{"decision_target_date":"14/01/2026","last_updated_by":"Planning Portal ingest","appeal_decision_date":null,"appeal_status":null,"development_type":"Other house holder developments","postcode":"E5 0EX","title_number":["LN43648"],"application_details":{"total_gia_gained":0.5,"no_additional_bathrooms":0,"no_additional_bedrooms":0,"intended_completion_date":"12/2026","intended_commencement_date":"02/2026"},"decision_date":"27/03/2026","url_planning_app":"https://developmentandhousing.hackney.gov.uk//planning/index.html?fa=getApplication&id=84072","borough":"Hackney","locality":"London","date_building_work_started_under_previous_permission":null,"bo_system":"Portal","parking_details":null,"site_name":null,"epc_number":"0032-6420-7209-0524-1222","pp_id":"14349402","subdivision_of_building":null,"status":"Approved","description":"Demolition of the existing side return and its replacement with a new single storey side return extension. The lowering of the lower ground floor with the provisions of a new access and external staircase from the front of the property.","decision_conditions":["<p>The Development hereby permitted shall only be carried out and completed strictly in accordance with the submitted plans hereby approved and any subsequent approval of details.\r\n</p><p><br></p><p>\r\nREASON: To ensure that the development hereby permitted is carried out in full accordance with the plans hereby approved.\r\n</p>","<p>The development hereby permitted must be begun not later than the expiration of three years beginning with the date of this permission.</p><p><br></p><p>\r\n</p><p>\r\nREASON: In order to comply with the provisions of the Town and Country Planning Act 1990 (as amended).</p><p>\r\n</p>","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;text-align: justify;background-color:#ffffff;margin-top:6pt;margin-bottom:0pt;padding:0pt 0pt 6pt 0pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#222222;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;The works hereby approved shall not be carried out unless in accordance with the approved Tree Protection Plan and Arboricultural Method Statement. The measures set out in the Tree Protection Plan shall remain in place until the completion of the construction. Any permanent hard surfacing within RPAs of retained trees should be installed and maintained in line with the approved AMS using a ‘no-dig’ method as outlined within the report.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;padding:0pt 0pt 6pt 0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-25bdc301-7fff-30ce-965d-e24e881456e2&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:6pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#222222;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: To safeguard existing tree(s) in the interests of visual amenity, having regard to Policy LP51 in the Local Plan 2033 (adopted 2020) and pursuant to Section 197 of the Town and Country Planning Act 1990.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;text-align: justify;background-color:#ffffff;margin-top:6pt;margin-bottom:0pt;padding:0pt 0pt 6pt 0pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#222222;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;In order to mitigate the detrimental impact of the significant Root Protection Area (RPA) incursion of T2 and cumulative RPA incursion of other trees on site as permitted by this decision, a new tree shall be planted in the rear garden.&amp;nbsp; The new tree shall be planted during the planting season at the time of felling (end October - end March) or during the next immediately available planting season.&amp;nbsp; The size of the tree shall be at least a Selected Standard as per BS 3936-1:1992 (or any standard that reproduces or replaces this standard).&amp;nbsp; The tree shall be maintained for 5 years after planting and should it be removed, die, be severely damaged or become seriously diseased within this period it shall be replaced with another tree as originally required to be planted by this condition.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;padding:0pt 0pt 6pt 0pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#222222;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-8372cbfd-7fff-69c9-0280-6b92e67484c6&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:6pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#222222;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: In the interests of visual amenity, in accordance with Hackney Local Plan LP33; LP51 (adopted 2020) and pursuant to section 197 of the Town and Country Planning Act 1990.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;text-align: justify;background-color:#ffffff;margin-top:6pt;margin-bottom:0pt;padding:0pt 0pt 6pt 0pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#222222;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;All new underground utility apparatus, including drainage, shall be routed and installed outside the Root Protection Area(s) (RPAs) shown on the approved drawings. Should it not be feasible to route new underground utility apparatus outside the RPAs of retained trees, trenchless insertion methods (as detailed in BS 5837:2012, Table 3) shall be employed for their installation within the RPAs, with entry and retrieval pits sited outside the RPAs. No other new underground utilities shall be installed within the RPAs of retained trees without prior written consent from the Local Planning Authority (LPA). Any such works, if permitted, shall be carried out in strict accordance with the principles of BS 5837:2012 &quot;Trees in relation to design, demolition and construction – Recommendations&quot; and the National Joint Utilities Group Guidelines for the planning, installation and maintenance of utility apparatus in proximity to trees, Volume 4, Issue 2 (2007) (or any standard that reproduces or replaces this standard).