{"postcode":"N16 7NH","status":"Approved","decision_agency":"Borough","subdivision_of_building":null,"appeal_start_date":null,"cil_liability":null,"decision_conditions":["<p>The Development hereby permitted shall only be carried out and completed strictly in accordance with the submitted plans hereby approved and any subsequent approval of details.\r\n</p><p><br></p><p>\r\nREASON: To ensure that the development hereby permitted is carried out in full accordance with the plans hereby approved.\r\n</p>","<p>The development hereby permitted must be begun not later than the expiration of three years beginning with the date of this permission.</p><p><br></p><p>\r\n</p><p>\r\nREASON: In order to comply with the provisions of the Town and Country Planning Act 1990 (as amended).</p><p>\r\n</p>","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.3800000000000001;text-align: justify;background-color:#ffffff;margin-top:6pt;margin-bottom:0pt;padding:0pt 0pt 6pt 0pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Prior to commencing the works, for each section of the development or stage in the development - as may be agreed in writing by the Local Planning Authority (LPA) - a scheme including the following components to address the risks associated with site contamination shall be submitted to, and approved in writing by, the LPA.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.3800000000000001;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;padding:0pt 0pt 6pt 0pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:700;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;a) &lt;/span&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;A preliminary risk assessment which identifies all previous uses, potential contaminants associated with those uses (including asbestos, landfill gas, vapours and ground water contaminants); a conceptual model of the site indicating sources, pathways and receptors; and potentially unacceptable risks arising from contamination at the site;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.3800000000000001;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;padding:0pt 0pt 6pt 0pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:700;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;b) &lt;/span&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;A generic and detailed quantitative risk assessment based on (a) that identifies the risk to all receptors potentially affected, including those off site;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.3800000000000001;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;padding:0pt 0pt 6pt 0pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:700;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;c)&lt;/span&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt; In the event that remediation measures are deemed necessary following the results of (b), an options appraisal identifying feasible remediation options, detailing evaluation of options, and selecting the most appropriate remediation option(s);&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.3800000000000001;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;padding:0pt 0pt 6pt 0pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:700;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;d)&lt;/span&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt; A remediation strategy focused on the remediation option(s) selected in (c) setting site specific monitoring objectives and criteria, providing details of monitoring and maintenance, and containing full details of the remediation measures required, and how they are to be undertaken.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.3800000000000001;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;padding:0pt 0pt 6pt 0pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:700;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;e) &lt;/span&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;A verification plan explaining how the effectiveness of the remediation works set out in (d) will be measured, and how data will be collected and assessed to demonstrate that the remediation objectives and criteria will be met&lt;/span&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:700;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.3800000000000001;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;padding:0pt 0pt 6pt 0pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:700;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;f) &lt;/span&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;A verification report demonstrating that remediation objectives and criteria identified in (e) have been met, assessing the remediation performance, and creating a final record of the land quality whilst providing a plan for long term monitoring and maintenance (if required). Any investigation and risk assessment must be undertaken in strict accordance with the requirements of the Environment Agency’s Land Contamination Risk Management (LCRM).&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.3800000000000001;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;padding:0pt 0pt 6pt 0pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;If additional significant contamination is found at any time when carrying out the approved development, it must immediately be reported in writing to the LPA. For the avoidance of doubt, this condition can be discharged on a section by section basis.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.3800000000000001;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;padding:0pt 0pt 6pt 0pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:700;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Reason:&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.3800000000000001;text-align: justify;background-color:#ffffff;margin-top:0pt;margin-bottom:0pt;padding:0pt 0pt 6pt 0pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;To protect human health and the environment by ensuring no harm is caused by land contamination, in line with paragraphs H, I and J, LP 58 of the Hackney Local Plan 2033 and the Hackney contaminated land strategy 2022/2030.