{"decision_target_date":null,"url_planning_app":"https://planning.royalgreenwich.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=_GRNW_DCAPR_128848&activeTab=summary","centroid":{"lat":51.485577,"lon":0.03296},"decision_date":"11/08/2026","last_synced":"2026-11-17T02:14:23.384Z","wgs84_polygon":{"coordinates":[[[0.033069,51.485633],[0.032863,51.485577],[0.032779,51.485555],[0.032808,51.485511],[0.032894,51.485534],[0.033,51.485562],[0.033158,51.485605],[0.033199,51.485617],[0.033213,51.48562],[0.033184,51.485663],[0.033069,51.485633]]],"type":"Polygon"},"epc_number":null,"last_date_consultation_comments":"08/07/2026","decision_process":"Delegated","site_number":63,"last_updated":"2026-11-16T23:03:46.182Z","decision":"REFUSED","actual_commencement_date":null,"appeal_decision_date":null,"status":"REFUSED","bo_system":"CSV Data Import","cil_liability":false,"development_type":null,"parking_details":null,"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"construction","intended_commencement_date":"11/2026","intended_completion_date":"12/2026"}],"green_suds":false,"scheme_phasing":true,"site_area":0.016,"total_gia_lost":119.69,"surface_water_discharge_percentage_reduction":0,"projected_cost_of_works":"Up to £2m","ownership_status":"Private","garden_land_lost":false,"infrastructure_details":{"no_homes_passive_cooling":0,"total_annual_pm_emissions":0,"percentage_demolition_construction_material_recycling":0,"waste_provision":true,"no_resi_units_to_have_full_fibre":0,"urban_greening_factor_score":0,"no_new_water_connections_required":0,"total_annual_nox_emissions":0,"green_roof_area":0,"fire_suppression_system_proposed":false,"no_non_resi_units_to_have_full_fibre":0,"mobile_network_operators_consultation":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false,"no_homes_to_have_electrical_heating":0},"total_gia_existing":119.69,"total_gia_gained":167.11,"existing_proposed_floorspace_details":[{"gia_existing":119.69,"use_class":"C3","gia_gained":0,"gia_lost":119.69},{"gia_existing":0,"use_class":"C4","gia_gained":167.11,"gia_lost":0}],"grey_water_reuse":false,"non_residential_details":{"total_gia_gained":167.11,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":119.69,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_gia_existing":119.69},"internal_resi_water_usage":0,"rain_water_harvesting":false,"occupation_status":"Occupied"},"pp_id":"PP-14983657","last_updated_by":"CSV Data Import","reference_no_of_permission_being_relied_on":null,"appeal_start_date":null,"lapsed_date":"11/08/2029","postcode":null,"uprn":"100023279153","application_type":"All Other","subdivision_of_building":null,"ward":"CHARLTON VILLAGE & RIVERSIDE","borough":"Greenwich","id":"Greenwich-26_1653_F","appeal_decision":null,"street_name":null,"secondary_street_name":null,"lpa_name":"Greenwich","date_building_work_completed_under_previous_permission":null,"title_number":null,"description":"Change of use from a single family dwellinghouse (Use Class C3) to a 6-bed, 6-person HMO (Use Class C4), construction of a single storey side and rear wrap around extension, loft conversion and construction of rear dormer, provision of cycle and refuse storage and all other associated alterations.","decision_conditions":null,"application_type_full":"Full planning permission","actual_completion_date":null,"locality":null,"centroid_easting":541252.0,"lpa_app_no":"26/1653/F","valid_date":"16/06/2026","polygon":{"geometries":[{"coordinates":[[[541259.4,178257.4],[541245.3,178250.85],[541239.5,178248.15],[541241.66,178243.4],[541247.55,178246.1],[541254.85,178249.45],[541265.637,178254.508],[541268.5,178255.85],[541269.45,178256.3],[541267.3,178261],[541259.4,178257.4]]],"type":"Polygon"}],"type":"GeometryCollection"},"decision_agency":null,"centroid_northing":178251.0,"site_name":"63 CHARLTON CHURCH LANE, CHARLTON, LONDON, SE7 7AB","appeal_status":null,"date_building_work_started_under_previous_permission":null}