{"uprn":"100023547202","wgs84_polygon":{"coordinates":[[[-0.063862,51.560976],[-0.064056,51.561122],[-0.064111,51.561089],[-0.064147,51.560999],[-0.063935,51.560934],[-0.063862,51.560976]]],"type":"Polygon"},"subdivision_of_building":null,"centroid_easting":534298,"application_type":"All Other","status":"Approved","epc_number":null,"cil_liability":true,"parking_details":null,"centroid":{"lat":51.56102,"lon":-0.064005},"description":"Demolition of the existing building at 2 Narford Road and the erection of 2 No. two-storey terraced buildings above basement level providing; 1 No. 5 bedroom house; and 1 No. non-residential institution (Use Class E(f)), and the provision of cycle parking and refuse stores.","application_details":{"other_residential_accommodation_details":{"site_area":242},"site_area":242,"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire development","intended_completion_date":"12/2026","intended_commencement_date":"02/2026"}],"total_gia_gained":196.2,"total_gia_lost":0,"total_gia_existing":111.8,"scheme_name":"Narford Road","existing_proposed_floorspace_details":[{"gia_existing":111.8,"use_class":"EF","gia_gained":196.2,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"building_details":[{"no_storeys":4,"max_height":8.4,"building_ref":"1"}],"grey_water_reuse":false,"green_suds":true,"surface_water_discharge_percentage_reduction":50,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":196.2,"total_gia_existing":111.8,"total_gia_lost":0},"garden_land_lost":false,"residential_details":{"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_bedrooms":5,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_units":1,"total_no_proposed_residential_affordable_units":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_existing_residential_units":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_market_for_rent":0,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_market_for_sale":1,"total_no_existing_residential_affordable_units":0,"total_no_existing_residential_units_affordable_rent":0,"habitable_rooms_density":null,"total_no_existing_residential_units_london_shared_ownership":0,"total_gia_gained":170,"total_no_proposed_residential_units_social_rent":0,"total_no_existing_residential_units_london_affordable_rent":0,"dwelling_density":0,"total_gia_lost":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_starter_homes":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_intermediate":0,"total_no_proposed_residential_units_london_shared_ownership":0,"affordable_percentage":0.0,"residential_units":[{"no_habitable_rooms":7,"provider":"Private","change_type":"Gain","no_bedrooms":5,"unit_type":"Terraced Home","tenure":"Market for sale","gia":170}],"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0},"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":98,"no_resi_units_to_have_full_fibre":1,"solar_pv_capacity":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":1,"no_non_resi_units_to_have_full_fibre":1,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":50,"no_homes_to_have_electrical_heating":1,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"chp_heat_pumps_capacity":0,"ghg_reduction_over_building_regulations":true},"internal_resi_water_usage":100,"ownership_status":"Private","lead_developer_company_name":"Terrence LTD"},"valid_date":"08/10/2025","decision_process":"Delegated","appeal_start_date":null,"application_type_full":"Full planning & demolition in a conservation area","last_updated_by":"Portal","bo_system":"Portal","decision_target_date":"03/12/2025","last_updated":"2026-08-26T07:34:01.144Z","site_name":null,"development_type":"Minor all other minor developments","centroid_northing":186458,"title_number":null,"borough":"Hackney","actual_commencement_date":null,"lpa_app_no":"2025/2160","pp_id":"14372065","appeal_decision_date":null,"lpa_name":"Hackney","decision_agency":"Borough","date_building_work_started_under_previous_permission":null,"decision":"Approved","id":"Hackney-2025_2160","last_date_consultation_comments":"03/11/2025","locality":"HACKNEY","appeal_decision":null,"street_name":"NARFORD ROAD","postcode":"E5 8RD","secondary_street_name":null,"date_building_work_completed_under_previous_permission":null,"url_planning_app":"https://developmentandhousing.hackney.gov.uk//planning/index.html?fa=getApplication&id=83669","appeal_status":null,"decision_date":"07/08/2026","lapsed_date":"07/08/2029","decision_conditions":["&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;The development hereby permitted must be begun not later than the expiration of three years beginning with the date of this permission.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-a99e3d77-7fff-6fdb-3773-94d23d9c98ac&quot;&gt;&lt;br&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: In order to comply with the provisions of the Town and Country Planning Act 1990 (as amended).&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;The Development hereby permitted shall only be carried out and completed strictly in accordance with the submitted plans hereby approved and any subsequent approval of details.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-50c44a12-7fff-87d3-5620-da739aaaa977&quot;&gt;&lt;br&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: To ensure that the development hereby permitted is carried out in full accordance with the plans hereby approved.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Prior to the occupation of the development hereby approved, full details including as built ASHP system (or any other related fixed plant adopted) specification and supporting drawings and installation certificates by a MCS registered contractor must be submitted to and approved in writing by the Local Planning Authority&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;ol style=&quot;margin-top:0;margin-bottom:0;padding-inline-start:48px;&quot;&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type:upper-alpha;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Minimum Heat pump Coefficient of Performance of 3.89&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type:upper-alpha;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Minimum Heat pump Seasonal Coefficient of Performance&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type:upper-alpha;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Details of location of the condenser units from the heat pump systems and any noise solutions to mitigate the impact for nearby sensitive receptors&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;/ol&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-894101e3-7fff-4382-4fcf-47f6fbbd6153&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: In the interest of addressing climate change and supporting net zero development in accordance with policy LP55 of the Hackney Local Plan and Section 14 of the National Planning Policy Framework.