{"decision_target_date":"08/05/2026","last_updated_by":"Planning Portal ingest","appeal_decision_date":null,"appeal_status":null,"development_type":"Minor all other minor developments","postcode":"E8 3SG","title_number":null,"application_details":{},"decision_date":null,"url_planning_app":"https://developmentandhousing.hackney.gov.uk//planning/index.html?fa=getApplication&id=84881","borough":"Hackney","locality":"HACKNEY","date_building_work_started_under_previous_permission":null,"bo_system":"Portal","parking_details":null,"site_name":null,"epc_number":null,"pp_id":"14762183","subdivision_of_building":null,"status":"Application Under Consideration","description":"Variation of condition 2 (Approved Drawings) attached to planning permission ref 2023/1551 dated 02/04/2025 for the&nbsp;Partial demolition of the existing building and erection of a five-storey building with basement to accommodate retail use at basement and part ground floor level, 2 x one-bedroom flats on the first and second floors, and 1 x three-bedroom flat on the third and fourth floors.&nbsp;The variation would change amend the brick detailing of the side elevation.","decision_conditions":["&lt;p&gt;The development hereby permitted must be begun not later than the expiration of three years beginning with the date of this permission. &lt;/p&gt;&lt;p&gt;REASON: In order to comply with the provisions of the Town and Country Planning Act 1990 (as amended).&lt;/p&gt;","&lt;p&gt;Full details, with physical samples, of the materials to be used on the external surfaces of the buildings, boundary walls and ground surfaces shall be submitted to and approved by the Local Planning Authority in writing before the relevant work on the site is commenced. The development shall not be carried out otherwise than in accordance with the details thus approved.&lt;/p&gt;&lt;p&gt;REASON: In the interests of the conservation area.&lt;/p&gt;","&lt;p&gt;The development shall not be carried out otherwise than in accordance with the details approved pursuant to 2026/0747 and shall be fully implemented before the premises are first occupied.&lt;/p&gt;&lt;p&gt;REASON: In the interests of flooding.&lt;/p&gt;","&lt;p&gt;Prior to the first occupation of the development hereby approved a minimum of two Swift nesting bricks and/or boxes shall be provided at or close to eaves level of the development hereby approved. The bricks/boxes shall be retained thereafter in perpetuity.&amp;nbsp;&lt;/p&gt;&lt;p&gt;REASON: In the interests of biodiversity.&lt;/p&gt;","&lt;p&gt;Other than demolition works, prior to commencing the works until a report (including intrusive investigation/trial pit and monitoring where necessary) demonstrating that the basement development and lightwell will not increase the potential for groundwater flooding to itself or to the surrounding area has been submitted to the Local Planning Authority for approval. Details of appropriate controls including flood resilience and/or resistance measures against surface water (overland flow) and groundwater (if identified) shall be submitted to the LPA for approval and the approved measures incorporated before the basement is occupied. The basement shall be constructed and completed in accordance with the approved plans in line with BS 8102:2022 Protection of below ground structures against water ingress - code of practice.&lt;/p&gt;&lt;p&gt;REASON: In the interests of the flooding.&lt;/p&gt;","&lt;p&gt;Prior to commencement of the development hereby approved, a Demolition and Construction Management Plan shall be submitted to, and approved in writing by, the local planning authority. The Plan shall be in accordance with Hackney Council’s Code of Construction Practice and the Mayor of London&#x27;s Control of Dust and Emissions during Construction and Demolition SPG, and other relevant guidance relating to dust and air quality. The development shall be implemented in accordance with details and measures approved in the Plan, covering as a minimum the matters set out below, and shall be maintained throughout the entire demolition and construction period:&amp;nbsp;&lt;/p&gt;&lt;p&gt;i) Demolition and construction method statement, covering all phases of the development, to include a construction dust risk assessment&amp;nbsp;&lt;/p&gt;&lt;p&gt;ii) Construction waste management plan setting out how resources will be managed and waste controlled at all stages of the project, including, details of dust mitigation measures to deal with construction waste during site clearance, demolition and construction works (including any breaking or crushing of concrete), and details of measures to be employed to mitigate noise and vibration demonstrating best practical means&amp;nbsp;&lt;/p&gt;&lt;p&gt;iii) An air quality and dust management plan, to include details of measures to control and mitigate emissions of dust from site clearance, demolition and construction activity, relevant to a &#x27;medium&#x27; risk construction site.