{"postcode":null,"status":"Withdrawn","decision_agency":null,"subdivision_of_building":"The proposal only covers the public footpath.","appeal_start_date":null,"cil_liability":false,"decision_conditions":null,"actual_commencement_date":null,"pp_id":"PP-14537433","decision_target_date":null,"valid_date":"15/12/2025","lpa_app_no":"25/4077/A","locality":null,"appeal_decision_date":null,"parking_details":{"no_existing_other":1,"no_proposed_other":1,"net_other":0},"decision_process":null,"street_name":null,"last_synced":"2026-11-17T02:13:08.311Z","site_number":null,"centroid_easting":542796.0,"polygon":null,"ward":"ELTHAM TOWN & AVERY HILL","centroid_northing":174437.0,"application_type":"All Other","uprn":"100023282308","lapsed_date":null,"actual_completion_date":null,"decision":"Withdrawn","site_name":"Land on the pavement outside 89-95 Eltham High Street, Eltham, London SE9 1TD","borough":"Greenwich","last_date_consultation_comments":"18/02/2026","application_type_full":"Full planning & display of advertisements","url_planning_app":"https://planning.royalgreenwich.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=_GRNW_DCAPR_126944&activeTab=summary","decision_date":"10/02/2026","bo_system":"CSV Data Import","development_type":null,"appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"The installation of one JOLT Unit (Electric Vehicle Charge Point, with integral double-sided LCD screen) and associated electrical connection works (This may affect the setting of 97-101 Etham High Street - Grade II* Listed Building)","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-11-16T23:03:32.480Z","centroid":{"lon":0.053642,"lat":51.450918},"lpa_name":"Greenwich","secondary_street_name":null,"application_details":{"existing_uprns":null,"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"New infrastructure","intended_commencement_date":"03/2026","intended_completion_date":"03/2026"}],"total_gia_gained":0,"site_area":5.4999999999999995E-5,"total_gia_existing":0,"total_gia_lost":0,"scheme_name":"Royal Borough of Greenwich | JOLT joint Electric Vehicle Charging Point (EVCP) programme","projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"building_details":[{"no_storeys":0,"max_height":4,"building_ref":"On-street furniture"}],"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_existing":0,"total_gia_lost":0},"garden_land_lost":false,"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":false,"percentage_demolition_construction_material_recycling":10,"no_homes_to_have_electrical_heating":0,"no_active_other_ev_charging_points":1,"no_passive_other_ev_charging_points":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":true,"waste_details":[{"external_dry_recycling":false,"external_food_waste":false,"unit_reference":"N/A","external_residual_waste":false,"reason_for_no_provision":"Not required as application is for the installation of one JOLT Unit (Electric Vehicle Charge Point, with integral double-sided LCD screen) and associated electrical connection works.","internal_residual_waste":false,"internal_food_waste":false,"internal_dry_recycling":false}]},"uk_company_registration_no":"13633536","ownership_status":"Public","lead_developer_company_name":"JOLT Charge Limited"},"wgs84_polygon":null,"id":"Greenwich-25_4077_A","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"CSV Data Import"}