{"decision_target_date":"09/01/2026","last_updated_by":"Planning Portal ingest","appeal_decision_date":null,"appeal_status":null,"development_type":"Minor all other minor developments","postcode":null,"title_number":null,"application_details":{"site_area":0.098,"other_residential_accommodation_details":{"site_area":980},"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Development","intended_commencement_date":"01/2026","intended_completion_date":"05/2026"}],"total_gia_gained":709,"open_and_protected_space_details":{"protected_space_count":0,"open_space_local_and_other_area_gain":0,"open_spaces_details":[{"area":0.0708,"access":"Unrestricted","land_swap":false,"open_space_designation":"Local Open Spaces","description":"Gillett Square is a predominantly hard landscaped public square immediately to the north of Bradbury Street, and is identified as a protected open space under the Development Management Local Plan. The scheme proposes to decommission on the carpark (708sqm) located north of the square and it is to be gained as Open Space as part of the existing public square. ","open_space_type":"Amenity"}],"open_space_mol_area_loss":0,"open_space_green_belt_area_gain":0,"open_space_local_and_other_area_loss":0,"open_space_mol_area_gain":0,"open_space_green_belt_area_loss":0},"total_gia_existing":980,"total_gia_lost":709,"scheme_name":"Gillett Square Phase 2","existing_proposed_floorspace_details":[{"gia_existing":75,"use_class":"EA","gia_gained":0,"gia_lost":0},{"gia_existing":709,"use_class":"SpecifiedOther","gia_gained":0,"gia_lost":709},{"gia_existing":196,"use_class":"SG","gia_gained":709,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","rain_water_harvesting":false,"scheme_phasing":true,"grey_water_reuse":false,"surface_water_discharge_percentage_reduction":0,"green_suds":true,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":709,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":709,"total_gia_lost":709,"total_gia_existing":980},"garden_land_lost":false,"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"urban_greening_factor_score":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"ownership_status":"Public","lead_developer_company_name":"Marlborough Highways"},"decision_date":"05/02/2026","url_planning_app":"https://developmentandhousing.hackney.gov.uk//planning/index.html?fa=getApplication&id=84207","borough":"Hackney","locality":"Hackney","date_building_work_started_under_previous_permission":null,"bo_system":"Portal","parking_details":{"no_proposed_bluebadge":0,"no_existing_cycle":12,"no_proposed_cycle":12,"no_existing_car":14,"no_existing_bluebadge":2,"no_proposed_car":0,"net_car":-14,"net_bluebadge":-2,"net_cycle":0},"site_name":"Gillett Square ","epc_number":null,"pp_id":"14424715","subdivision_of_building":null,"status":"Approved","description":"Relocation of existing retail container units to the edges of the existing car park on the northern part of square, with hard and soft landscaping to facilitate the change of use from a car park (Sui Generis Use Class) to a multi-use play and retail space (Sui Generis) as an extension to the square.","decision_conditions":["Commencement within three yearsThe development hereby permitted must be begun not later than three years after the date of this permission.REASON: In order to comply with the provisions of Section 91(1) of the Town and Country Planning Act 1990 as amended.","Development in accordance with plansThe development hereby permitted shall only be carried out and completed strictly in accordance with the submitted plans hereby approved and any subsequent approval of details.REASON: To ensure that the development hereby permitted is carried out in full accordance with the plans hereby approved.","Soft LandscapingPrior to the use of the development, detailed drawings and plans for the soft landscaping scheme for the development shall be submitted to and approved in writing by the Local Planning Authority.The details shall include:1) A planting plan including species which are known to have value to wildlife;2) Soil volumes for proposed tree planting, planters and rain gardens;3) Projected mature height and crown spread of proposed new trees;4) Tree pit specifications and planter specifications for above ground planting;5) Methods of tree support - e.g. staking or underground guying and protection - e.g. tree guards, grilles etc;6) A diverse and varied planting plan and distribution of plant species to avoid block planting;7) A maintenance and management plan to ensure the long-term success of the planting scheme, including details on watering, mulching, weeding, young tree maintenance, removal of