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Prior to any above ground works associated with the construction phase of the development, full details, with product specifications and images of samples, of the materials to be used on the external surfaces of the buildings, including glazing and all boundary treatments, shall be submitted to and approved by the Local Planning Authority in writing before any above ground work on the site is commenced. The development shall not be carried out otherwise than in accordance with the details thus approved.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-e1449bdb-7fff-c965-72cb-e9d9960f392d&quot;&gt;&lt;br&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: To ensure that the external appearance of the building is satisfactory and does not detract from the character and visual amenity of the surrounding area and significance of the Northwold and Cazenove Conservation Area. These details are required prior to commencement of any above ground works as they are integral to the fabric of the development and cannot, therefore, be dealt with retrospectively.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Detailed drawings/full particulars of the proposed development showing the matters set out below must be submitted to and approved by the Local Planning Authority, in writing, before work on the relevant part of the development commences. The development shall not be carried out otherwise than in accordance with the details thus approved.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;b style=&quot;font-weight:normal;&quot; id=&quot;docs-internal-guid-ebf69ee5-7fff-e642-ca6b-a80da4581115&quot;&gt;&lt;br&gt;&lt;/b&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;margin-left: 36pt;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;1) Typical window and door details including sections at 1:20;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;margin-left: 36pt;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;2) 1:20 drawings of all boundary treatments;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;margin-left: 36pt;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;3) Location of Air Source Heat Pump and associated screening&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: To ensure a satisfactory external appearance and safeguard the significance of the Northwold and Cazenove Conservation Area.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;A Final Construction Management Plan (CMP) specifying hours of working, construction traffic routing, measures to prevent dust pollution and contact arrangements between residents and contractors shall be submitted and agreed by the Local Planning Authority prior to the commencement of the development. The CMP shall include the following details:&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;b style=&quot;font-weight:normal;&quot; id=&quot;docs-internal-guid-596cad90-7fff-2e80-b2cf-799ef520dbd7&quot;&gt;&lt;br&gt;&lt;/b&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-indent: 36pt;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;(a) loading and unloading of plant and materials;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-indent: 36pt;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;(b) storage of plant and materials;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-indent: 36pt;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;(c) programme of works (including measures for traffic management);&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-indent: 36pt;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;(d) provision of boundary hoarding behind any visibility zones;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;margin-left: 36pt;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;(e) wheel cleaning provision on site. Construction shall thereafter take place in accordance with the measures identified within the CMP.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: To ensure that during demolition and construction works that there would be no negative amenity or highway impacts as a result of the development. These details are required prior to commencement as they affect the entirety of the construction phase and cannot, therefore, be dealt with retrospectively.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;No non-road mobile machinery (NRMM) shall be used on the site unless it is compliant with the NRMM Low Emission Zone requirements (or any superseding requirements) and until it has been registered for use on the site on the NRMM register (or any superseding register).&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-f8e7c727-7fff-5b00-fcf3-ea25e8c4b8b1&quot;&gt;&lt;br&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: To ensure that air quality is not adversely affected by the development in line with Policy SI 1 of the London Plan (2021) and the Mayor&#x27;s The Control of Dust and Emissions During Construction and Demolition SPG (2014).&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Prior to the commencement of the relevant part of the work, the applicant shall submit, and have approved in writing by the Local Planning Authority, a detailed layout, cross sections (scale 1:20), full specifications and a detailed management and maintenance plan of the biodiverse roof with a minimum substrate depth of 80mm, not including the vegetative mat. The development shall not be carried out otherwise than in accordance with the details thus approved and shall be fully implemented before the premises are first occupied.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-3de9e4d4-7fff-8e92-d11b-246a503f209a&quot;&gt;&lt;br&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: &lt;/span&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:#ffffff;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;To promote biodiversity on site in line with policy LP46 of the Hackney Local Plan 2033 (2020) and minimise the risk of flooding.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;No development shall commence, other than works of demolition, until a report (including intrusive investigation/trial pit and monitoring where necessary) demonstrating that the basement development and lightwell will not increase the potential for groundwater flooding to itself or to the surrounding area has been submitted to the Local Planning Authority for approval. Details of appropriate controls including flood resilience and/or resistance measures against surface water (overland flow) and groundwater (if identified) shall be submitted to the LPA for approval and the approved measures incorporated before the basement is occupied. The basement shall be constructed and completed in accordance with the approved plans in line with BS 8102:2022 Protection of below ground structures against water ingress - code of practice.