{"decision_target_date":"21/05/2026","last_updated_by":"Planning Portal ingest","appeal_decision_date":null,"appeal_status":null,"development_type":"Minor all other minor developments","postcode":"N1 3JF","title_number":null,"application_details":{"site_area":0.07,"other_residential_accommodation_details":{"site_area":0.07},"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Phase 1 ","intended_completion_date":"09/2026","intended_commencement_date":"05/2026"}],"total_gia_gained":165,"total_gia_lost":0,"total_gia_existing":0,"existing_proposed_floorspace_details":[{"gia_existing":0,"gia_gained":139.3,"use_class":"B8","gia_lost":0},{"gia_existing":0,"gia_gained":25.7,"use_class":"EG3","gia_lost":0}],"projected_cost_of_works":"Up to £2m","occupation_status":"Vacant","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":139.3,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":165,"total_gia_lost":0,"total_gia_existing":0},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"urban_greening_factor_score":0,"solar_pv_capacity":0.07,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":true},"internal_resi_water_usage":0,"ownership_status":"Private"},"decision_date":"09/06/2026","url_planning_app":"https://developmentandhousing.hackney.gov.uk//planning/index.html?fa=getApplication&id=84967","borough":"Hackney","locality":"London","date_building_work_started_under_previous_permission":null,"bo_system":"Portal","parking_details":{"no_proposed_cycle":2,"net_cycle":2,"no_existing_cycle":0},"site_name":"Land to the rear of 58-64 Southgate Road","epc_number":null,"pp_id":"14676389","subdivision_of_building":null,"status":"Approved","description":"Placing of storage containers and staff welfare facilities on the site for a temporary period of five years, with associated works and installation of replacement entrance gates.","decision_conditions":["&lt;p&gt;A Construction Management Plan (CMP) specifying hours of working, construction traffic routing, measures to prevent dust pollution and contact arrangements between residents and contractors shall be submitted and agreed by the local planning authority. Prior to the commencement of the development. The CMP shall include the following details:&amp;nbsp;&lt;br&gt;&lt;br&gt;(a) loading and unloading of plant and materials;&amp;nbsp;&lt;br&gt;(b) storage of plant and materials;&amp;nbsp;&lt;br&gt;(c) programme of works (including measures for traffic management);&amp;nbsp;&lt;br&gt;(d) provision of boundary hoarding behind any visibility zones;&amp;nbsp;&lt;br&gt;(e) wheel cleaning provision on site. Construction shall thereafter take place in accordance with the measures identified within the CMP.&amp;nbsp;&lt;br&gt;&lt;br&gt;REASON: To ensure that during demolition and construction works that there would be no negative amenity or highway impacts as a result of the development. These details are required prior to commencement as they affect the entirety of the construction phase and cannot, therefore, be dealt with retrospectively.&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.3800000000000001;text-align: justify;margin-top:10pt;margin-bottom:10pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Prior to the commencement of the relevant works, a policy-compliant Cycle Parking Plan, which shows details of layout, foundation, stand type and spacing of  cycle parking spaces, shall be submitted to and approved in writing by the local planning authority.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-2ecc66ab-7fff-348f-4edd-82666b61b8ff&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.3800000000000001;text-align: justify;margin-top:10pt;margin-bottom:10pt;&quot;&gt;&lt;span style=&quot;font-size:11pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: To ensure that adequate provision for the safe and secure storage of bicycles is made for future occupiers and in the interest of safeguarding highway safety.&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;&lt;span data-sheets-root=&quot;1&quot; style=&quot;&quot;&gt;Prior to occupation of the development hereby approved, precise details of cycle parking shall be submitted to and agreed in writing by the local planning authority. The development shall, thereafter, be carried out in strict accordance with the approved details. The area for cycle parking shall be kept clear of obstruction other than for its intended purpose.&lt;br&gt;&lt;br&gt;REASON: To promote sustainable transport.&lt;/span&gt;&lt;/p&gt;","&lt;div style=&quot;&quot;&gt;Prior to the occupation of the development hereby approved, details must be submitted to and approved by the local planning authority to demonstrate that at least the consented standards have been met, as set out in the hereby approved Energy Strategy (Revision 02 by AJ Consultants Limited, dated February 2026):&lt;br&gt;&lt;br&gt;a) Solar PV panels annual electricity peak generation of 2.7 kWp&lt;/div&gt;&lt;div style=&quot;&quot;&gt;&lt;br&gt;&lt;/div&gt;&lt;div style=&quot;&quot;&gt;REASON: In the interest of addressing climate change and securing sustainable and net zero development and construction.