{"decision_target_date":"26/05/2026","last_updated_by":"Planning Portal ingest","appeal_decision_date":null,"appeal_status":null,"development_type":"Other house holder developments","postcode":"N1 4HS","title_number":["Unregistered"],"application_details":{"total_gia_gained":23,"no_additional_bathrooms":2,"no_additional_bedrooms":2,"intended_completion_date":"10/2026","intended_commencement_date":"05/2026"},"decision_date":"07/08/2026","url_planning_app":"https://developmentandhousing.hackney.gov.uk//planning/index.html?fa=getApplication&id=85052","borough":"Hackney","locality":"HACKNEY","date_building_work_started_under_previous_permission":null,"bo_system":"Portal","parking_details":null,"site_name":null,"epc_number":null,"pp_id":"14776864","subdivision_of_building":null,"status":"Approved","description":"The erection of a part single part three storey rear extension with new ground floor side windows. Alteration to the existing first floor roof terrace. The replacement of the existing front stairs and boundary wall.&nbsp; Replacement of all existing single glazed windows with new matching double glazed windows. ","decision_conditions":["&lt;p&gt;The roof of the extension hereby approved shall not be used as a terrace, balcony or similar amenity area.&lt;/p&gt;&lt;p&gt;\r\nREASON: In the interests of neighbours amenity\r\n&lt;/p&gt;","<p>The Development hereby permitted must be begun not later than the expiration of three years beginning with the date of this consent.</p><p><br></p><p>\r\nREASON: In order to comply with the provisions of Section 18(a) of the Planning (Listed Buildings and Conservation Areas) Act 1990 as amended.\r\n</p>","Prior to superstructure works, detailed specification, a drainage layout and a management &amp;\r\nmaintenance plan (where applicable) of at least one suitable sustainable drainage system (i.e.\r\nwater butt with overflow, raingarden, bioretention planter box, living roof (substrate depth of 80-\r\n150mm excluding the vegetative mat), permeable paving etc.) shall be submitted to, and\r\napproved by the LPA, in consultation with the LLFA. If soakaways i.e. plastic modules and\r\nsoakaway rings are used, an infiltration test must be carried out to ensure that the capacity of the\r\nsoil is suitable for infiltration. It must be demonstrated that there will be no increase in surface\r\nwater flow being discharged offsite and an overall reduction in peak flow rate and volume.Reason: To mitigate against the impacts of surface water flooding.","Prior to occupation, at least one bird/bat box shall be provided close to the eaves and shall be retained thereafter.&nbsp;REASON: To support bird and bat populations, including swifts, in Hackney and preserve endangered urban biodiversity, by providing nesting opportunities, in accordance with Hackney’s Local Plan LP33 policy LP47 which states that all development schemes involving buildings with an eaves height or roof commencement height of 5 metres and above are required to provide nesting boxes for swifts, sparrows, starlings, and/or bats as appropriate.","<p>The Development hereby permitted shall only be carried out and completed strictly in accordance with the submitted plans hereby approved and any subsequent approval of details.\r\n</p><p><br></p><p>\r\nREASON: To ensure that the development hereby permitted is carried out in full accordance with the plans hereby approved.\r\n</p>","Full details, including samples (can be images), of the materials to be used on the external surfaces of the building, including glazing, shall be submitted to and approved by the local planning authority in writing before any work on the site is commenced. The development shall not be carried out otherwise than in accordance with the details thus approved.REASON: To ensure that the external appearance of the building is satisfactory and does not detract from the character and visual amenity of the area.","&lt;p&gt;Detailed drawings/full particulars of the proposed development showing the matters set out below must be submitted to and approved by the Local Planning Authority, in writing, before any work is commenced. The development shall not be carried out otherwise than in accordance with the details thus approved which shall be implemented in full prior to the first occupation/use of the development and retained in perpetuity (if necessary).&amp;nbsp;&lt;/p&gt;&lt;p&gt;\r\na) Replacement windows including glazing units with a profile slimline profile with integrated glazing bars and a putty finish and correct horn details and must not contain visible trickle vents or metallic/perforated spacer bars.&lt;/p&gt;&lt;p&gt;\r\nREASON: To ensure that the proposal does not detract from the character and appearance of the conservation area.