{"decision_target_date":"18/05/2026","last_updated_by":"Planning Portal ingest","appeal_decision_date":null,"appeal_status":null,"development_type":"Minor all other minor developments","postcode":"E9 5DG","title_number":null,"application_details":{"site_area":0.0101,"other_residential_accommodation_details":{"site_area":101},"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Start ","intended_completion_date":"08/2026","intended_commencement_date":"05/2026"}],"total_gia_gained":29.9,"total_gia_lost":87.9,"total_gia_existing":58,"existing_proposed_floorspace_details":[{"gia_existing":58,"gia_gained":29.9,"use_class":"C3","gia_lost":87.9}],"projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","scheme_phasing":true,"rain_water_harvesting":false,"building_details":[{"no_storeys":3,"max_height":8.92,"building_ref":"255a Wick Rd, "}],"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":29.9,"total_gia_lost":87.9,"total_gia_existing":58},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":0,"green_roof_area":3,"urban_greening_factor_score":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":0,"ownership_status":"Private"},"decision_date":"15/05/2026","url_planning_app":"https://developmentandhousing.hackney.gov.uk//planning/index.html?fa=getApplication&id=84976","borough":"Hackney","locality":"London","date_building_work_started_under_previous_permission":null,"bo_system":"Portal","parking_details":null,"site_name":null,"epc_number":null,"pp_id":"14719527","subdivision_of_building":"1st floor flat, and roof ","status":"Approved","description":"Mansard Roof extension ,to create 2 bedroom flat, removed existing butterfly roof ","decision_conditions":["<p>The Development hereby permitted shall only be carried out and completed strictly in accordance with the submitted plans hereby approved and any subsequent approval of details.\r\n</p><p><br></p><p>\r\nREASON: To ensure that the development hereby permitted is carried out in full accordance with the plans hereby approved.\r\n</p>","No development shall take place until a detailed Demolition and Construction Management Plan covering the specific matters set out below has been submitted to and approved in writing by the Local Planning Authority in consultation with TfL.a) The footway and carriageway on Wick Road must not be blocked during the construction of the proposal. Temporary obstructions must be kept to a minimum and should not encroach on the clear space needed to provide safe passage for pedestrians or obstruct the flow of traffic on Wick Road, to comply with London Plan policy T2 (Healthy Streets).b) All vehicles associated with the development must only park/ stop at permitted locations and within the time periods permitted by existing on-street restrictions, details of locations and time periods shall be submitted within the CMP.c) No skips or construction materials shall be kept on the footway or carriageway on the TLRN at any time.&nbsp;The development shall only be implemented in accordance with the approved details and measures relating to the specific matters set out above, which shall be maintained throughout the entire demolition/construction period.REASON: In the interest of the highway safety and pedestrian movement","All new external finishes in respect of all the works hereby approved (and any other incidental works to be carried out in this connection) shall match the existing building in respect of materials used, detailed execution and finished appearance, unless otherwise stated on the drawings hereby approved.REASON: To ensure that the external appearance of the building is satisfactory and does not detract from the character and visual amenity of the area.","<p>The development hereby permitted must be begun not later than the expiration of three years beginning with the date of this permission.</p><p><br></p><p>\r\n</p><p>\r\nREASON: In order to comply with the provisions of the Town and Country Planning Act 1990 (as amended).</p><p>\r\n</p>","Prior to the occupation of the development hereby approved, details and full specifications of 1 x swift brick shall be submitted to and approved in writing by the Local Planning Authority and shall be maintained for the lifespan of the development. The details should include:a) A minimum of 1 swift brick incorporated into the design of the development. It should be placed at or close to eaves level of the development hereby approved. The swift brick should be located facing north, east, or north east and should not be placed immediately above doors or windows.REASON: To support bird populations, including swifts, in Hackney and preserve endangered urban biodiversity, by providing nesting opportunities, in accordance with Hackney’s Local Plan LP33 policy LP47 which states that all development schemes involving buildings with an eaves height or roof commencement height of 5 metres and above are required to provide nesting boxes for swifts, sparrows, starlings, as appropriate."],"site_number":255,"last_updated":"2026-06-28T04:23:45.211Z","last_date_consultation_comments":"23/04/2026","valid_date":"23/03/2026","actual_commencement_date":null,"centroid_northing":184767,"appeal_decision":null,"decision_agency":"Borough","lpa_app_no":"2026/0400","date_building_work_completed_under_previous_permission":null,"decision":"Approved","id":"Hackney-2026_0400","polygon":{"type":"GeometryCollection","geometries":[{"coordinates":[[[536325.6,184760.55],[536330.4,184758.7],[536336.75,184777.4],[536332.55,184778.75],[536325.6,184760.55]]],"type":"Polygon"}],"crs":{"type":"name","properties":{"name":"EPSG:27700"}}},"appeal_start_date":null,"decision_process":"Delegated","ward":"Hackney Wick Ward","street_name":"Wick Road","secondary_street_name":null,"last_synced":"2026-06-29T02:14:10.890Z","lpa_name":"Hackney","reference_no_of_permission_being_relied_on":null,"cil_liability":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.035431,51.545281],[-0.035362,51.545263],[-0.035263,51.54543],[-0.035323,51.545443],[-0.035431,51.545281]]]},"uprn":10008351937,"application_type":"All Other","centroid":{"lat":51.545338,"lon":-0.035365},"lapsed_date":"15/05/2029","application_type_full":"Full planning permission","centroid_easting":536330,"actual_completion_date":null}