{"decision_target_date":"05/01/2026","last_updated_by":"Portal","appeal_decision_date":null,"appeal_status":null,"development_type":"New Build","postcode":"N1 6TA","title_number":null,"application_details":{},"decision_date":"06/05/2026","url_planning_app":"https://developmentandhousing.hackney.gov.uk//planning/index.html?fa=getApplication&id=83923","borough":"Hackney","locality":"HACKNEY","date_building_work_started_under_previous_permission":null,"bo_system":"Portal","parking_details":null,"site_name":null,"epc_number":null,"pp_id":null,"subdivision_of_building":null,"status":"Approved","description":"Prior approval under Class MA of Part 3, Schedule 2 of the GPDO for the change of use of the existing building from Class E (commercial) to class C3 (dwelling houses) to provide 22 x self contained residential units.&nbsp;","decision_conditions":["&lt;p dir=&quot;ltr&quot; style=&quot;text-align: justify; line-height: 1.295; margin-top: 0pt; margin-bottom: 8pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;No development shall take place until a detailed Demolition and Construction Management Plan covering the matters set out below has been submitted to and approved in writing by the Local Planning Authority. The development shall only be implemented in accordance with the details and measures approved as part of the demolition and construction management plan, which shall be maintained throughout the entire construction period.&lt;/span&gt;&lt;/p&gt;&lt;ul style=&quot;margin-top:0;margin-bottom:0;padding-inline-start:48px;&quot;&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type:disc;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;text-align: justify; line-height: 1.295; margin-top: 0pt; margin-bottom: 0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;A demolition and construction method statement covering all phases of the development to include details of noise control measures and measures to preserve air quality (including a risk assessment of the demolition and construction phase);&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type:disc;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;text-align: justify; line-height: 1.295; margin-top: 0pt; margin-bottom: 0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;A demolition and construction waste management plan setting out how resources will be managed and waste controlled at all stages during a construction project, including, but not limited to, details of dust mitigation measures during construction works, the location of any mobile plant machinery, details of measures to be employed to mitigate against noise and vibration arising out of the construction process demonstrating best practical means;&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type:disc;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;text-align: justify; line-height: 1.295; margin-top: 0pt; margin-bottom: 0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;A demolition and construction traffic management plan to include the following: the construction programme/timescales; the number/frequency and size of construction vehicles; construction traffic route and trip generation; location of deliveries; pedestrian and vehicular access arrangements; any temporary road/footway closures during the construction period; details of parking suspensions (if required) and the duration of construction;&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type:disc;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;text-align: justify; line-height: 1.295; margin-top: 0pt; margin-bottom: 8pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;A dust management plan to include details of how dust from construction activity will be controlled / mitigated against following best practice guidance. This should include monitoring of particulate matter at the application site boundary in the direction of sensitive receptors following the SPG Mayor of London Control of Dust and Emissions Guidance.&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-846fcb37-7fff-925c-4a3b-3f364b449581&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;text-align: justify; line-height: 1.295; margin-top: 0pt; margin-bottom: 8pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: To avoid hazard and obstruction being caused to users of the public highway and in the interest of public safety and amenity. To protect air quality and people’s health by ensuring that the production of air pollutants, such as nitrogen dioxide and particulate matter, are kept to a minimum during the course of building works.