<o:p></o:p></p><p class=\"MsoListParagraphCxSpMiddle\" style=\"margin-bottom:8.0pt;mso-add-space:\r\nauto;text-indent:-18.0pt;line-height:115%;mso-list:l0 level1 lfo2\"><!--[if !supportLists]--><span style=\"font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family:\r\nSymbol\">·<span style=\"font-style: normal; font-variant: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;\">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;\r\n</span></span><!--[endif]-->Proposed\r\nElevations &amp; Sections - Simplex-1RX-26 PL005<o:p></o:p></p><p class=\"MsoListParagraphCxSpMiddle\" style=\"margin-bottom:8.0pt;mso-add-space:\r\nauto;text-indent:-18.0pt;line-height:115%;mso-list:l0 level1 lfo2\"><!--[if !supportLists]--><span style=\"font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family:\r\nSymbol\">·<span style=\"font-style: normal; font-variant: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;\">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;\r\n</span></span><!--[endif]-->Proposed\r\nGround Floor Plan - Simplex-1RX-26 PL006<o:p></o:p></p><p class=\"MsoListParagraphCxSpMiddle\" style=\"margin-bottom:8.0pt;mso-add-space:\r\nauto;text-indent:-18.0pt;line-height:115%;mso-list:l0 level1 lfo2\"><!--[if !supportLists]--><span style=\"font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family:\r\nSymbol\">·<span style=\"font-style: normal; font-variant: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;\">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;\r\n</span></span><!--[endif]-->Proposed\r\nFirst Floor Plan - Simplex-1RX-26 PL007<o:p></o:p></p><p class=\"MsoListParagraphCxSpLast\" style=\"margin-bottom:8.0pt;mso-add-space:\r\nauto;text-indent:-18.0pt;line-height:115%;mso-list:l0 level1 lfo2\"><!--[if !supportLists]--><span style=\"font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family:\r\nSymbol\">·<span style=\"font-style: normal; font-variant: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;\">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;\r\n</span></span><!--[endif]-->Proposed\r\nRoof Plan - Simplex-1RX-26 PL008<o:p></o:p></p><p class=\"MsoNormal\" style=\"margin-bottom:8.0pt;line-height:115%\"><o:p>&nbsp;</o:p></p><p class=\"MsoNormal\" style=\"margin-bottom:8.0pt;line-height:115%\">Documents: <o:p></o:p></p><p class=\"MsoListParagraphCxSpFirst\" style=\"margin-bottom:8.0pt;mso-add-space:\r\nauto;text-indent:-18.0pt;line-height:115%;mso-list:l1 level1 lfo1\"><!--[if !supportLists]--><span style=\"font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family:\r\nSymbol\">·<span style=\"font-style: normal; font-variant: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;\">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;\r\n</span></span><!--[endif]-->Design,\r\nAccess and Planning Statement (Humphreys &amp; Sons, June 2026) <o:p></o:p></p><p class=\"MsoListParagraphCxSpMiddle\" style=\"margin-bottom:8.0pt;mso-add-space:\r\nauto;text-indent:-18.0pt;line-height:115%;mso-list:l1 level1 lfo1\"><!--[if !supportLists]--><span style=\"font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family:\r\nSymbol\">·<span style=\"font-style: normal; font-variant: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;\">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;\r\n</span></span><!--[endif]-->Waste\r\nManagement Plan (Humphreys &amp; Sons, June 2026)<o:p></o:p></p><p class=\"MsoListParagraphCxSpMiddle\" style=\"margin-bottom:8.0pt;mso-add-space:\r\nauto;text-indent:-18.0pt;line-height:115%;mso-list:l1 level1 lfo1\"><!--[if !supportLists]--><span style=\"font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family:\r\nSymbol\">·<span style=\"font-style: normal; font-variant: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;\">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;\r\n</span></span><!--[endif]-->Mechanical\r\nVentilations Strategy (Humphreys &amp; Sons, June 2026)<o:p></o:p></p><p>\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n</p><p class=\"MsoListParagraphCxSpLast\" style=\"margin-bottom:8.0pt;mso-add-space:\r\nauto;text-indent:-18.0pt;line-height:115%;mso-list:l1 level1 lfo1\"><!