{"actual_commencement_date":null,"date_building_work_completed_under_previous_permission":null,"lpa_name":"Hackney","subdivision_of_building":null,"appeal_decision":null,"lapsed_date":"04/02/2029","appeal_decision_date":null,"last_updated_by":"Portal","reference_no_of_permission_being_relied_on":null,"epc_number":null,"last_updated":"2026-04-15T11:42:01.416Z","url_planning_app":"https://developmentandhousing.hackney.gov.uk//planning/index.html?fa=getApplication&id=84538","street_name":"KINGSLAND ROAD","parking_details":null,"ward":"Dalston Ward","bo_system":"Portal","site_name":"William Gee House","site_number":"520 - 522","application_details":{},"uprn":"100023018336","locality":"HACKNEY","date_building_work_started_under_previous_permission":null,"postcode":"E8 4AH","valid_date":"30/01/2026","cil_liability":null,"actual_completion_date":null,"centroid":{"lat":51.544323,"lon":-0.075603},"centroid_easting":533543,"application_type_full":"Non-Material Amendment","pp_id":"14645057","lpa_app_no":"2026/0154","polygon":{"geometries":[{"coordinates":[[[533556.79851029,184581.207256026],[533556.749039888,184586.455753487],[533557.301458683,184586.455753487],[533557.301458945,184590.604565899],[533555.100027606,184590.604566063],[533543.004523327,184591.204393989],[533539.904380244,184591.35435104],[533539.846664634,184591.754237007],[533534.55333521,184592.15412235],[533534.553335566,184592.603993392],[533522.202233821,184593.403764314],[533522.053823011,184588.55515224],[533521.847696511,184582.506883578],[533538.304838084,184581.60714114],[533538.049241354,184575.498890089],[533539.30249073,184575.348933014],[533539.046893708,184569.800520857],[533538.700601117,184569.80052124],[533538.601660543,184566.351508324],[533538.502719572,184563.702266671],[533539.500371859,184563.652280541],[533542.130546544,184563.452338366],[533542.847866706,184563.402352571],[533557.029371675,184562.082730148],[533557.054106888,184562.402638494],[533557.004637021,184568.700835847],[533556.946921166,184573.649418982],[533556.847980777,184579.7576708],[533556.79851029,184581.207256026]]],"type":"Polygon"},{"coordinates":[[[533556.79851029,184581.207256026],[533556.749039888,184586.455753487],[533557.301458683,184586.455753487],[533557.301458945,184590.604565899],[533555.100027606,184590.604566063],[533543.004523327,184591.204393989],[533539.904380244,184591.35435104],[533539.846664634,184591.754237007],[533534.55333521,184592.15412235],[533534.553335566,184592.603993392],[533522.202233821,184593.403764314],[533522.053823011,184588.55515224],[533521.847696511,184582.506883578],[533538.304838084,184581.60714114],[533538.049241354,184575.498890089],[533539.30249073,184575.348933014],[533539.046893708,184569.800520857],[533538.700601117,184569.80052124],[533538.601660543,184566.351508324],[533538.502719572,184563.702266671],[533539.500371859,184563.652280541],[533542.130546544,184563.452338366],[533542.847866706,184563.402352571],[533557.029371675,184562.082730148],[533557.054106888,184562.402638494],[533557.004637021,184568.700835847],[533556.946921166,184573.649418982],[533556.847980777,184579.7576708],[533556.79851029,184581.207256026]]],"type":"Polygon"}],"crs":{"properties":{"name":"EPSG:27700"},"type":"name"},"type":"geometrycollection"},"id":"Hackney-2026_0154","appeal_status":null,"appeal_start_date":null,"description":"Non material amendment to planning permission ref 2022/1030 dated 17/05/2023 comprising amendments to the wording of condition&nbsp;8 (Detailed Design, Method Statement &amp; Risk Assessment).","development_type":"Q28","decision_conditions":["&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.38; margin-top: 10pt; margin-bottom: 10pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;Rail for London (RfL) Asset Protection&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.38; margin-top: 10pt; margin-bottom: 10pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;No development shall commence until the following requirements have been met to the satisfaction of the Local Planning Authority, in consultation with Rail for London (RfL):&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.38; margin-top: 10pt; margin-bottom: 10pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;a) The applicant has entered into an Asset Protection Agreement with Rail for London, and the development shall thereafter be carried out fully in accordance with the requirements of that agreement and RfL’s Infrastructure Protection – Special Conditions for Outside Parties Working, to ensure the safe protection of RfL assets and operations.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.38; margin-top: 10pt; margin-bottom: 10pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;b) Prior to the commencement of the relevant works agreed in the Asset Protection Agreement, detailed design, method statements &amp;amp; risk assessments for the demolition and associated temporary works have been submitted to and approved in writing by the local planning authority (in consultation with Rail for London (RfL)) which: provide details on all structures; provide details on the use of plant; accommodate the location of the existing RfL Assets / Infrastructure; accommodate RfL Operational and Maintenance requirements; accommodate ground movement arising from the construction thereof; mitigate the effects of noise, vibration &amp;amp; distractions arising from the adjoining operations to the RfL Infrastructure &amp;amp; Operations.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.38; margin-top: 10pt; margin-bottom: 10pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;The development shall thereafter be carried out in all respects in accordance with the approved design and method statements, and all structures and works comprised within the development hereby permitted which are required by the approved design statements in order to procure the matters mentioned in paragraphs of this condition shall be completed, in their entirety, before any part of the building hereby permitted is occupied.