&lt;/span&gt;&lt;/p&gt;","<p>The Development hereby permitted shall only be carried out and completed strictly in accordance with the submitted plans hereby approved and any subsequent approval of details.\r\n</p><p><br></p><p>\r\nREASON: To ensure that the development hereby permitted is carried out in full accordance with the plans hereby approved.\r\n</p>","<p>The development hereby permitted must be begun not later than the expiration of three years beginning with the date of this permission.</p><p><br></p><p>\r\n</p><p>\r\nREASON: In order to comply with the provisions of the Town and Country Planning Act 1990 (as amended).</p><p>\r\n</p>","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:12pt;margin-bottom:12pt;&quot;&gt;&lt;span style=&quot;font-size: 14px; font-family: Arial, sans-serif; color: rgb(0, 0, 0); background-color: transparent; font-weight: 400; font-style: normal; font-variant: normal; text-decoration: none; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;The dwelling(s) shall not be occupied until the external works approved under planning permission Ref. 2025/1427, which are required to safeguard the natural light to the habitable rooms, have been fully completed in accordance with the approved plans for that permission.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-95a49eee-7fff-1dc3-f17e-368709eb3dcc&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:12pt;margin-bottom:12pt;&quot;&gt;&lt;span style=&quot;font-size: 14px; font-family: Arial, sans-serif; color: rgb(0, 0, 0); background-color: transparent; font-weight: 400; font-style: normal; font-variant: normal; text-decoration: none; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;REASON: To ensure that an acceptable standard of residential amenity is provided for the future occupiers of the development, specifically in respect of natural light to habitable rooms, in accordance with Policy MA.2(f) of the Hackney Local Plan 2033 (or the relevant policy at the time of the decision).&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:12pt;margin-bottom:12pt;&quot;&gt;&lt;span style=&quot;font-size: 14px; font-family: Arial, sans-serif; color: rgb(0, 0, 0); background-color: transparent; font-weight: 400; font-style: normal; font-variant: normal; text-decoration: none; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;All residential premises shall be designed in accordance with BS 8233:2014 &#x27;Guidance on sound insulation and noise reduction for buildings’ to attain the following noise levels: Resting (Living room) 35 dB LAeq, 16hrs (Day), Dining (Dining room/area) 40 dB LAeq, 16hrs (Day), and Sleeping (Bedroom) 35 dB LAeq, 16hrs (Day) / 30 dB LAeq, 8hrs (Night). A test shall be carried out prior to the discharge of this condition to show that the required noise levels have been met and the results submitted to the Local Planning Authority for approval.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-9e665a24-7fff-403e-a1d6-cc3076ff81ab&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:12pt;margin-bottom:12pt;&quot;&gt;&lt;span style=&quot;font-size: 14px; font-family: Arial, sans-serif; color: rgb(0, 0, 0); background-color: transparent; font-weight: 400; font-style: normal; font-variant: normal; text-decoration: none; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;REASON: To obtain required sound insulation and prevent noise nuisance.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:12pt;margin-bottom:12pt;&quot;&gt;&lt;span style=&quot;font-size: 14px; font-family: Arial, sans-serif; color: rgb(0, 0, 0); background-color: transparent; font-weight: 400; font-style: normal; font-variant: normal; text-decoration: none; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;Prior to commencement of the development, a scheme of sound insulation measures shall be submitted to and approved in writing by the Council, of an enhanced sound insulation value Dnt,w [and L’nt,w] of at least 5dB above the standards of Building Regulations Approved Document E ‘Resistance to the passage of sound’ for the floor/ceiling/wall structures separating different types of rooms/uses in adjoining dwellings, namely [e.g. living room and kitchen above bedroom of separate dwelling]. Approved details shall be implemented prior to occupation of the development and thereafter be permanently retained.