--[if !supportLists]--><span style=\"font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family:\r\nSymbol\">·<span style=\"font-style: normal; font-variant: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;\">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;\r\n</span></span><!--[endif]-->Email from\r\nplanning agent responding to officer queries (22 September 2026)&nbsp;<o:p></o:p></p><p>No other drawings or documents apply.</p>","Before any new mechanical services plant, including heating, ventilation and air conditioning equipment, is brought into use, a scheme shall be submitted to and approved in writing by the Local Planning Authority demonstrating that the cumulative rating level of noise emitted from the plant shall be at least 5dB below the existing background noise level when assessed in accordance with BS4142:2014 (or any subsequent replacement standard).The approved scheme shall be implemented prior to first use of the plant and shall be retained thereafter.Informative note to applicant: Measurements shall be made at a height of 1.2 - 1.5 metres above the adjacent ground level and at least 3.5 metres from any sound reflecting surfaces other than the ground or 1 metre from the facade of the nearest first floor (or higher) noise sensitive premises, and in accordance with the latest British Standard BS4142:2014, and the measurement value adjusted to remove the additional sound energy contribution from reflected surfaces other than from the ground. An alternative position for assessment /measurement may be used to allow ease of access, this must be shown on a map and noise propagation calculations detailed to show how the design criteria is achieved.)","<p class=\"MsoNormal\" style=\"margin-bottom:8.0pt;line-height:115%\">Prior to the first occupation of the\r\ndevelopment, details of proportionate security and crime prevention measures\r\nrelating to the approved workshop building shall be submitted to and approved\r\nin writing by the Local Planning Authority.<o:p></o:p></p>\r\n\r\n<p class=\"MsoNormal\" style=\"margin-bottom:8.0pt;line-height:115%\">The details shall be prepared in\r\nconsultation with the Metropolitan Police Designing Out Crime Officer and shall\r\ninclude, where appropriate, measures relating to external lighting, doors,\r\nshutters, access control, CCTV, intruder alarms and any other relevant security\r\nfeatures associated with the approved development.<o:p></o:p></p>\r\n\r\n<p class=\"MsoNormal\" style=\"margin-bottom:8.0pt;line-height:115%\">The approved measures shall be implemented\r\nprior to first occupation of the development and retained thereafter.<o:p></o:p></p>"],"id":"Barking_&_Dagenham-26_00783_FULL","application_type":"All Other","pp_id":"15002337","parking_details":null,"url_planning_app":"https://online-befirst.lbbd.gov.uk/planning/index.html?fa=getApplication&id=37935","appeal_status":null,"valid_date":"01/07/2026","site_number":null,"application_details":{"non_residential_details":{"total_gia_gained":658.6,"total_non_resi_gross_internal_floor_area_to_be_gained":658.6,"total_gia_lost":289.8,"total_gia_existing":289.8,"total_non_resi_gross_internal_floor_area_to_be_lost":289.8},"garden_land_lost":false,"ownership_status":"Private","infrastructure_details":{"total_annual_pm_emissions":0,"no_homes_to_have_electrical_heating":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":1,"total_annual_nox_emissions":0,"ghg_reduction_over_building_regulations":false,"mobile_network_operators_consultation":false,"no_new_gas_connections_required":0,"percentage_demolition_construction_material_recycling":0,"waste_provision":true,"no_new_water_connections_required":0,"fire_suppression_system_proposed":true,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0},"total_gia_lost":289.8,"scheme_phasing":true,"existing_proposed_floorspace_details":[{"gia_existing":289.8,"use_class":"B2","gia_gained":658.6,"gia_lost":289.8}],"grey_water_reuse":false,"total_gia_existing":289.8,"total_gia_gained":658.6,"phasing_details":[{"phase_detail":"Phase 