&amp;nbsp;&lt;/div&gt;","&lt;p&gt;&lt;span id=&quot;docs-internal-guid-f164d930-7fff-d83d-b602-bcdc36f4acc8&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;Prior to the occupation of the development, a Delivery and Servicing Plan shall be submitted to and approved by the local planning authority, setting out: &lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-f164d930-7fff-d83d-b602-bcdc36f4acc8&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;- Frequency of deliveries per day/week;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-f164d930-7fff-d83d-b602-bcdc36f4acc8&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;- Size of vehicles; and&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-f164d930-7fff-d83d-b602-bcdc36f4acc8&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;- How vehicles would be accommodated on the public highway.&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-f164d930-7fff-d83d-b602-bcdc36f4acc8&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;Thereafter, deliveries and servicing shall be carried out in accordance with the approved plan. &lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-f164d930-7fff-d83d-b602-bcdc36f4acc8&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;REASON: To ensure that the proposed development does not prejudice the free flow of traffic or public safety along the neighbouring highway(s).&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","&lt;div style=&quot;&quot;&gt;Prior to the occupation of the development hereby approved, details must be submitted to and approved by the Local Authority to demonstrate that at least the consented standards have been met, as set out in the hereby approved Energy Strategy (Revision 02 by AJ Consultants Limited, dated February 2026):&lt;/div&gt;&lt;div style=&quot;&quot;&gt;&lt;br&gt;a) Minimum Heat pump Seasonal Energy Efficiency Ratio of 7&lt;br&gt;b) Minimum Heat pump Seasonal Coefficient of Performance of 4.5&lt;br&gt;c) Details of the location of the condenser units from the heat pump systems and any noise solutions to mitigate the impact for nearby sensitive receptors.&lt;/div&gt;&lt;div style=&quot;&quot;&gt;&lt;br&gt;&lt;/div&gt;&lt;div style=&quot;&quot;&gt;REASON: In the interest of addressing climate change and securing sustainable and net-zero development and construction.&lt;/div&gt;","&lt;p&gt;&lt;span data-sheets-root=&quot;1&quot; style=&quot;&quot;&gt;Full details of the proposed entrance gate, including its detailed design, materials and dimensions, shall be submitted to and approved by the local planning authority, in writing, before the relevant part of the work commences. The development shall not be carried out otherwise than in accordance with the details thus approved.&lt;br&gt;&lt;br&gt;REASON: To preserve or enhance the character and appearance of the conservation area.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;&lt;span id=&quot;docs-internal-guid-f45090da-7fff-e31a-3f0d-e9d0a98a7352&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;The operational hours for the site shall be Monday to Friday, 0800-1900 hours.; Saturdays, 0900–1900 hours; and Sundays and Bank Holidays, 10.00-1700 hours.&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-f45090da-7fff-e31a-3f0d-e9d0a98a7352&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;REASON: To protect neighbouring residential amenities from noise and disturbance.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;margin-top: 0pt; margin-bottom: 0pt; line-height: 1.2;&quot;&gt;The use hereby permitted shall be for a limited period of five years from the date of the implementation of the development, after which period the use shall be discontinued, and the land restored to its former condition.&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;margin-top: 0pt; margin-bottom: 0pt; line-height: 1.2;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; vertical-align: baseline;&quot;&gt;&lt;br&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;margin-top: 0pt; margin-bottom: 0pt; line-height: 1.2;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; vertical-align: baseline;&quot;&gt;REASON: In order that the local planning authority can review any change in circumstances after this period and to avoid the accumulation of unimplemented permissions.&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;The noise level from all plant and machinery included in the approved development shall at all times remain 5dB(A) below background levels when measured at any nearby residential window or other sensitive receptor, if appropriate.