{"cil_liability":false,"url_planning_app":"https://planning.royalgreenwich.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=_GRNW_DCAPR_125305&activeTab=summary","application_type":"All Other","lpa_app_no":"25/2441/F","bo_system":"CSV Data Import","reference_no_of_permission_being_relied_on":null,"decision_conditions":null,"last_synced":"2026-11-17T02:11:53.234Z","uprn":"10010240424","decision_date":null,"centroid_easting":538359.0,"lapsed_date":null,"valid_date":"02/09/2026","centroid":{"lat":51.483668,"lon":-0.008793},"pp_id":"PP-14205439","subdivision_of_building":"Ground Floor and First Floor","date_building_work_started_under_previous_permission":"01/05/2025","site_name":"BUILDING 2 AT GREENWICH PIER, CUTTY SARK GARDENS, GREENWICH, SE10 9HT","locality":null,"actual_completion_date":null,"date_building_work_completed_under_previous_permission":null,"decision_target_date":"04/12/2026","decision_agency":null,"street_name":null,"application_type_full":"Full planning permission","development_type":null,"appeal_decision_date":null,"secondary_street_name":null,"ward":"GREENWICH PARK","decision":null,"postcode":null,"centroid_northing":177959.0,"appeal_status":null,"site_number":null,"last_date_consultation_comments":"30/09/2026","polygon":null,"decision_process":null,"title_number":null,"appeal_start_date":null,"parking_details":null,"lpa_name":"Greenwich","last_updated_by":"CSV Data Import","application_details":{"grey_water_reuse":false,"total_gia_lost":0,"internal_resi_water_usage":0,"scheme_phasing":true,"rain_water_harvesting":false,"infrastructure_details":{"percentage_demolition_construction_material_recycling":0,"no_new_gas_connections_required":0,"total_annual_pm_emissions":0,"no_non_resi_units_to_have_full_fibre":1,"total_annual_nox_emissions":0,"no_homes_passive_cooling":0,"ghg_reduction_over_building_regulations":false,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":true,"no_homes_to_have_electrical_heating":0,"waste_provision":true},"surface_water_discharge_percentage_reduction":0,"ownership_status":"Private","existing_proposed_floorspace_details":[{"gia_existing":942.4,"use_class":"EB","gia_gained":0,"gia_lost":0}],"non_residential_details":{"total_gia_gained":0,"total_gia_existing":942.4,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0},"projected_cost_of_works":"Between £2m and £100m","affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Refurbishment Works","intended_commencement_date":"04/2025","intended_completion_date":"02/2026"}],"site_area":0.1231,"green_suds":false,"garden_land_lost":false,"total_gia_gained":0,"total_gia_existing":942.4},"borough":"Greenwich","appeal_decision":null,"wgs84_polygon":null,"status":"Application Under Consideration","actual_commencement_date":null,"description":"Formation of outdoor raised seating area, installation of retractable canopies above entrances and outdoor seating area, installation of vertical sliding sash windows across the building, relocation of roof ventilation plants, and installation of CCTV cameras and down lights to the East, West, South and North elevation. (Part retrospective) (This may affect the setting of the surrounding Grade Listed Buildings and Monuments).","id":"Greenwich-25_2441_F","epc_number":null,"last_updated":"2026-11-16T23:03:21.168Z"}