{"decision":"Approved","last_date_consultation_comments":"18/03/2026","wgs84_polygon":null,"date_building_work_started_under_previous_permission":"04/11/2024","ward":"GREENWICH PENINSULA","site_number":null,"polygon":null,"appeal_status":null,"application_type_full":"Full planning permission","borough":"Greenwich","lpa_name":"Greenwich","postcode":null,"appeal_start_date":null,"appeal_decision_date":null,"status":"Approved","valid_date":"06/02/2026","site_name":"LAND AT MURPHY'S WHARF, LOMBARD WALL, GREENWICH, LONDON SE7 7SH","decision_date":"12/06/2026","pp_id":"PP-14655022","actual_completion_date":null,"url_planning_app":"https://planning.royalgreenwich.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=_GRNW_DCAPR_127586&activeTab=summary","application_details":{"surface_water_discharge_percentage_reduction":100,"site_area":0.42,"existing_uprns":null,"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"garden_land_lost":false,"infrastructure_details":{"fire_suppression_system_proposed":false,"green_roof_area":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"ghg_reduction_over_building_regulations":false,"no_homes_to_have_electrical_heating":0,"no_resi_units_to_have_full_fibre":0,"total_annual_pm_emissions":0,"total_annual_nox_emissions":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_new_gas_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"mobile_network_operators_consultation":false},"internal_resi_water_usage":0,"ownership_status":"Private","non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":0,"total_gia_existing":0},"green_suds":false,"phasing_details":[{"phase_detail":"Entire Development","intended_commencement_date":"11/2024","intended_completion_date":"06/2025"}],"total_gia_gained":0,"total_gia_existing":0,"affordable_housing_fast_track":false,"grey_water_reuse":false,"total_gia_lost":0,"rain_water_harvesting":true},"development_type":null,"centroid_easting":540642.0,"decision_target_date":"12/06/2026","decision_agency":null,"actual_commencement_date":null,"lpa_app_no":"26/0392/F","decision_process":"Delegated","lapsed_date":"12/06/2029","uprn":"10010198346","bo_system":"CSV Data Import","cil_liability":false,"street_name":null,"locality":null,"application_type":"All Other","epc_number":null,"decision_conditions":null,"reference_no_of_permission_being_relied_on":null,"secondary_street_name":null,"centroid_northing":178893.0,"last_updated":"2026-11-16T23:03:37.058Z","centroid":{"lon":0.024436,"lat":51.491498},"subdivision_of_building":"North-eastern corner of site only","last_synced":"2026-11-17T02:13:23.317Z","last_updated_by":"CSV Data Import","title_number":null,"appeal_decision":null,"date_building_work_completed_under_previous_permission":"16/06/2025","id":"Greenwich-26_0392_F","parking_details":null,"description":"Reconfiguration and additions to existing C&D plant and storage areas including erection of unprocessed glass storage area enclosure (enclosed on three sides and covered) and other ancillary plant items, conveyors and structures, to additionally allow for screening and cleaning of glass (as well as continued recycling of C&D waste); Installation of feed ramp, belt feeder and hopper for existing HBM plant; and works associated with provision of sealed drainage system (Retrospective application)."}