&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;padding:0pt 0pt 6pt 0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-b83ce40d-7fff-a518-b2cd-b76bbb532989&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:6pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#222222;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: To safeguard existing tree(s) in the interests of visual amenity and long-term tree health, having regard to Policy LP51 in the Local Plan 2033 (adopted 2020). Prior approval is required to ensure that important trees are not permanently damaged or lost due to root disturbance or changes in soil hydrology.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;text-align: justify;background-color:#ffffff;margin-top:6pt;margin-bottom:0pt;padding:0pt 0pt 6pt 0pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#222222;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Prior to the commencement of development, a qualified tree specialist must be appointed to provide arboricultural supervision and inspection. The details of this appointment and the specialist&#x27;s responsibilities must be submitted to and approved in writing by the Local Planning Authority. The submission should include the methodology and programme for reporting, as well as a timetable for inspections.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;padding:0pt 0pt 6pt 0pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#222222;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;The approved works must be carried out in strict accordance with the approved details. Upon completion of the development, a report from the appointed arboriculturist must be submitted to and approved in writing by the Local Planning Authority, confirming that all tree protection measures and tree works were carried out in accordance with the approved plans accompanied by photographs taken at critical stages.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;padding:0pt 0pt 6pt 0pt;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-224f08ef-7fff-de80-b05a-f3eed1b4f917&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:6pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#222222;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: to ensure that works affecting trees are carried out in a professional and controlled manner, safeguarding their health and long-term viability. This is in accordance with good arboricultural practice and is supported by BS 5837:2012 and Policy LP51 of the Hackney Local Plan 2033.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;text-align: justify; line-height: 1.2; margin-top: 0pt; margin-bottom: 0pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;Prior to superstructure works, detailed specification and a drainage layout of at least one suitable sustainable drainage systems (i.e. water butt with overflow, raingarden, bioretention planter box, living roof (substrate depth of 80-150mm excluding the vegetative mat), permeable paving, etc.) shall be submitted to, and approved by the LPA, in consultation with the LLFA. If soakaways i.e. plastic modules and soakaway rings are used, an infiltration test must be carried out to ensure that the capacity of the soil is suitable for infiltration. It must be demonstrated that there will be no increase in surface water flow being discharged offsite and an overall reduction in peak flow rate and volume&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span id=&quot;docs-internal-guid-3c497f6f-7fff-9333-0bc1-42fbc7d2793c&quot;&gt;&lt;br&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;text-align: justify; line-height: 1.2; margin-top: 0pt; margin-bottom: 0pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;REASON: To ensure the provision of sustainable drainage measures onsite, in accordance with LP53 of LP33 and Policy SI 13 of the London Plan 2021&lt;/span&gt;&lt;/p&gt;"],"site_number":118,"last_updated":"2026-06-27T18:56:59.183Z","last_date_consultation_comments":"26/12/2025","valid_date":"19/11/2025","actual_commencement_date":null,"centroid_northing":185715,"appeal_decision":null,"decision_agency":"Borough","lpa_app_no":"2025/2541","date_building_work_completed_under_previous_permission":null,"decision":"Approved","id":"Hackney-2025_2541","polygon":{"type":"GeometryCollection","geometries":[{"coordinates":[[[535457.45,185720.35],[535457.35,185713],[535457.55,185693.3],[535462.55,185694.2],[535462.627,185706.133],[535462.6,185707.8],[535462.65,185720.4],[535462.65,185723.45],[535457.5,185723.35],[535457.45,185720.35]]],"type":"Polygon"}],"crs":{"type":"name","properties":{"name":"EPSG:27700"}}},"appeal_start_date":null,"decision_process":"Delegated","ward":"Lea Bridge Ward","street_name":"Rushmore Road","secondary_street_name":null,"last_synced":"2026-06-28T01:56:32.084Z","lpa_name":"Hackney","reference_no_of_permission_being_relied_on":null,"cil_liability":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.047573,51.554115],[-0.047577,51.554049],[-0.047582,51.553871],[-0.04751,51.553878],[-0.047504,51.553986],[-0.047504,51.554001],[-0.047498,51.554114],[-0.047497,51.554141],[-0.047571,51.554142],[-0.047573,51.554115]]]},"uprn":100021070120,"application_type":"Householder","centroid":{"lat":51.554066,"lon":-0.047538},"lapsed_date":"27/03/2029","application_type_full":"Householder planning permission","centroid_easting":535460,"actual_completion_date":null}