guys, stakes and ties when no longer necessary, monitoring, and replacement of failed plants;8) Areas to be grass seeded or turfed (if applicable).All landscaping in accordance with the scheme, when approved, shall be carried out within a period of twelve months from the date on which the development of the site commences or shall be carried out in the first planting (and seeding) season following completion of the development, and shall be maintained to the satisfaction of the Local Planning Authority for a period of ten years, such maintenance to include the replacement of any trees or plants that die, or are severely damaged, seriously diseased, or removed.REASON: To ensure that the site protects and enhances biodiversity, in accordance with LP47 and LP51 of the Hackney Local Plan as well as Section 15 of the National Planning Policy Framework.","Drainage MeasuresPrior to superstructure works, detailed specification, a drainage layout and a management &amp; maintenance plan (where applicable) of the rain gardens and tree pits with permeable resin-bound shall be submitted to, and approved by the LPA, in consultation with the LLFA. It must be demonstrated that there will be no increase in surface water flow being discharged offsite and an overall reduction in peak flow rate and volume.REASON: To ensure that the proposed drainage measures are acceptable for this site at risk of surface water flooding when shown in sufficient detail.","Land contaminationPrior to commencing the works a scheme including the following components to address the risks associated with site contamination shall be submitted to, and approved in writing by, the LPA.a) A preliminary risk assessment which identifies all previous uses, potential contaminants associated with those uses (including asbestos, landfill gas, vapours and ground water contaminants); a conceptual model of the site indicating sources, pathways and receptors; and potentially unacceptable risks arising from contamination at the site;b) A generic and detailed quantitative risk assessment based on (a) that identifies the risk to all receptors potentially affected, including those off site;c) In the event that remediation measures are deemed necessary following the results of (b), an options appraisal identifying feasible remediation options, detailing evaluation of options, and selecting the most appropriate remediation option(s);d) A remediation strategy focused on the remediation option(s) selected in (c) setting site specific monitoring objectives and criteria, providing details of monitoring and maintenance, and containing full details of the remediation measures required, and how they are to be undertaken.e) A verification plan explaining how the effectiveness of the remediation works set out in (d) will be measured, and how data will be collected and assessed to demonstrate that the remediation objectives and criteria will be met.f) A verification report demonstrating that remediation objectives and criteria identified in (e) have been met, assessing the remediation performance, and creating a final record of the land quality whilst providing a plan for long term monitoring and maintenance (if required).Any investigation and risk assessment must be undertaken in strict accordance with the requirements of the Environment Agency’s Land Contamination Risk Management (LCRM).If additional significant contamination is found at any time when carrying out the approved development, it must immediately be reported in writing to the LPA.For the avoidance of doubt, this condition can be discharged on a section by section basis.REASON: To protect human health and the environment by ensuring no harm is caused by land contamination, in line with paragraphs H, I and J, LP 58 of the Hackney Local Plan 2033 and the Hackney contaminated land strategy 2022/2030.","Unexploded OrdnancePrior to the commencement of any excavation works, the findings of a preliminary UXO assessment must be provided to the main contractor responsible for Health &amp; Safety matters on and off site under the CDM Regs 2015.REASON: To ensure that the construction process is carried out safely in respect of unexploded ordnance","Secured by DesignThe proposed development shall achieve Secured by Design principles to the satisfaction of the local authority &amp; Metropolitan Police, details of which shall be provided to the Local Planning Authority for its written approval prior to the first occupation/ use/ opening of the approved development. All security measures applied to the approved development shall be permanently retained thereafter.REASON: To ensure safe and secure development and reduce