1","intended_commencement_date":"09/2026","intended_completion_date":"11/2026"}],"affordable_housing_fast_track":false,"site_area":0.23257000000000003,"projected_cost_of_works":"Up to £2m","rain_water_harvesting":false,"internal_resi_water_usage":0,"surface_water_discharge_percentage_reduction":0,"building_details":[{"no_storeys":2,"max_height":8.6,"building_ref":"new commercial unit"}],"green_suds":false,"constraints_details":[{"result":"HMO Article 4","constraints_layer_description":"Article 4 Directions"},{"result":"60/00190/DAG","constraints_layer_description":"Historic Applications"},{"result":"59/00054/DAG","constraints_layer_description":"Historic Applications"},{"result":"49/00171/DAG","constraints_layer_description":"Historic Applications"},{"result":"02/00725/FUL","constraints_layer_description":"Historic Applications"},{"result":"64/00293/DAG","constraints_layer_description":"Historic Applications"},{"result":"64/00293/DAG1","constraints_layer_description":"Historic Applications"},{"result":"01/00658/ADV","constraints_layer_description":"Historic Applications"},{"result":"02/00088/ADV","constraints_layer_description":"Historic Applications"},{"result":"00/00692/FUL","constraints_layer_description":"Historic Applications"},{"result":"04/00893/FUL","constraints_layer_description":"Historic Applications"},{"result":"78/00438/TP1","constraints_layer_description":"Historic Applications"},{"result":"78/00438/TP","constraints_layer_description":"Historic Applications"},{"result":"12/00174/FUL","constraints_layer_description":"Historic Applications"},{"result":"10/00754/FUL","constraints_layer_description":"Historic Applications"},{"result":"12/00541/FUL","constraints_layer_description":"Historic Applications"},{"result":"78/00053/ADV","constraints_layer_description":"Historic Applications"},{"result":"71/00413/TP","constraints_layer_description":"Historic Applications"},{"result":"58/00202/DAG1","constraints_layer_description":"Historic Applications"},{"result":"58/00202/DAG2","constraints_layer_description":"Historic Applications"},{"result":"71/00038/TP","constraints_layer_description":"Historic Applications"},{"result":"02/00413/FUL","constraints_layer_description":"Historic Applications"},{"result":"60/00133/DAG","constraints_layer_description":"Historic Applications"},{"result":"60/00133/DAGA","constraints_layer_description":"Historic Applications"},{"result":"60/00133/DAG1","constraints_layer_description":"Historic Applications"},{"result":"60/00051/DAG","constraints_layer_description":"Historic Applications"},{"result":"67/00383/TP","constraints_layer_description":"Historic Applications"},{"result":"93/00123/TP","constraints_layer_description":"Historic Applications"},{"result":"69/00451/TP","constraints_layer_description":"Historic Applications"},{"result":"70/00355/TP","constraints_layer_description":"Historic Applications"},{"result":"58/00202/DAG3","constraints_layer_description":"Historic Applications"},{"result":"58/00202/DAGA","constraints_layer_description":"Historic Applications"},{"result":"58/00202/DAG","constraints_layer_description":"Historic Applications"},{"result":"69/00210/TP","constraints_layer_description":"Historic Applications"},{"result":"60/00064/DAG","constraints_layer_description":"Historic Applications"},{"result":"84/00585/TP","constraints_layer_description":"Historic Applications"},{"result":"57/00083/DAG","constraints_layer_description":"Historic Applications"},{"result":"92/00048/TP","constraints_layer_description":"Historic Applications"},{"result":"67/00024/TP8","constraints_layer_description":"Historic Applications"},{"result":"67/00024/TP1","constraints_layer_description":"Historic Applications"},{"result":"67/00024/TP3","constraints_layer_description":"Historic Applications"},{"result":"67/00024/TP4","constraints_layer_description":"Historic Applications"},{"result":"67/00024/TP","constraints_layer_description":"Historic