{"decision_target_date":"25/09/2026","url_planning_app":"https://planning.royalgreenwich.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=_GRNW_DCAPR_128540&activeTab=summary","centroid":{"lat":51.478237,"lon":0.063971},"decision_date":"25/09/2026","last_synced":"2026-11-17T02:14:08.367Z","wgs84_polygon":{"coordinates":[[[0.063978,51.478241],[0.063977,51.478214],[0.063934,51.478215],[0.063935,51.478242],[0.063978,51.478241]]],"type":"Polygon"},"epc_number":null,"last_date_consultation_comments":"26/06/2026","decision_process":"Delegated","site_number":null,"last_updated":"2026-11-16T23:03:43.905Z","decision":"Approved","actual_commencement_date":null,"appeal_decision_date":null,"status":"Approved","bo_system":"CSV Data Import","cil_liability":false,"development_type":null,"parking_details":null,"application_details":{"affordable_housing_fast_track":false,"building_details":[{"no_storeys":1,"max_height":2.4,"building_ref":"Substation"}],"phasing_details":[{"phase_detail":"Entire Development","intended_commencement_date":"04/2026","intended_completion_date":"04/2027"}],"green_suds":false,"scheme_phasing":true,"site_area":0.002,"total_gia_lost":0,"surface_water_discharge_percentage_reduction":0,"projected_cost_of_works":"Up to £2m","ownership_status":"Public","garden_land_lost":false,"infrastructure_details":{"no_homes_passive_cooling":0,"total_annual_pm_emissions":0,"percentage_demolition_construction_material_recycling":0,"waste_provision":true,"no_resi_units_to_have_full_fibre":0,"urban_greening_factor_score":0,"no_new_water_connections_required":0,"total_annual_nox_emissions":0,"green_roof_area":0,"fire_suppression_system_proposed":false,"no_non_resi_units_to_have_full_fibre":0,"mobile_network_operators_consultation":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false,"no_homes_to_have_electrical_heating":0},"total_gia_existing":0,"total_gia_gained":20,"existing_proposed_floorspace_details":[{"gia_existing":0,"use_class":"SpecifiedOther","gia_gained":20,"gia_lost":0}],"grey_water_reuse":false,"non_residential_details":{"total_gia_gained":20,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_gia_existing":0},"internal_resi_water_usage":0,"rain_water_harvesting":false,"occupation_status":"Occupied"},"pp_id":"PP-14867472","last_updated_by":"CSV Data Import","reference_no_of_permission_being_relied_on":null,"appeal_start_date":null,"lapsed_date":"25/09/2029","postcode":null,"uprn":"100023243889","application_type":"All Other","subdivision_of_building":"In front of the main school building.","ward":"SHOOTERS HILL","borough":"Greenwich","id":"Greenwich-26_1345_F","appeal_decision":null,"street_name":null,"secondary_street_name":null,"lpa_name":"Greenwich","date_building_work_completed_under_previous_permission":null,"title_number":null,"description":"Installation of substation and associated brick wall.","decision_conditions":null,"application_type_full":"Full planning permission","actual_completion_date":null,"locality":null,"centroid_easting":543428.0,"lpa_app_no":"26/1345/F","valid_date":"03/06/2026","polygon":null,"decision_agency":null,"centroid_northing":177495.0,"site_name":"EGLINTON PRIMARY SCHOOL AND EARLY YEARS CENTRE, PAGET RISE, LONDON, SE18 3PY","appeal_status":null,"date_building_work_started_under_previous_permission":null}