&amp;nbsp;&lt;/p&gt;&lt;p&gt;\r\nREASON: To ensure that occupiers of neighbouring premises do not suffer a loss of amenity by reason of noise nuisance and other excess noise.\r\n&lt;/p&gt;","<p>The development hereby permitted must be begun not later than the expiration of three years beginning with the date of this permission.</p><p><br></p><p>\r\n</p><p>\r\nREASON: In order to comply with the provisions of the Town and Country Planning Act 1990 (as amended).</p><p>\r\n</p>","&lt;p&gt;The development hereby permitted shall only be carried out and completed strictly in accordance with the submitted plans hereby approved and any subsequent approval of details.\r\n&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;\r\nREASON: To ensure that the development hereby permitted is carried out in full accordance with the plans hereby approved.\r\n&lt;/p&gt;","&lt;div style=&quot;&quot;&gt;Prior to the occupation of the development hereby approved, details and full specifications of 3 swift bricks/boxes shall be submitted to and approved in writing by the local planning authority. The details shall include a minimum of 3 swift bricks (same requirements for swift box) incorporated into the design of the development. They should be installed in groups of at least 2, and placed at or close to eaves level of the development hereby approved. They should be placed at least 5m above the ground with a 5m unobstructed flight path, both below and in front of the swift brick. The swift brick should be located facing north, east, or north east (direct sunlight should be avoided) and should not be placed immediately above doors or windows. Where possible, swift bricks should be set flush into the external wall to match adjacent brickwork.&lt;/div&gt;&lt;div style=&quot;&quot;&gt;&lt;br&gt;&lt;/div&gt;&lt;div style=&quot;&quot;&gt;Within a month of the first occupation of the development, evidence must be submitted to and approved by the local planning authority that swift bricks/boxes have been installed in line with the approved details unless otherwise agreed in writing.&amp;nbsp;&amp;nbsp;The details hereby approved shall be delivered, in full, prior to the first occupation of the development and shall be maintained for the lifespan of the development.&amp;nbsp;&lt;/div&gt;&lt;div style=&quot;&quot;&gt;&lt;br&gt;&lt;/div&gt;&lt;div style=&quot;&quot;&gt;REASON:&amp;nbsp;To support swift populations in Hackney and preserve endangered urban biodiversity, by providing nesting opportunities.&lt;/div&gt;","&lt;div style=&quot;&quot;&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom: 0px;&quot;&gt;Prior to commencement of works, full details and specifications of the green roofs shall be submitted to and approved in writing by the local planning authority. The submission shall include the following:&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom: 0px;&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;/div&gt;&lt;div style=&quot;&quot;&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom: 0px; margin-left: 47.25pt;&quot;&gt;·&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-variant-emoji: normal; font-stretch: normal; line-height: normal;&quot;&gt;&amp;nbsp;&lt;/span&gt;Detailed drawings of a roof plan identifying where the green roofs will be located and the measurement of their coverage; this should include other structures on the roof, including the&amp;nbsp; location of PV panels, roof lights and access points where applicable, and their relationship with the green roof;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom: 0px; margin-left: 47.25pt;&quot;&gt;·&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-variant-emoji: normal; font-stretch: normal; line-height: normal;&quot;&gt;&amp;nbsp;&lt;/span&gt;The design of the green roof should be in line with GRO’s code of best practice;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom: 0px; margin-left: 47.25pt;&quot;&gt;·&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-variant-emoji: normal; font-stretch: normal; line-height: normal;&quot;&gt;&amp;nbsp;&lt;/span&gt;Section drawings demonstrating a minimum substrate depth of 100mm;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom: 0px; margin-left: 47.25pt;&quot;&gt;·&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-variant-emoji: normal; font-stretch: normal; line-height: normal;&quot;&gt;&amp;nbsp;&lt;/span&gt;Details of the proposed type of invertebrate habitat with a minimum of one feature per 30m2; which could include areas of bare, unplanted substrates, log piles, boulder or stone piles, sand piles or containers;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom: 0px; margin-left: 