{"polygon":null,"site_number":null,"appeal_decision_date":null,"ward":"ELTHAM TOWN & AVERY HILL","appeal_decision":null,"appeal_start_date":null,"epc_number":null,"borough":"Greenwich","title_number":null,"valid_date":"25/08/2026","status":"Approved","decision_process":"Delegated","secondary_street_name":null,"date_building_work_completed_under_previous_permission":null,"reference_no_of_permission_being_relied_on":null,"last_updated":"2026-11-16T23:03:50.760Z","decision_target_date":"13/11/2026","street_name":null,"postcode":null,"site_name":"O/S 370-380 FOOTSCRAY ROAD, LONDON, SE9 2AA","lpa_app_no":"26/2290/F","development_type":null,"locality":null,"application_type_full":"Full planning & display of advertisements","wgs84_polygon":null,"bo_system":"CSV Data Import","url_planning_app":"https://planning.royalgreenwich.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=_GRNW_DCAPR_129486&activeTab=summary","actual_completion_date":null,"application_type":"All Other","decision":"Approved","decision_date":"12/11/2026","date_building_work_started_under_previous_permission":null,"appeal_status":null,"centroid_easting":543996.0,"lpa_name":"Greenwich","decision_agency":null,"last_updated_by":"CSV Data Import","last_synced":"2026-11-17T02:14:53.408Z","lapsed_date":"12/11/2029","description":"The installation of one JOLT Unit (Electric Vehicle Charge Point, with integral double-sided LCD screen) and associated electrical connection works.","last_date_consultation_comments":"16/09/2026","application_details":{"lead_developer_company_name":"JOLT Charge Limited","infrastructure_details":{"ghg_reduction_over_building_regulations":true,"no_homes_passive_cooling":0,"no_homes_to_have_electrical_heating":0,"no_new_water_connections_required":0,"no_active_other_ev_charging_points":1,"waste_provision":false,"total_annual_pm_emissions":0,"mobile_network_operators_consultation":false,"no_resi_units_to_have_full_fibre":0,"waste_details":[{"external_dry_recycling":false,"external_food_waste":false,"unit_reference":"N/A","external_residual_waste":false,"reason_for_no_provision":"Not required as application is for the installation of one JOLT Unit (Electric Vehicle Charge Point, with integral double-sided LCD screen) and associated electrical connection works.","internal_residual_waste":false,"internal_food_waste":false,"internal_dry_recycling":false}],"green_roof_area":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"no_passive_other_ev_charging_points":0,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"percentage_demolition_construction_material_recycling":10},"total_gia_existing":0,"scheme_name":"Royal Borough of Greenwich | JOLT joint Electric Vehicle Charging Point (EVCP) programme","grey_water_reuse":false,"green_suds":false,"ownership_status":"Public","total_gia_gained":0,"site_area":5.4999999999999995E-5,"projected_cost_of_works":"Up to £2m","rain_water_harvesting":false,"surface_water_discharge_percentage_reduction":0,"phasing_details":[{"phase_detail":"New infrastructure","intended_commencement_date":"10/2026","intended_completion_date":"10/2026"}],"scheme_phasing":true,"building_details":[{"no_storeys":0,"max_height":4,"building_ref":"On-street furniture"}],"total_gia_lost":0,"garden_land_lost":false,"internal_resi_water_usage":0,"affordable_housing_fast_track":false,"non_residential_details":{"total_gia_lost":0,"total_gia_gained":0,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_existing":0}},"pp_id":"PP-15057150","actual_commencement_date":null,"uprn":"10010267402","centroid_northing":173074.0,"subdivision_of_building":"The proposal only covers the public footpath.","centroid":{"lat":51.438367,"lon":0.070346},"parking_details":{"no_existing_other":1,"no_proposed_other":1,"net_other":0},"id":"Greenwich-26_2290_F","cil_liability":false,"decision_conditions":null}