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.38; margin-top: 10pt; margin-bottom: 10pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;c) Prior to the commencement of the relevant works agreed in the Asset Protection Agreement, detailed design, method statements &amp;amp; risk assessments for the sub structure and associated temporary works have been submitted to and approved in writing by the local planning authority (in consultation with Rail for London (RfL)) which: provide details on all structures; provide details on the use of plant; accommodate the location of the existing RfL Assets / Infrastructure; accommodate RfL Operational and Maintenance requirements; accommodate ground movement arising from the construction thereof; mitigate the effects of noise, vibration &amp;amp; distractions arising from the adjoining operations to the RfL Infrastructure &amp;amp; Operations.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.38; margin-top: 10pt; margin-bottom: 10pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;All drainage needs to be directed away from the railway and into local authority sewers, and it should be installed a minimum distance of two metres from the railway boundary. The use of soakaways is not favoured by RfL and therefore is unacceptable as they could have a detrimental effect on RfL land. The drainage system should be designed to take this into account.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.38; margin-top: 10pt; margin-bottom: 10pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;The development shall thereafter be carried out in all respects in accordance with the approved design and method statements, and all structures and works comprised within the development hereby permitted which are required by the approved design statements in order to procure the matters mentioned in paragraphs of this condition shall be completed, in their entirety, before any part of the building hereby permitted is occupied.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.38; margin-top: 10pt; margin-bottom: 10pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;d) Prior to the commencement of the relevant works agreed in the Asset Protection Agreement, detailed design, method statements &amp;amp; risk assessments for the super structure and associated temporary works have been submitted to and approved in writing by the local planning authority (in consultation with Rail for London (RfL)) which: provide details on all structures; provide details on the use of plant; accommodate the location of the existing RfL Assets / Infrastructure; accommodate RfL Operational and Maintenance requirements; accommodate ground movement arising from the construction thereof; mitigate the effects of noise, vibration &amp;amp; distractions arising from the adjoining operations to the RfL Infrastructure &amp;amp; Operations.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.38; margin-top: 10pt; margin-bottom: 10pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;The development shall thereafter be carried out in all respects in accordance with the approved design and method statements, and all structures and works comprised within the development hereby permitted 1/22/26, 5:33 PM Re: 2025/2362 – William Gee House, 520 - 522 Kingsland Road, Hackney, London, E8 4AH - David Simmons - Outlook about:blank?windowId=SecondaryReadingPane1 3/13 which are required by the approved design statements in order to procure the matters mentioned in paragraphs of this condition shall be completed, in their entirety, before any part of the building hereby permitted is occupied.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.38; margin-top: 10pt; margin-bottom: 10pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;e) Prior to the occupation of the development, the applicant shall undertake a post-construction radio and GSM-R survey (following the initial baseline survey) to assess any impact on RfL’s communications infrastructure. Where the surveys identify adverse impacts attributable to the development, any necessary mitigation, enhancement, or renewal works shall be carried out at the applicant’s expense and to the satisfaction of the Local Planning Authority (in consultation with RfL) prior to the first occupation of the building.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.38; margin-top: 10pt; margin-bottom: 10pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;The development shall thereafter be carried out in all respects in accordance with the approved design and method statements, and all structures and works comprised within the development hereby permitted which are required by the approved design statements in order to procure the matters mentioned in paragraphs of this condition shall be completed, in their entirety, before any part of the building hereby permitted is occupied.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-319178ef-7fff-faf1-e1aa-2a373e705a17&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.38; margin-top: 10pt; margin-bottom: 10pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;REASON: To ensure that the development does not impact on existing or proposed Rail for London transport infrastructure &amp;amp; operations.&lt;/span&gt;&lt;/p&gt;"],"last_synced":"2026-04-16T02:52:32.912Z","secondary_street_name":null,"title_number":null,"last_date_consultation_comments":null,"decision_process":"Delegated","centroid_northing":184580,"borough":"Hackney","decision":"Approved","application_type":"All Other","wgs84_polygon":{"coordinates":[[[-0.075403,51.544331],[-0.075402,51.544378],[-0.075394,51.544378],[-0.075392,51.544415],[-0.075424,51.544415],[-0.075598,51.544424],[-0.075643,51.544426],[-0.075643,51.544429],[-0.07572,51.544434],[-0.075719,51.544438],[-0.075897,51.544448],[-0.075901,51.544405],[-0.075906,51.544351],[-0.07567,51.544339],[-0.075676,51.544284],[-0.075658,51.544282],[-0.075663,51.544232],[-0.075668,51.544232],[-0.075671,51.544201],[-0.075673,51.544178],[-0.075659,51.544177],[-0.075621,51.544175],[-0.075611,51.544174],[-0.075407,51.544159],[-0.075407,51.544162],[-0.075405,51.544218],[-0.075404,51.544263],[-0.075403,51.544318],[-0.075403,51.544331]]],"type":"Polygon"},"decision_agency":"Borough","decision_target_date":"27/02/2026","status":"Approved","decision_date":"04/02/2026"}