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-c56a8ec6-7fff-7b5a-ec47-b88eb9d89d35&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:12pt;margin-bottom:12pt;&quot;&gt;&lt;span style=&quot;font-size: 14px; font-family: Arial, sans-serif; color: rgb(0, 0, 0); background-color: transparent; font-weight: 400; font-style: normal; font-variant: normal; text-decoration: none; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;REASON: To ensure that the amenity of occupiers of the development site is not adversely affected by noise.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:12pt;margin-bottom:12pt;&quot;&gt;&lt;span style=&quot;font-size: 14px; font-family: Arial, sans-serif; color: rgb(0, 0, 0); background-color: transparent; font-weight: 400; font-style: normal; font-variant: normal; text-decoration: none; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;Section 7.7.3.4 of BS8233:2014 specifies the maximum recommended noise levels within living accommodations resulting from lift operation. The levels provided in that standard should not be exceeded at any point during the lift cycle. The lift motor and associated equipment should be installed on suitable anti-vibration mountings to prevent the transmission of excessive vibration and/or structure-borne noise to any parts of the living accommodation.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-1842a2ca-7fff-bc1d-72ed-c5cf25e25839&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:12pt;margin-bottom:12pt;&quot;&gt;&lt;span style=&quot;font-size: 14px; font-family: Arial, sans-serif; color: rgb(0, 0, 0); background-color: transparent; font-weight: 400; font-style: normal; font-variant: normal; text-decoration: none; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;REASON: To ensure that the amenity of occupiers of the development site is not adversely affected by noise.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:12pt;margin-bottom:12pt;&quot;&gt;&lt;span style=&quot;font-size: 14px; font-family: Arial, sans-serif; color: rgb(0, 0, 0); background-color: transparent; font-weight: 400; font-style: normal; font-variant: normal; text-decoration: none; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;Sound insulation shall be installed between the Office premises on the lower ground floor and residential premises on the ground floor. The applicant shall provide a scheme of sound insulation that shall be submitted for approval to the Council’s Noise Section prior to the commenced use of these residential units.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-a5faec49-7fff-fea1-7997-86553b87d9b3&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:12pt;margin-bottom:12pt;&quot;&gt;&lt;span style=&quot;font-size: 14px; font-family: Arial, sans-serif; color: rgb(0, 0, 0); background-color: transparent; font-weight: 400; font-style: normal; font-variant: normal; text-decoration: none; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;REASON: To obtain required sound insulation and prevent noise nuisance.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:12pt;margin-bottom:12pt;&quot;&gt;&lt;span style=&quot;font-size: 14px; font-family: Arial, sans-serif; color: rgb(0, 0, 0); background-color: transparent; font-weight: 400; font-style: normal; font-variant: normal; text-decoration: none; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;Any new plant shall be installed, together with any associated ancillary equipment, so as to prevent the transmission of noise and vibration into neighbouring premises. The rated noise level from all plant and ancillary equipment shall not increase the existing background noise level (10dB below) when measured 1m external from the nearest residential or noise sensitive premises. An assessment of the expected noise levels shall be carried out by a suitably qualified (IOA accredited) and experienced acoustic consultant, in accordance with BS 4142:2014+A1:2019, and any mitigation measures necessary to achieve the above required noise levels shall be submitted to the Local Planning Authority in writing for approval. The plant shall thereafter be installed and maintained in accordance with the approved details.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-16811fea-7fff-404f-daca-afed61f1ba5d&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.38;text-align: justify;margin-top:12pt;margin-bottom:12pt;&quot;&gt;&lt;span style=&quot;font-size: 14px; font-family: Arial, sans-serif; color: rgb(0, 0, 0); background-color: transparent; font-weight: 400; font-style: normal; font-variant: normal; text-decoration: none; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;REASON: To protect acceptable local noise levels.