{"actual_commencement_date":null,"date_building_work_completed_under_previous_permission":null,"lpa_name":"Hackney","subdivision_of_building":null,"appeal_decision":null,"lapsed_date":"30/06/2029","appeal_decision_date":null,"last_updated_by":"Portal","reference_no_of_permission_being_relied_on":null,"epc_number":null,"last_updated":"2026-07-07T13:36:48.162Z","url_planning_app":"https://developmentandhousing.hackney.gov.uk//planning/index.html?fa=getApplication&id=84686","street_name":"Guildhall,","parking_details":null,"ward":"City of London (N)","bo_system":"Portal","site_name":"City Of London","site_number":null,"application_details":{},"uprn":null,"locality":"London","date_building_work_started_under_previous_permission":null,"postcode":"EC2P 2EJ","valid_date":"24/02/2026","cil_liability":null,"actual_completion_date":null,"centroid":{"lat":49.766807,"lon":-7.55716},"centroid_easting":null,"application_type_full":null,"pp_id":null,"lpa_app_no":"2026/0411","polygon":null,"id":"Hackney-2026_0411","appeal_status":null,"appeal_start_date":null,"description":"Notification from the City of London of application&nbsp;25/00829/FULEIA for a phased development (phase 1: demolition, phase 2 construction) comprising: the demolition of the existing buildings, partial retention of the existing basement (including creation of a mezzanine) and construction of a new building for office use (Class E(g)), flexible office/community use (Class E(g)/F2), flexible cultural/event uses (Sui Generis) and flexible retail/service/food and beverage uses (Class E(a)-(c)); comprising a basement level, ground and 20 upper storeys plus roof plant level; creation of new public space and new pedestrian routes at ground level; hard and soft landscaping; pedestrian and vehicle access; blue badge car and cycle parking; ancillary servicing, plant and other back of house space; excavation to accommodate attenuation tank beneath existing basement slab, external alterations and demolition to the south elevation of the adjoining Porter Tun Room of the former Whitbread Brewery; associated highway works, enabling works and other works associated with the development.","development_type":"Q29","decision_conditions":null,"last_synced":"2026-07-08T02:10:29.617Z","secondary_street_name":null,"title_number":null,"last_date_consultation_comments":null,"decision_process":"Delegated","centroid_northing":null,"borough":"Hackney","decision":"No Objection to Proposal (OBS only)","application_type":"All Other","wgs84_polygon":null,"decision_agency":"Borough","decision_target_date":"17/03/2026","status":"No Objection to Proposal (OBS only)","decision_date":"30/06/2026"}