{"borough":"Hackney","application_type":"All Other","decision":"Approved","decision_conditions":["&lt;p&gt;All new external facing and roofing materials in respect of all the works hereby approved (and any other incidental works carried out in this connection) shall match those of the existing building in respect of materials used.&lt;/p&gt;&lt;p&gt;\r\n\r\nREASON: To preserve the character and appearance of the existing building.&amp;nbsp;&lt;/p&gt;","<p>The development hereby permitted must be begun not later than the expiration of three years beginning with the date of this permission.</p><p><br></p><p>\r\n</p><p>\r\nREASON: In order to comply with the provisions of the Town and Country Planning Act 1990 (as amended).</p><p>\r\n</p>","&lt;p&gt;Prior to the completion of the development hereby approved a minimum of two Swift nesting bricks and/or boxes shall be provided at or close to eaves level of the development hereby approved. The bricks/boxes shall be retained thereafter in perpetuity. &lt;/p&gt;&lt;p&gt;REASON: In the interests of biodiversity&lt;/p&gt;","<p>The Development hereby permitted shall only be carried out and completed strictly in accordance with the submitted plans hereby approved and any subsequent approval of details.\r\n</p><p><br></p><p>\r\nREASON: To ensure that the development hereby permitted is carried out in full accordance with the plans hereby approved.\r\n</p>","&lt;p&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Prior to the commencement of any demolition or construction works hereby approved, a detailed Demolition and Construction Management Plan covering the matters set out below shall be submitted to and approved in writing by the Local Planning Authority. The development shall only be implemented in accordance with the details and measures approved as part of the demolition and construction management plan, which shall be maintained throughout the entire construction period&lt;/span&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;A demolition and construction method statement covering all phases of the development to include details of noise control measures and measures to preserve air quality (including a risk assessment of the demolition and construction phase);&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;A demolition and construction waste management plan setting out how resources will be managed and waste controlled at all stages during a construction project, including, but not limited to, details of dust mitigation measures during construction works, the location of any mobile plant machinery, details of measures to be employed to mitigate against noise and vibration arising out of the construction process demonstrating best practical means;&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;A demolition and construction traffic management plan to include the following: the construction programme/timescales; the number/frequency and size of construction vehicles; construction traffic route and trip generation; location of deliveries; pedestrian and vehicular access arrangements; any temporary road/footway closures during the construction period; details of parking suspensions (if required) and the duration of construction;&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;A dust management plan to include details of how dust from construction activity will be controlled / mitigated against following best practice guidance. This should include monitoring of particulate matter at the application site boundary in the direction of sensitive receptors following the SPG Mayor of London Control of Dust and Emissions Guidance;&lt;/span&gt;&lt;/li&gt;&lt;li&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;The operation of the site equipment generating noise and other nuisance causing activities, audible at the site boundaries or in nearby residential properties shall only be carried out between the hours of 08:00 – 18:00 Mondays-Fridays, 08:00-13:00 Saturdays and at no time on Sundays or Bank Holidays unless otherwise agreed in writing by the Local Planning Authority&lt;/span&gt;&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;This should be in line with TfL CLP guidance:&lt;/span&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;a href=&quot;http://content.tfl.gov.uk/construction-logistics-plan-guidance.pdf&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;http://content.tfl.gov.uk/construction-logistics-plan-guidance.pdf&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;REASON: In the interests of highway and public safety, protect air quality and safeguard the amenity of the area.&lt;/span&gt;&lt;/p&gt;"],"last_synced":"2026-07-17T02:15:16.503Z","centroid_northing":187909,"url_planning_app":"https://developmentandhousing.hackney.gov.uk//planning/index.html?fa=getApplication&id=83899","lpa_app_no":"2025/2437","site_number":149,"ward":"Springfield Ward","locality":"London","last_date_consultation_comments":"08/01/2026","date_building_work_started_under_previous_permission":null,"description":"Addition of 1 floor, in addition to the already permitted floor under application 2024/1905, to allow for a dedicated children’s area, a library and a kiddush hall for use during synagogue prayers times, and moving the existing offices to the new top floor ","parking_details":null,"postcode":"N16 5LL","appeal_status":null,"cil_liability":null,"date_building_work_completed_under_previous_permission":null,"pp_id":"14344088","status":"Approved","last_updated_by":"PP overwrite repair","polygon":{"crs":{"type":"name","properties":{"name":"EPSG:27700"}},"type":"GeometryCollection","geometries":[{"coordinates":[[[533580.9,187903.85],[533585.9,187903.05],[533587.25,187911.45],[533572.9,187913.8],[533571.55,187905.45],[533573,187905.2],[533577.6,187904.45],[533577.85,187906.25],[533581.2,187905.7],[533580.9,187903.85]]],"type":"Polygon"}]},"wgs84_polygon":{"coordinates":[[[-0.073795,51.574183],[-0.073723,51.574175],[-0.0737,51.57425],[-0.073906,51.574274],[-0.073929,51.5742],[-0.073908,51.574197],[-0.073842,51.574189],[-0.073838,51.574205],[-0.07379,51.5742],[-0.073795,51.574183]]],"type":"Polygon"},"appeal_decision_date":null,"secondary_street_name":null,"lapsed_date":"09/01/2029","bo_system":"Portal","decision_date":"09/01/2026","centroid_easting":533580,"actual_commencement_date":null,"id":"Hackney-2025_2437","lpa_name":"Hackney","decision_target_date":"31/12/2025","valid_date":"05/11/2025","development_type":"Minor all other minor developments","last_updated":"2026-07-16T20:31:25.038Z","subdivision_of_building":null,"reference_no_of_permission_being_relied_on":null,"centroid":{"lat":51.57423,"lon":-0.073806},"decision_process":"Delegated","application_type_full":"Full planning permission","decision_agency":"Borough","street_name":"Stamford Hill","appeal_decision":null,"title_number":null,"site_name":"Medcar House","appeal_start_date":null,"application_details":{"other_residential_accommodation_details":{"site_area":250},"site_area":0.025,"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"1","intended_completion_date":"12/2026","intended_commencement_date":"02/2026"}],"total_gia_gained":300,"total_gia_existing":260,"total_gia_lost":0,"existing_proposed_floorspace_details":[{"gia_existing":260,"use_class":"SpecifiedOther","gia_gained":300,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"building_details":[{"no_storeys":3,"max_height":8.5,"building_ref":"1"}],"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":300,"total_gia_existing":260,"total_gia_lost":0},"garden_land_lost":false,"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false,"urban_greening_factor_score":0},"ownership_status":"Private","occupation_status":"Occupied"},"epc_number":null,"uprn":100023156646,"actual_completion_date":null}