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;text-align: justify; line-height: 1.295; margin-top: 0pt; margin-bottom: 8pt;&quot;&gt;&lt;span style=&quot;font-size: 14px; font-family: Arial, sans-serif; color: rgb(0, 0, 0); background-color: transparent; font-weight: 400; font-style: normal; font-variant: normal; text-decoration: none; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;Prior to the commencement of the relevant works, a policy compliant cycle parking plan,, which shows details of layout, foundation, stand type and spacing, of cycle parking spaces, shall submitted to and approved in writing by the Local Planning Authority&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-c4a17f2f-7fff-3f7e-30f0-a0142f2d6455&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;text-align: justify; line-height: 1.295; margin-top: 0pt; margin-bottom: 8pt;&quot;&gt;&lt;span style=&quot;font-size: 14px; font-family: Arial, sans-serif; color: rgb(0, 0, 0); background-color: transparent; font-weight: 400; font-style: normal; font-variant: normal; text-decoration: none; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;REASON: To ensure that adequate provision for the safe and secure storage of bicycles is made for future occupiers and in the interest of safeguarding highway safety.&lt;/span&gt;&lt;/p&gt;"],"site_number":"151 - 155","last_updated":"2026-05-12T08:37:28.140Z","last_date_consultation_comments":"06/12/2025","valid_date":"10/11/2025","actual_commencement_date":null,"centroid_northing":183374,"appeal_decision":null,"decision_agency":"Borough","lpa_app_no":"2025/2459","date_building_work_completed_under_previous_permission":null,"decision":"Approved","id":"Hackney-2025_2459","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[532697.300361159,183364.005676158],[532707.647912278,183369.204188197],[532709.849343635,183370.303873393],[532708.901162095,183372.153344254],[532707.252149629,183375.602356926],[532704.003595406,183382.300439305],[532701.802163972,183381.200753972],[532701.44762643,183381.950539817],[532698.553610274,183382.450396431],[532685.204856366,183375.902270859],[532678.402680892,183372.503243565],[532677.701850349,183372.153344164],[532675.401478353,183371.053658747],[532674.403826278,183370.603787464],[532679.103510995,183361.40642015],[532681.55229406,183356.357865497],[532687.950461738,183359.406992582],[532697.300361159,183364.005676158]]],"type":"Polygon"},{"coordinates":[[[532697.300361159,183364.005676158],[532707.647912278,183369.204188197],[532709.849343635,183370.303873393],[532708.901162095,183372.153344254],[532707.252149629,183375.602356926],[532704.003595406,183382.300439305],[532701.802163972,183381.200753972],[532701.44762643,183381.950539817],[532698.553610274,183382.450396431],[532685.204856366,183375.902270859],[532678.402680892,183372.503243565],[532677.701850349,183372.153344164],[532675.401478353,183371.053658747],[532674.403826278,183370.603787464],[532679.103510995,183361.40642015],[532681.55229406,183356.357865497],[532687.950461738,183359.406992582],[532697.300361159,183364.005676158]]],"type":"Polygon"},{"coordinates":[[[532697.300361159,183364.005676158],[532707.647912278,183369.204188197],[532709.849343635,183370.303873393],[532708.901162095,183372.153344254],[532707.252149629,183375.602356926],[532704.003595406,183382.300439305],[532701.802163972,183381.200753972],[532701.44762643,183381.950539817],[532698.553610274,183382.450396431],[532685.204856366,183375.902270859],[532678.402680892,183372.503243565],[532677.701850349,183372.153344164],[532675.401478353,183371.053658747],[532674.403826278,183370.603787464],[532679.103510995,183361.40642015],[532681.55229406,183356.357865497],[532687.950461738,183359.406992582],[532697.300361159,183364.005676158]]],"type":"Polygon"}],"crs":{"type":"name","properties":{"name":"EPSG:27700"}}},"appeal_start_date":null,"decision_process":"Delegated","ward":"Hoxton West Ward","street_name":"NEW NORTH ROAD","secondary_street_name":null,"last_synced":"2026-05-13T02:06:10.001Z","lpa_name":"Hackney","reference_no_of_permission_being_relied_on":null,"cil_liability":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.088249,51.533595],[-0.088098,51.533639],[-0.088066,51.533649],[-0.088079,51.533665],[-0.088101,51.533697],[-0.088145,51.533758],[-0.088177,51.533748],[-0.088182,51.533755],[-0.088224,51.53376],[-0.088419,51.533705],[-0.088518,51.533676],[-0.088528,51.533673],[-0.088562,51.533663],[-0.088576,51.53366],[-0.088512,51.533576],[-0.088479,51.53353],[-0.088385,51.533556],[-0.088249,51.533595]]]},"uprn":"100023136285","application_type":"Prior Approval","centroid":{"lat":51.533686,"lon":-0.088307},"lapsed_date":"06/05/2029","application_type_full":null,"centroid_easting":532693,"actual_completion_date":null}