&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;&lt;span id=&quot;docs-internal-guid-b36d1c12-7fff-da2d-e0d5-886825251183&quot;&gt;&lt;span style=&quot;font-size: 12px; font-family: Arial, sans-serif; background-color: transparent; font-variant: normal; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;Details of appropriate controls including flood resilience and/or resistance measures against surface water (overland flow) and groundwater (if identified) shall be submitted to the LPA for approval and the approved measures incorporated before the basement is occupied. The basement shall be constructed and completed in accordance with the approved plans in line with BS 8102:2022 Protection of below ground structures against water ingress - code of practice. &lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-b36d1c12-7fff-da2d-e0d5-886825251183&quot;&gt;&lt;span style=&quot;font-size: 10pt; font-family: Arial, sans-serif; background-color: transparent; font-variant: normal; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-b36d1c12-7fff-da2d-e0d5-886825251183&quot;&gt;&lt;span style=&quot;font-size: 10pt; font-family: Arial, sans-serif; background-color: transparent; font-variant: normal; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;&lt;span id=&quot;docs-internal-guid-9d8f6304-7fff-703d-3058-ea92537cefc2&quot;&gt;&lt;span style=&quot;font-size: 12px; background-color: transparent; font-variant: normal; vertical-align: baseline;&quot;&gt;&amp;nbsp;To ensure the provision of flood risk mitigation measures onsite&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;&lt;span id=&quot;docs-internal-guid-248073cc-7fff-0941-fc78-cd41f2b7c364&quot;&gt;&lt;span style=&quot;font-size: 14px; font-family: Arial, sans-serif; background-color: transparent; font-variant: normal; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;Prior to superstructure works, detailed specification, a drainage layout and a management &amp;amp; maintenance plan (where applicable) of at least one suitable sustainable drainage system (i.e. water butt with overflow, raingarden, bioretention planter box, living roof (substrate depth of 80 150mm excluding the vegetative mat), permeable paving etc.) shall be submitted to, and approved by the LPA, in consultation with the LLFA. If soakaways i.e. plastic modules and soakaway rings are used, an infiltration test must be carried out to ensure that the capacity of the soil is suitable for infiltration. It must be demonstrated that there will be no increase in surface water flow being discharged offsite and an overall reduction in peak flow rate and volume. No development shall commence, other than works of demolition, until a report (including intrusive investigation/trial pit and monitoring where necessary) demonstrating that the basement development and lightwell will not increase the potential for groundwater flooding to itself or to the surrounding area has been submitted to the Local Planning Authority for approval.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-248073cc-7fff-0941-fc78-cd41f2b7c364&quot;&gt;&lt;span style=&quot;font-size: 14px; font-family: Arial, sans-serif; background-color: transparent; font-variant: normal; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;Reason: &lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;background-color: transparent; font-family: Arial, sans-serif; font-size: 14px; white-space: pre-wrap;&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;span style=&quot;background-color: transparent; font-family: Arial, sans-serif; font-size: 11pt; white-space: pre-wrap;&quot;&gt;To ensure the provision of sustainable drainage measures onsite&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;background-color: transparent; font-family: Arial, sans-serif; font-size: 11pt; white-space: pre-wrap;&quot;&gt;The development hereby approved shall provide two swift boxes close to the eaves prior to first occupation and shall be retained as such in perpetuity.&amp;nbsp;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;text-align: justify;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;background-color: transparent; font-family: Arial, sans-serif; font-size: 11pt; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/span&gt;&lt;span style=&quot;background-color: transparent; font-family: Arial, sans-serif; font-size: 11pt; white-space: pre-wrap;&quot;&gt;REASON: To promote biodiversity on site in line with policy LP47 of the Hackney Local Plan 2033 (2020). &lt;/span&gt;&lt;/p&gt;"],"actual_commencement_date":null,"pp_id":"14531553","decision_target_date":"05/02/2026","valid_date":"11/12/2025","lpa_app_no":"2025/2657","locality":"HACKNEY","appeal_decision_date":null,"parking_details":{"net_cycle":2,"no_proposed_cycle":2,"no_existing_cycle":0},"decision_process":"Delegated","street_name":"LESWIN ROAD","last_synced":"2026-07-13T01:46:27.601Z","site_number":"42","centroid_easting":533696,"polygon":{"crs":{"properties":{"name":"EPSG:27700"},"type":"name"},"geometries":[{"coordinates":[[[533713.24854512,186164.054170143],[533706.619515937,186164.414067225],[533703.651293589,186164.454056004],[533690.500420998,186165.103869584],[533687.268357086,186165.263824276],[533687.449748776,186160.105300971],[533690.648832138,186160.00532915],[533698.102367622,186159.855372328],[533713.504142051,186159.455486562],[533713.24854512,186164.054170143]]],"type":"Polygon"},{"coordinates":[[[533713.24854512,186164.054170143],[533706.619515937,186164.414067225],[533703.651293589,186164.454056004],[533690.500420998,186165.103869584],[533687.268357086,186165.263824276],[533687.449748776,186160.105300971],[533690.648832138,186160.00532915],[533698.102367622,186159.855372328],[533713.504142051,186159.455486562],[533713.24854512,186164.054170143]]],"type":"Polygon"}],"type":"geometrycollection"},"ward":"Stoke Newington Ward","centroid_northing":186163,"application_type":"Householder","uprn":"100021054247","lapsed_date":"29/06/2029","actual_completion_date":null,"decision":"Approved","site_name":null,"borough":"Hackney","last_date_consultation_comments":"05/01/2026","application_type_full":"Householder planning permission","url_planning_app":"https://developmentandhousing.hackney.gov.uk//planning/index.html?fa=getApplication&id=84173","decision_date":"29/06/2026","bo_system":"Portal","development_type":"Other house holder developments","appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Erection of a single storey wraparound rear extension; formation of a rear lightwell and front rooflight in connection with excavation of the basement; replacement of existing rear dormer; installation of two rooflights and photovoltaic panels; replacement and insertion of windows; and associated front boundary treatment and landscaping works. ","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":"8000-6025-7150-5638-9996","last_updated":"2026-07-08T01:56:55.034Z","centroid":{"lon":-0.072796,"lat":51.558512},"lpa_name":"Hackney","secondary_street_name":null,"application_details":{"total_gia_gained":40.2,"no_additional_bathrooms":1,"no_additional_bedrooms":1,"intended_commencement_date":"04/2026","intended_completion_date":"09/2026"},"wgs84_polygon":{"coordinates":[[[-0.072547,51.558518],[-0.072643,51.558522],[-0.072685,51.558523],[-0.072875,51.558532],[-0.072921,51.558535],[-0.072921,51.558488],[-0.072875,51.558487],[-0.072767,51.558483],[-0.072545,51.558476],[-0.072547,51.558518]]],"type":"Polygon"},"id":"Hackney-2025_2657","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"Planning Portal ingest"}