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-3808554d-7fff-e89b-3584-3bbf848bc385&quot;&gt;&lt;br&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: To minimise the risk of flooding.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;The noise level from all plant and machinery included in the approved development shall at all times remain 10dB(A) below background levels when measured at any nearby residential window.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-7eea4fc4-7fff-1b3d-3557-fb7e337e88c9&quot;&gt;&lt;br&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: To ensure that occupiers of neighbouring premises do not suffer a loss of amenity by reason of noise nuisance and other excess noise.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Prior to the first occupation of the development hereby approved, notwithstanding the details as shown on the approved drawings, precise details of the proposed cycle parking provision which is safe, secure and accessible for all shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in strict accordance with the approved details and thereafter retained solely for its designated use.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;margin-left: 35.43307086614173pt;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-c6a2cb61-7fff-5d2f-7a86-6bcf3a4bd409&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: To ensure adequate provision for the safe and secure storage of bicycles, to promote sustainable modes of transport and in the interest of safeguarding highway safety in accordance with Policy LP42 of the Hackney Local Plan 2033 (2020).&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Prior to the first occupation of the development hereby approved, notwithstanding the details as shown on the approved drawings, precise details of the proposed refuse and recycling storage capacity shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in strict accordance with the approved details and the area shall remain free from obstruction other than for its approved use.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;margin-left: 36pt;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-925b2bf0-7fff-185d-0a46-f63ab970dc89&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: To ensure adequate provision for refuse and recycling is provided which would safeguard the amenity of the area and not compromise pedestrian safety.&lt;/span&gt;&lt;/p&gt;","&lt;div style=&quot;color: rgb(34, 34, 34); font-family: Arial, Helvetica, sans-serif; font-size: small;&quot;&gt;The &lt;span class=&quot;il&quot;&gt;flat&lt;/span&gt; &lt;span class=&quot;il&quot;&gt;roof&lt;/span&gt; surfaces of the development hereby approved shall not be used as a terrace, balcony or similar amenity area.&lt;/div&gt;&lt;div style=&quot;color: rgb(34, 34, 34); font-family: Arial, Helvetica, sans-serif; font-size: small;&quot;&gt;&lt;br&gt;&lt;/div&gt;&lt;div style=&quot;color: rgb(34, 34, 34); font-family: Arial, Helvetica, sans-serif; font-size: small;&quot;&gt;REASON: In the interests of neighbours&#x27; amenity.&lt;/div&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Prior to the occupation of the development hereby approved, full details and installation certificates by a MCS registered contractor must be submitted to and approved by the Local Authority to demonstrate at least the consented standards have been met, as set out in the hereby approved Energy Statement&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;ol style=&quot;margin-top:0;margin-bottom:0;padding-inline-start:48px;&quot;&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type:upper-alpha;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Solar PV panels annual electricity peak generation of 4.64 kWp&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type:upper-alpha;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Solar PV panels array&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type:upper-alpha;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Battery storage capacity&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type:upper-alpha;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Installation certificate by MCS register installer&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type:upper-alpha;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;As built roof plan (1:50) showing PV array, maintenance and access paths, other plants and services, landscaping including fire breaks where applicable&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type:upper-alpha;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Final Operation &amp;amp; Maintenance manual including fire risk assessment where applicable&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;/ol&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;For completeness, a summary statement highlighting changes supported by detailed justification and assessing their impact between the approved and the revised strategies where applicable should be provided.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Where compliance is not met, a remedial plan and associated cost plan must be prepared and submitted to the Local Authority for approval detailing the necessary measures to meet or improve upon the ‘as designed’ performance. Shortfalls may attract an additional financial contribution to the carbon offset fund.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;The development hereby approved shall not be carried out otherwise than in accordance with the details thereby approved.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-4254f461-7fff-9ad5-113b-6184c5caac4f&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: In the interest of addressing climate change and supporting net zero development in accordance with policy LP55 of the Hackney Local Plan and Section 14 of the National Planning Policy Framework.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Prior to the occupation of the development hereby approved, full details including as built ventilation system (or any other related fixed plant adopted) specification and supporting drawings and installation certificates by a MCS registered contractor must be submitted to and approved in writing by the Local Planning Authority confirming the ventilation system has achieved or improved upon the hereby approved Energy Statement&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;ol style=&quot;margin-top:0;margin-bottom:0;padding-inline-start:48px;&quot;&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type:upper-alpha;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;margin-left: 11pt;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Minimum MVRH efficiency of 70% for non residential units unless otherwise agreed in writing with the Local Planning Authority&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type:upper-alpha;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;margin-left: 11pt;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Details of summer by pass where applicable including provision and location across the development&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;/ol&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;For completeness, a summary statement highlighting changes supported by detailed justification and assessing their impact between the approved and the revised figures where applicable should be provided.