&lt;/p&gt;&lt;p&gt;iv) Details of locations where deliveries will be undertaken, the size and number of vehicles expected to access the site per day, access arrangement (including turning arrangements if necessary), details of parking suspensions (if required) and the duration of works.&amp;nbsp;&lt;/p&gt;&lt;p&gt;Reason: To protect air quality and human health by minimising emissions during construction, to minimise nuisance caused by dust, noise and vibration, to avoid hazard and obstruction being caused to users of the public highway and in the interest of public safety and amenity.&lt;/p&gt;","&lt;span id=&quot;docs-internal-guid-68fc0317-7fff-883d-0b58-7dd94a950e70&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.2; margin-top: 6pt; margin-bottom: 6pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;Prior to commencement of the development hereby approved, an Air Quality Assessment shall be submitted to, and approved in writing by, the Local Planning Authority. All mitigation measures recommended in the Air Quality Assessment shall be implemented in full and maintained thereafter, unless agreed in writing by the Local Planning Authority.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.2; margin-top: 6pt; margin-bottom: 6pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;Reason: To ensure suitable air quality conditions for the protection of health of future occupiers and to protect the air quality of the surrounding area.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;div&gt;&lt;span style=&quot;font-size: 10pt; font-family: Arial, sans-serif; background-color: transparent; font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline; white-space-collapse: preserve;&quot;&gt;&lt;br&gt;&lt;/span&gt;&lt;/div&gt;&lt;/span&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.2; margin-top: 6pt; margin-bottom: 6pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;Prior to commencing the works, a scheme including the following components to address the risks associated with site contamination shall be submitted to, and approved in writing by, the Local Planning Authority. The development must thereafter be implemented in accordance with the approved details:&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.2; margin-top: 6pt; margin-bottom: 6pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;a) A preliminary risk assessment which identifies all previous uses, potential contaminants associated with those uses (including asbestos, landfill gas, vapours and ground water contaminants); a conceptual model of the site indicating sources, pathways and receptors; and potentially unacceptable risks arising from contamination at the site;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.2; margin-top: 6pt; margin-bottom: 6pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;b) A generic and detailed quantitative risk assessment based on (a) that identifies the risk to all receptors potentially affected, including those off site;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.2; margin-top: 6pt; margin-bottom: 6pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;c) In the event that remediation measures are deemed necessary following the results of (b), an options appraisal identifying feasible remediation options, detailing evaluation of options, and selecting the most appropriate remediation option(s);&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.2; margin-top: 6pt; margin-bottom: 6pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;d) A remediation strategy focused on the remediation option(s) selected in (c) setting site specific monitoring objectives and criteria, providing details of monitoring and maintenance, and containing full details of the remediation measures required, and how they are to be undertaken.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.2; margin-top: 6pt; margin-bottom: 6pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;e) A verification plan explaining how the effectiveness of the remediation works set out in (d) will be measured, and how data will be collected and assessed to demonstrate that the remediation objectives and criteria will be met.