{"last_synced":"2026-11-17T02:15:23.422Z","cil_liability":false,"appeal_status":null,"appeal_start_date":null,"reference_no_of_permission_being_relied_on":null,"ward":"MOTTINGHAM, COLDHARBOUR & NEW ELTHAM","decision_date":null,"lpa_name":"Greenwich","url_planning_app":"https://planning.royalgreenwich.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=_GRNW_DCAPR_130198&activeTab=summary","title_number":null,"lpa_app_no":"26/2998/F","date_building_work_completed_under_previous_permission":null,"last_date_consultation_comments":"18/11/2026","centroid_easting":540878.0,"epc_number":null,"locality":null,"development_type":null,"actual_commencement_date":null,"decision_agency":null,"actual_completion_date":null,"appeal_decision_date":null,"status":"Application Under Consideration","date_building_work_started_under_previous_permission":null,"bo_system":"CSV Data Import","application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire development","intended_commencement_date":"02/2027","intended_completion_date":"02/2027"}],"total_gia_gained":0,"site_area":0.0031,"total_gia_existing":0,"total_gia_lost":0,"scheme_name":"Electric Vehicle Infrastructure Delivery Scheme","projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"surface_water_discharge_percentage_reduction":0,"green_suds":false,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_existing":0,"total_gia_lost":0},"garden_land_lost":false,"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"no_passive_rapid_ev_charging_points":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"urban_greening_factor_score":0,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_active_rapid_ev_charging_points":1,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":false,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"waste_details":[{"external_dry_recycling":false,"external_food_waste":false,"unit_reference":"N/A","external_residual_waste":false,"reason_for_no_provision":"N/A","internal_residual_waste":false,"internal_food_waste":false,"internal_dry_recycling":false}],"ghg_reduction_over_building_regulations":false},"ownership_status":"Public","lead_developer_company_name":"Total Energies"},"wgs84_polygon":{"coordinates":[[[0.067142,51.43386],[0.067141,51.433833],[0.067098,51.433833],[0.067099,51.43386],[0.067142,51.43386]]],"type":"Polygon"},"borough":"Greenwich","centroid":{"lat":51.453456,"lon":0.026149},"description":"Installation of Electric Vehicle Charging Infrastructure comprising one charging terminal on the carriageway along with one 'No Stopping and EV Charging point' sign post on the footpath.","valid_date":"16/10/2026","postcode":null,"application_type_full":"Full planning permission","application_type":"All Other","street_name":null,"centroid_northing":174666.0,"parking_details":{"no_existing_car":1,"net_car":0,"no_proposed_car":1},"pp_id":"PP-15290066","id":"Greenwich-26_2998_F","lapsed_date":null,"decision":null,"decision_conditions":null,"last_updated":"2026-11-16T23:03:55.323Z","site_name":"CARRIAGEWAY ADJACENT TO 748-750 SIDCUP ROAD, LONDON SE9 3NS","decision_process":null,"polygon":null,"subdivision_of_building":"N/A","decision_target_date":null,"last_updated_by":"CSV Data Import","site_number":null,"appeal_decision":null,"uprn":"10010226631","secondary_street_name":null}