crime.","Public Realm Lighting Strategy/ External LightingPrior to the commencement of the relevant works, a public realm lighting strategy is to be submitted and approved by the Local Planning Authority. No external lighting related to the development hereby permitted shall be installed unless it is in full accordance with details which have been previously submitted to, and approved in writing by, the local planning authority. Such details shall include location, height, type, colour and direction of light sources and intensity of illumination, with a lux levels plan. Any lighting that is so installed shall not thereafter be altered.REASON: In the interests of public safety and private residential amenity.","Cycle ParkingAt least nine (9) Sheffield Stands for the use of cyclists shall be provided on the site prior to the commencement of the use and shall thereafter be retained.REASON: To ensure that adequate provision for the safe and secure storage of bicycles is made for occupants and visitors.","Demolition and Construction Management PlanNo development shall take place until a detailed Demolition and Construction Management Plan covering the matters set out below has been submitted to and approved in writing by the Local Planning Authority. The development shall only be implemented in accordance with the details and measures approved as part of the demolition and construction management plan, which shall be maintained throughout the entire construction period.&nbsp;&nbsp;1) A demolition and construction method statement. It will include details of all noise and vibration (including noise from ancillary or temporary power supplies, details and locations of noisy activities including mobile plant machinery) and details of the best practicable means of mitigation employed against noise and vibration in accordance with British Standard Code of Practice BS5228 and measures to control dust and preserve air quality (including a risk assessment of the demolition and construction phase);2) A detailed demolition and construction logistics plan to include the following: the construction programme/ timescales; the number/ frequency and size of construction vehicles; construction traffic route; location of deliveries; pedestrian and vehicular access arrangements; any temporary road/ footway closures during the construction period;&nbsp;3) A demolition and construction waste management plan setting out how resources will be managed and waste controlled at all stages during the construction project;4) Procedures for maintaining good public relations including complaint management, public consultation and liaison. Arrangements for liaison with the Council’s Community Safety Team;REASON: To avoid hazard and obstruction being caused to users of the public highway and Gillett Square as a result of the proposed development, in the interests of public safety and amenity and the sustainable use of materials."],"site_number":null,"last_updated":"2026-08-08T01:14:36.173Z","last_date_consultation_comments":"12/02/2026","valid_date":"14/11/2025","actual_commencement_date":null,"centroid_northing":185134,"appeal_decision":null,"decision_agency":"Borough","lpa_app_no":"2025/2513","date_building_work_completed_under_previous_permission":null,"decision":"Approved","id":"Hackney-2025_2513","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[533451.520269556,185112.75572711],[533451.544785272,185110.05656493],[533440.34430166,185109.80340662],[533440.151231907,185095.964248888],[533448.219445214,185096.025449286],[533456.202367298,185095.204535372],[533493.054569764,185094.49875045],[533498.97200242,185094.422679402],[533499.016665009,185099.85537216],[533499.860398251,185099.874589205],[533499.952950087,185111.727279178],[533451.520269556,185112.75572711]]],"type":"Polygon"}],"crs":{"type":"name","properties":{"name":"EPSG:27700"}}},"appeal_start_date":null,"decision_process":"Committee","ward":"Dalston Ward","street_name":null,"secondary_street_name":null,"last_synced":"2026-08-08T03:04:49.564Z","lpa_name":"Hackney","reference_no_of_permission_being_relied_on":null,"cil_liability":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.076719,51.549132],[-0.07672,51.549108],[-0.076881,51.549108],[-0.076889,51.548984],[-0.076773,51.548983],[-0.076658,51.548973],[-0.076127,51.548958],[-0.076042,51.548956],[-0.076039,51.549005],[-0.076027,51.549005],[-0.076021,51.549112],[-0.076719,51.549132]]]},"uprn":"10008242135","application_type":"All Other","centroid":{"lat":51.54932,"lon":-0.076517},"lapsed_date":"05/02/2029","application_type_full":"Full planning permission","centroid_easting":533465,"actual_completion_date":null}