47.25pt;&quot;&gt;·&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-variant-emoji: normal; font-stretch: normal; line-height: normal;&quot;&gt;&amp;nbsp;&lt;/span&gt;Details of the drainage system for the roof;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom: 0px; margin-left: 47.25pt;&quot;&gt;·&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-variant-emoji: normal; font-stretch: normal; line-height: normal;&quot;&gt;&amp;nbsp;&lt;/span&gt;Details of the planting mix, including a minimum of 16+ species;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom: 0px; margin-left: 47.25pt;&quot;&gt;·&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-variant-emoji: normal; font-stretch: normal; line-height: normal;&quot;&gt;&amp;nbsp;&lt;/span&gt;All roofs to be sown with a wide mix of native and non native species, which provide amenity and biodiversity value at varying times of the year, and the roof should not rely solely on one species;&amp;nbsp;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom: 0px; margin-left: 47.25pt;&quot;&gt;·&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-variant-emoji: normal; font-stretch: normal; line-height: normal;&quot;&gt;&amp;nbsp;&lt;/span&gt;Management and maintenance plan, including access arrangements, irrigation, and general maintenance actions.&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom: 0px;&quot;&gt;Within a month of the first occupation of the development, evidence must be submitted to and approved by the local planning authority that the green roof(s) have been delivered in line with the approved details unless otherwise agreed in writing. The green roof(s) shall be retained thereafter for the lifetime of the development in accordance with the approved Management and Maintenance Plan.&amp;nbsp;&lt;span style=&quot;background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;&quot;&gt;Once the development term expires, the green roof must be removed outside the bird nesting period (1 March to 31 August).&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;/div&gt;&lt;div style=&quot;&quot;&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom: 0px;&quot;&gt;&amp;nbsp;&lt;/p&gt;&lt;/div&gt;&lt;div style=&quot;&quot;&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom: 0px;&quot;&gt;REASON:&amp;nbsp;To promote biodiversity on site through green roofs.&amp;nbsp;&lt;/p&gt;&lt;/div&gt;"],"site_number":null,"last_updated":"2026-06-28T11:20:49.299Z","last_date_consultation_comments":"25/04/2026","valid_date":"26/03/2026","actual_commencement_date":null,"centroid_northing":184082,"appeal_decision":null,"decision_agency":"Borough","lpa_app_no":"2026/0658","date_building_work_completed_under_previous_permission":null,"decision":"Approved","id":"Hackney-2026_0658","polygon":{"type":"GeometryCollection","geometries":[{"coordinates":[[[532896.471,184095.653],[532896.426,184095.663],[532895.02,184095.969],[532893.25,184090.45],[532888.9,184091.3],[532888.5,184091.35],[532880.4,184093.1],[532879.65,184089.6],[532887.346,184088.042],[532886.789,184085.384],[532887.7,184085.199],[532892.35,184084.25],[532891.03,184078.33],[532890.083,184073.519],[532889.886,184072.517],[532901.478,184070.248],[532900.74,184066.871],[532904.5,184066.1],[532906.1,184065.8],[532907.1,184070.3],[532907.75,184070.25],[532909.95,184080.45],[532910.55,184083.25],[532911.7,184088.55],[532912.5,184092.35],[532909.75,184092.87],[532908.25,184093.15],[532906.55,184093.45],[532905.621,184093.652],[532899.51,184094.989],[532896.471,184095.653]]],"type":"Polygon"}],"crs":{"type":"name","properties":{"name":"EPSG:27700"}}},"appeal_start_date":null,"decision_process":"Delegated","ward":"De Beauvoir Ward","street_name":"Southgate Road","secondary_street_name":null,"last_synced":"2026-06-29T01:48:54.962Z","lpa_name":"Hackney","reference_no_of_permission_being_relied_on":null,"cil_liability":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.085103,51.540123],[-0.085104,51.540123],[-0.085124,51.540126],[-0.085151,51.540077],[-0.085214,51.540086],[-0.08522,51.540086],[-0.085336,51.540104],[-0.085348,51.540073],[-0.085237,51.540057],[-0.085246,51.540033],[-0.085233,51.540031],[-0.085167,51.540022],[-0.085188,51.539969],[-0.085203,51.539926],[-0.085207,51.539917],[-0.08504,51.539894],[-0.085052,51.539863],[-0.084998,51.539856],[-0.084976,51.539852],[-0.084959,51.539893],[-0.08495,51.539892],[-0.084915,51.539983],[-0.084905,51.540008],[-0.084886,51.540056],[-0.084873,51.54009],[-0.084913,51.540095],[-0.084934,51.540098],[-0.084959,51.540101],[-0.084972,51.540103],[-0.08506,51.540116],[-0.085103,51.540123]]]},"uprn":null,"application_type":"All Other","centroid":{"lat":51.539999,"lon":-0.085029},"lapsed_date":"09/06/2029","application_type_full":"Full planning permission","centroid_easting":532902,"actual_completion_date":null}