Applications"},{"result":"67/00024/TP2","constraints_layer_description":"Historic Applications"},{"result":"67/00024/TP6","constraints_layer_description":"Historic Applications"},{"result":"67/00024/TP5","constraints_layer_description":"Historic Applications"},{"result":"67/00024/TP7","constraints_layer_description":"Historic Applications"},{"result":"102578","constraints_layer_description":"topoarea"},{"result":"15702","constraints_layer_description":"topoarea"},{"result":"247745","constraints_layer_description":"topoarea"},{"result":"68227","constraints_layer_description":"topoarea"},{"result":"58319","constraints_layer_description":"topoarea"},{"result":"44340","constraints_layer_description":"topoarea"},{"result":"13685","constraints_layer_description":"topoarea"},{"result":"Whalebone","constraints_layer_description":"Ward"},{"result":"64/00293/DAG","constraints_layer_description":"Applications"},{"result":"64/00293/DAG1","constraints_layer_description":"Applications"},{"result":"02/00088/ADV","constraints_layer_description":"Applications"},{"result":"01/00658/ADV","constraints_layer_description":"Applications"},{"result":"00/00692/FUL","constraints_layer_description":"Applications"},{"result":"24/00968/AOD","constraints_layer_description":"Applications"},{"result":"21/02059/FULL","constraints_layer_description":"Applications"},{"result":"04/00893/FUL","constraints_layer_description":"Applications"},{"result":"24/00210/NONMAT","constraints_layer_description":"Applications"},{"result":"22/01424/FULL","constraints_layer_description":"Applications"},{"result":"24/01428/AOD","constraints_layer_description":"Applications"},{"result":"24/01594/AOD","constraints_layer_description":"Applications"},{"result":"24/00155/AOD","constraints_layer_description":"Applications"},{"result":"24/01426/AOD","constraints_layer_description":"Applications"},{"result":"23/01257/AOD","constraints_layer_description":"Applications"},{"result":"23/01771/AOD","constraints_layer_description":"Applications"},{"result":"78/00438/TP","constraints_layer_description":"Applications"},{"result":"24/00942/NONMAT","constraints_layer_description":"Applications"},{"result":"23/01772/AOD","constraints_layer_description":"Applications"},{"result":"23/01285/AOD","constraints_layer_description":"Applications"},{"result":"24/01476/AOD","constraints_layer_description":"Applications"},{"result":"12/00174/FUL","constraints_layer_description":"Applications"},{"result":"78/00438/TP1","constraints_layer_description":"Applications"},{"result":"24/01284/NONMAT","constraints_layer_description":"Applications"},{"result":"23/01334/AOD","constraints_layer_description":"Applications"},{"result":"10/00754/FUL","constraints_layer_description":"Applications"},{"result":"22/01147/SCREEN","constraints_layer_description":"Applications"},{"result":"24/01011/AOD","constraints_layer_description":"Applications"},{"result":"23/00454/AOD","constraints_layer_description":"Applications"},{"result":"23/00456/AOD","constraints_layer_description":"Applications"},{"result":"23/01467/AOD","constraints_layer_description":"Applications"},{"result":"12/00541/FUL","constraints_layer_description":"Applications"},{"result":"67/00024/TP","constraints_layer_description":"Applications"},{"result":"67/00024/TP5","constraints_layer_description":"Applications"},{"result":"67/00024/TP1","constraints_layer_description":"Applications"},{"result":"67/00024/TP2","constraints_layer_description":"Applications"},{"result":"67/00024/TP3","constraints_layer_description":"Applications"},{"result":"67/00024/TP4","constraints_layer_description":"Applications"},{"result":"67/00024/TP6","constraints_layer_description":"Applications"},{"result":"67/00024/TP7","constraints_layer_description":"Applications"},{"result":"67/00024/TP8","constraints_layer_description":"Applications"},{"result":"02/00413/FUL","constraints_layer_description":"Applications"},{"result":"60/00133/DAG1","constraints_layer_description":"Applications"},{"result":"60/00051/DAG","constraints_layer_description":"Applications"},{"result":"