{"decision_target_date":"27/02/2026","last_updated_by":"Portal","appeal_decision_date":null,"appeal_status":null,"development_type":"Other advertisements","postcode":"E8 1HE","title_number":null,"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"single phase (to be complete any time within approved condition period)","intended_completion_date":"02/2026","intended_commencement_date":"02/2026"}],"total_gia_gained":0,"site_area":4.3E-5,"total_gia_lost":0,"total_gia_existing":0,"projected_cost_of_works":"Up to £2m","occupation_status":"Vacant","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_lost":0,"total_gia_existing":0},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"urban_greening_factor_score":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":false,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":0,"ownership_status":"Public"},"decision_date":"08/09/2026","url_planning_app":"https://developmentandhousing.hackney.gov.uk//planning/index.html?fa=getApplication&id=84369","borough":"Hackney","locality":"HACKNEY","date_building_work_started_under_previous_permission":null,"bo_system":"Portal","parking_details":null,"site_name":"HACKNEY PICTUREHOUSE","epc_number":null,"pp_id":"14555116","subdivision_of_building":"N/A","status":"Refused","description":"Installation of 1No. BT Street Hub Unit and associated advertisement panels on either side of the unit","decision_conditions":["&lt;p&gt;&lt;span id=&quot;docs-internal-guid-d5f122cb-7fff-78c6-366f-073bc1d1803a&quot;&gt;&lt;span style=&quot;font-size: 12pt; font-family: Arial, sans-serif; font-variant: normal; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;The proposed illuminated advertisement, by reason of its inappropriate scale, appearance and location, would comprise an incongruous, overbearing and discordant feature to the detriment of the visual amenity of the street scene and harm the setting of the Grade II* Listed The Hackney Empire, Grade II Listed Hackney Town Hall and the character and appearance of the Town Hall Square Conservation Area. As such, the proposal would be contrary to policies D3 (Optimising Site Capacity through the Design-led Approach) and HC1 (Heritage conservation and growth) of the London Plan (2021) and policies LP1 (Design quality and local character), LP3 (Designated Heritage Assets) and LP7 (Advertisements) of Hackney&#x27;s Local Development Plan (2020).&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;&lt;span id=&quot;docs-internal-guid-08897086-7fff-bb80-b7c2-fc2858c33a93&quot;&gt;&lt;span style=&quot;font-size: 12pt; font-family: Arial, sans-serif; font-variant: normal; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;The proposed illuminated advertisement, by reason of its scale, appearance and location would result in an obstructive and intrusive form of development that would obstruct the pavement, reduce the amount of space available for use by pedestrians, block lines of sight creating blind spots and create distractions for highway users thereby reducing the safety of the highway. As such the proposed development is contrary to policy D8 (Public Realm) and T2 (Healthy Streets) of the London Plan (2021) as well as policy PP1 (Public Realm), LP7 (Advertisements), LP41 (Liveable Neighbourhoods) and LP42 (Walking and Cycling), LP43 (Transport and Development) of the Hackney Local Plan.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;"],"site_number":"270","last_updated":"2026-10-06T07:33:06.221Z","last_date_consultation_comments":"08/02/2026","valid_date":"02/01/2026","actual_commencement_date":null,"centroid_northing":184716,"appeal_decision":null,"decision_agency":"Borough","lpa_app_no":"2025/2867","date_building_work_completed_under_previous_permission":null,"decision":"Refused","id":"Hackney-2025_2867","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[534955.820376228,184718.676211972],[534957.498737371,184718.699082776],[534957.062308944,184712.624240397],[534955.391602349,184712.696198225],[534955.820376228,184718.676211972]]],"type":"Polygon"}],"crs":{"type":"name","properties":{"name":"EPSG:27700"}}},"appeal_start_date":null,"decision_process":"Delegated","ward":"Homerton Ward","street_name":"MARE STREET","secondary_street_name":null,"last_synced":"2026-10-07T01:47:58.391Z","lpa_name":"Hackney","reference_no_of_permission_being_relied_on":null,"cil_liability":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.055188,51.545233],[-0.055164,51.545233],[-0.055172,51.545179],[-0.055196,51.54518],[-0.055188,51.545233]]]},"uprn":"100023014120","application_type":"All Other","centroid":{"lat":51.545209,"lon":-0.055186},"lapsed_date":"08/09/2029","application_type_full":"Full planning & display of advertisements","centroid_easting":534956,"actual_completion_date":null}