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;The development hereby approved shall not be carried out otherwise than in accordance with the details thereby approved.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Where compliance is not met, a remedial plan and associated cost plan must be prepared and submitted to the Local Authority for approval detailing the necessary measures to meet the required level of performance. Shortfalls may attract an additional financial contribution to the carbon offset fund.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: In the interest of addressing climate change and supporting net zero development in accordance with LP55 of the Hackney Local Plan and Section 14 of the National Planning Policy Framework.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;The applicant is required to ensure that in managing any waste arising from construction processes, including demolition and groundworks and above ground works, that the following targets are met:&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;ol style=&quot;margin-top:0;margin-bottom:0;padding-inline-start:48px;&quot;&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type:upper-alpha;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Municipal waste recycling rate of 65%&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type:upper-alpha;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Business waste recycling rate of 75%&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type:upper-alpha;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Minimum of 95% demolition or site waste diverted from landfill for reuse, recycling or recovery&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type:upper-alpha;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Minimum of 95% of excavation waste diverted from landfill for beneficial use&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type:upper-alpha;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Minimum of 20% of the new building material elements are comprised of recycled or reused content&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;/ol&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;For completeness, a summary statement highlighting changes supported by detailed justification and assessing their impact between the approved and the revised strategies where applicable should be provided.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;The development hereby approved shall not be carried out otherwise than in accordance with the details thereby approved.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-173a471e-7fff-aabf-a7d2-456bd852e2d1&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: In the interest of addressing climate change and supporting net zero development in accordance with LP55 of the Hackney Local Plan and Section 14 of the National Planning Policy Framework.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Prior to the first occupation of the development hereby approved, the applicant shall provide a statement to confirm that the development has been designed to be water efficient and reduce water&amp;nbsp; consumption as far as possible, demonstrating that the development will not exceed a maximum water use of 105 litres of water per person per day, with an additional maximum water use allowance for external water consumption of 5 litres.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-631856d2-7fff-debb-ee9f-15b26bed5ae1&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: Addressing the need to conserve water, to mitigate and adapt to climate change, taking into account the full range of potential climate change impacts in accordance with the London Plan (2021), Hackney Local Plan (2020) and the National Planning Policy Framework (2024).&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;The development hereby approved shall provide two swift boxes close to the eaves prior to first occupation and shall be retained as such in perpetuity.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;margin-left: 36pt;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-b9e92bb2-7fff-360f-bc75-51800ca59d20&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: &lt;/span&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:#ffffff;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;To promote biodiversity on site in line with policy LP46 of the Hackney Local Plan 2033 (2020).&lt;/span&gt;&lt;/p&gt;","&lt;div&gt;Notwithstanding the provisions set out in Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) or the Town and Country Planning (Use Classes) Order 1987 (as amended), or in any provision equivalent to those Orders in any statutory instrument revoking and re-enacting that Order, the non-residential premises hereby permitted shall be used solely for a use falling within Use Class E(f) and for no other purpose whatsoever (including any other purpose within Class E or Class F1 of the Use Classes Order).&lt;/div&gt;&lt;div&gt;&lt;br&gt;&lt;/div&gt;&lt;div&gt;REASON: To enable the Local Planning Authority to ensure the use of the site is appropriately managed, protecting the provision of community and social infrastructure within the borough, and safeguarding neighbouring amenity.&lt;/div&gt;&lt;div&gt;&lt;br style=&quot;color: rgb(34, 34, 34); font-family: Arial, Helvetica, sans-serif; font-size: small;&quot;&gt;&lt;/div&gt;"],"polygon":{"geometries":[{"coordinates":[[[534308.048251778,186453.346663005],[534294.186949418,186469.231121175],[534290.487098076,186465.498089729],[534288.200687354,186455.343579974],[534303.145297474,186448.534419663],[534308.048251778,186453.346663005]]],"type":"Polygon"},{"coordinates":[[[534308.048251778,186453.346663005],[534294.186949418,186469.231121175],[534290.487098076,186465.498089729],[534288.200687354,186455.343579974],[534303.145297474,186448.534419663],[534308.048251778,186453.346663005]]],"type":"Polygon"}],"type":"geometrycollection","crs":{"type":"name","properties":{"name":"EPSG:27700"}}},"site_number":"2","ward":"Hackney Downs Ward","reference_no_of_permission_being_relied_on":null,"actual_completion_date":null,"last_synced":"2026-08-27T02:05:50.894Z"}