60/00133/DAG","constraints_layer_description":"Applications"},{"result":"60/00133/DAGA","constraints_layer_description":"Applications"},{"result":"67/00383/TP","constraints_layer_description":"Applications"},{"result":"93/00123/TP","constraints_layer_description":"Applications"},{"result":"24/01424/AOD","constraints_layer_description":"Applications"},{"result":"24/01729/AOD","constraints_layer_description":"Applications"},{"result":"24/01812/NONMAT","constraints_layer_description":"Applications"},{"result":"24/01427/AOD","constraints_layer_description":"Applications"},{"result":"24/01006/S106","constraints_layer_description":"Applications"},{"result":"25/00677/AOD","constraints_layer_description":"Applications"},{"result":"20/02425/FULL","constraints_layer_description":"Applications"},{"result":"25/00616/FULL","constraints_layer_description":"Applications"},{"result":"92/00048/TP","constraints_layer_description":"Applications"},{"result":"60/00190/DAG","constraints_layer_description":"Applications"},{"result":"59/00054/DAG","constraints_layer_description":"Applications"},{"result":"49/00171/DAG","constraints_layer_description":"Applications"},{"result":"57/00083/DAG","constraints_layer_description":"Applications"},{"result":"84/00585/TP","constraints_layer_description":"Applications"},{"result":"60/00064/DAG","constraints_layer_description":"Applications"},{"result":"02/00725/FUL","constraints_layer_description":"Applications"},{"result":"78/00053/ADV","constraints_layer_description":"Applications"},{"result":"71/00413/TP","constraints_layer_description":"Applications"},{"result":"58/00202/DAG1","constraints_layer_description":"Applications"},{"result":"58/00202/DAG2","constraints_layer_description":"Applications"},{"result":"71/00038/TP","constraints_layer_description":"Applications"},{"result":"69/00451/TP","constraints_layer_description":"Applications"},{"result":"70/00355/TP","constraints_layer_description":"Applications"},{"result":"58/00202/DAG3","constraints_layer_description":"Applications"},{"result":"58/00202/DAGA","constraints_layer_description":"Applications"},{"result":"58/00202/DAG","constraints_layer_description":"Applications"},{"result":"69/00210/TP","constraints_layer_description":"Applications"},{"result":"21/00076/PRE","constraints_layer_description":"Pre-Applications"},{"result":"22/00021/PRE","constraints_layer_description":"Pre-Applications"},{"result":"22/00011/PRE","constraints_layer_description":"Pre-Applications"},{"result":"22/00077/PRE","constraints_layer_description":"Pre-Applications"},{"result":"22/00042/PRE","constraints_layer_description":"Pre-Applications"},{"result":"22/00065/PRE","constraints_layer_description":"Pre-Applications"},{"result":"Hewden Plant Hire Limited, HEWDEN Freshwater Road, Dagenham, Barking And Dagenham, RM8 1RX","constraints_layer_description":"Locations"}]},"site_name":"HEWDEN","decision_process":null,"postcode":"RM8 1RX","last_updated_by":"Portal","centroid":{"lat":51.567126,"lon":0.138512},"polygon":{"crs":{"type":"name","properties":{"name":"EPSG:27700"}},"geometries":[{"coordinates":[[[548311.200891692,187463.799518947],[548309.837619735,187480.253899475],[548308.200891697,187499.999518977],[548305.650891701,187529.149518997],[548301.750891708,187576.449519031],[548301.05089171,187585.149519036],[548305.179214519,187588.384347809],[548309.850891716,187591.549519042],[548314.450891718,187593.949519048],[548318.20089172,187595.549519049],[548318.90089172,187589.349519042],[548319.750480805,187579.508102029],[548322.295063739,187549.99181194],[548325.329540634,187514.346444044],[548327.311891705,187490.722518973],[548328.541668422,187475.726771678],[548329.400891702,187465.249518952],[548311.200891692,187463.799518947]]],"type":"Polygon"}],"type":"geometrycollection"},"appeal_decision":null,"borough":"London Borough of Barking and Dagenham","cil_liability":null,"subdivision_of_building":"Rear commercial workshop","development_type":"Minor general industry-storage-warehousing","reference_no_of_permission_being_relied_on":null}