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.2; margin-top: 6pt; margin-bottom: 6pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;f) A verification report demonstrating that remediation objectives and criteria identified in (e) have been met, assessing the remediation performance, and creating a final record of the land quality whilst providing a plan for long term monitoring and maintenance (if required).&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.2; margin-top: 6pt; margin-bottom: 6pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;Any investigation and risk assessment must be undertaken in strict accordance with the requirements of the Environment Agency’s Land Contamination Risk Management (LCRM).&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.2; margin-top: 6pt; margin-bottom: 6pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;If additional significant contamination is found at any time when carrying out the approved development, it must immediately be reported in writing to the LPA.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.2; margin-top: 6pt; margin-bottom: 6pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;For the avoidance of doubt, this condition can be discharged on a section by section basis.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-c56c1526-7fff-6ce8-a718-ad7228bcc6bc&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height: 1.2; margin-top: 6pt; margin-bottom: 6pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;REASON: In the interests of protecting persons from&amp;nbsp; harm due to contaminated land risks.&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;The Development hereby permitted shall only be carried out and completed strictly in accordance with the submitted plans hereby approved and any subsequent approval of details. Approved documents are as follows:&lt;/p&gt;&lt;p&gt;2023/1551&lt;/p&gt;&lt;p&gt;Design Access Statement; Daylight, Sunlight and Overshadowing Assessment; Energy Statement; 854MS-A(03)001; 854MS-A(03)200 Rev 04; 854MS-A(03)201 Rev 04; 854MS-A(05)100 Rev 04; 854MS-A(05)200 Rev 04; 854MS-A(05)201 Rev 04; 854MS-EX(03)100 Rev 02; 854MS-EX(03)200 Rev 03; 854MS-EX(03)201 Rev 03; 854MS-EX(05)100 Rev 02; 854MS-EX(05)101 Rev 02; 854MS-EX(05)200 Rev 02; 854MS-EX(05)201 Rev 02;&amp;nbsp;&lt;/p&gt;&lt;p&gt;2026/0547&lt;/p&gt;&lt;p&gt;Planning Statement (Dated 11 March 2026); 854MS-A(03)100 Rev 06; 854MS-A(05)101 Rev 06; 854MS-A(03)200 Rev 08; 854MS-A(03)201 Rev 08; 854MS-A(05)200 Rev 06; 854MS-A(05)300 Rev 02; 854MS-A(05)301 Rev 03.&amp;nbsp;&lt;/p&gt;&lt;p&gt;REASON: To ensure that the development hereby permitted is carried out in full accordance with the plans hereby approved.&lt;/p&gt;"],"site_number":"82","last_updated":"2026-07-08T01:56:54.920Z","last_date_consultation_comments":"16/04/2026","valid_date":"13/03/2026","actual_commencement_date":null,"centroid_northing":183937,"appeal_decision":null,"decision_agency":"Borough","lpa_app_no":"2026/0547","date_building_work_completed_under_previous_permission":null,"decision":null,"id":"Hackney-2026_0547","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[534872.24853793,183937.551500389],[534872.603075339,183940.200742145],[534870.022371286,183940.050785286],[534857.20130167,183939.300999693],[534857.151831027,183934.90225898],[534865.82563526,183934.802287517],[534865.850370561,183934.802287342],[534871.902245195,183935.052215782],[534872.24853793,183937.551500389]]],"type":"Polygon"},{"coordinates":[[[534872.24853793,183937.551500389],[534872.603075339,183940.200742145],[534870.022371286,183940.050785286],[534857.20130167,183939.300999693],[534857.151831027,183934.90225898],[534865.82563526,183934.802287517],[534865.850370561,183934.802287342],[534871.902245195,183935.052215782],[534872.24853793,183937.551500389]]],"type":"Polygon"}],"crs":{"type":"name","properties":{"name":"EPSG:27700"}}},"appeal_start_date":null,"decision_process":"Delegated","ward":"Victoria Ward","street_name":"MARE STREET","secondary_street_name":null,"last_synced":"2026-07-08T02:13:59.725Z","lpa_name":"Hackney","reference_no_of_permission_being_relied_on":null,"cil_liability":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.056692,51.538234],[-0.056685,51.538258],[-0.056723,51.538257],[-0.056908,51.538253],[-0.05691,51.538214],[-0.056785,51.538211],[-0.056785,51.538211],[-0.056697,51.538212],[-0.056692,51.538234]]]},"uprn":"100023016510","application_type":"All Other","centroid":{"lat":51.538231,"lon":-0.056796},"lapsed_date":null,"application_type_full":"Removal/Variation of a condition","centroid_easting":534865,"actual_completion_date":null}