\r\n&lt;/p&gt;","Prior to commencing the works, for each section of the development or stage in the development - as may be\r\nagreed in writing by the Local Planning Authority (LPA) - a scheme including the following components to\r\naddress the risks associated with site contamination shall be submitted to, and approved in writing by, the LPA.\r\na) A preliminary risk assessment which identifies all previous uses, potential contaminants associated with\r\nthose uses (including asbestos, landfill gas, vapours and ground water contaminants); a conceptual model of\r\nthe site indicating sources, pathways and receptors; and potentially unacceptable risks arising from\r\ncontamination at the site;\r\nb) A generic or detailed quantitative risk assessment based on (a) that identifies the risk to all receptors\r\npotentially affected, including those off site;\r\nc) In the event that remediation measures are deemed necessary following the results of (b), an options\r\nappraisal identifying feasible remediation options, detailing evaluation of options, and selecting the most\r\nappropriate remediation option(s);\r\nd) A remediation strategy focused on the remediation option(s) selected in (c) setting site specific monitoring\r\nobjectives and criteria, providing details of monitoring and maintenance, and containing full details of the\r\nremediation measures required, and how they are to be undertaken.\r\ne) A verification plan explaining how the effectiveness of the remediation works set out in (d) will be measured,\r\nand how data will be collected and assessed to demonstrate that the remediation objectives and criteria will be\r\nmet.\r\nf) A verification report demonstrating that remediation objectives and criteria identified in (e) have been met,\r\nassessing the remediation performance, and creating a final record of the land quality whilst providing a plan for\r\nlong term monitoring and maintenance (if required).\r\nAny investigation and risk assessment must be undertaken in strict accordance with the requirements of the\r\nEnvironment Agency’s Land Contamination Risk Management (LCRM).\r\nIf additional significant contamination is found at any time when carrying out the approved development, it must\r\nimmediately be reported in writing to the LPA.\r\nFor the avoidance of doubt, this condition can be discharged on a section by section basis.\r\nReason:\r\nTo protect human health and the environment by ensuring no harm is caused by land contamination, in line with\r\nparagraphs H, I and J, LP 58 of the Hackney Local Plan 2033 and the Hackney contaminated land strategy\r\n2022/2030."],"site_number":"27","last_updated":"2026-08-27T01:20:43.117Z","last_date_consultation_comments":"08/05/2026","valid_date":"31/03/2026","actual_commencement_date":null,"centroid_northing":184537,"appeal_decision":null,"decision_agency":"Borough","lpa_app_no":"2026/0703","date_building_work_completed_under_previous_permission":null,"decision":"Approved","id":"Hackney-2026_0703","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[533036.403234127,184531.001627018],[533039.272515489,184532.591171656],[533047.097078213,184536.949924067],[533047.402145168,184537.099881026],[533052.547063366,184540.099022607],[533048.704864943,184546.80710264],[533040.938017298,184542.528327433],[533040.896791965,184542.508333297],[533031.703549005,184537.299824373],[533032.453849812,184535.950210196],[533031.101659406,184535.190428059],[533018.148668945,184527.902514143],[533019.09685096,184526.153015052],[533018.148668701,184520.75455984],[533036.403234127,184531.001627018]]],"type":"Polygon"},{"coordinates":[[[533036.403234127,184531.001627018],[533039.272515489,184532.591171656],[533047.097078213,184536.949924067],[533047.402145168,184537.099881026],[533052.547063366,184540.099022607],[533048.704864943,184546.80710264],[533040.938017298,184542.528327433],[533040.896791965,184542.508333297],[533031.703549005,184537.299824373],[533032.453849812,184535.950210196],[533031.101659406,184535.190428059],[533018.148668945,184527.902514143],[533019.09685096,184526.153015052],[533018.148668701,184520.75455984],[533036.403234127,184531.001627018]]],"type":"Polygon"}],"crs":{"type":"name","properties":{"name":"EPSG:27700"}}},"appeal_start_date":null,"decision_process":"Delegated","ward":"De Beauvoir Ward","street_name":"ARDLEIGH ROAD","secondary_street_name":null,"last_synced":"2026-08-27T02:54:14.296Z","lpa_name":"Hackney","reference_no_of_permission_being_relied_on":null,"cil_liability":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.082922,51.544002],[-0.08288,51.544016],[-0.082766,51.544053],[-0.082761,51.544054],[-0.082686,51.54408],[-0.082739,51.544141],[-0.082852,51.544105],[-0.082853,51.544105],[-0.082987,51.54406],[-0.082977,51.544048],[-0.082997,51.544041],[-0.083186,51.543979],[-0.083173,51.543963],[-0.083189,51.543914],[-0.082922,51.544002]]]},"uprn":"100021024494","application_type":"Householder","centroid":{"lat":51.544055,"lon":-0.082868},"lapsed_date":"07/08/2029","application_type_full":"Householder planning & demolition in a conservation area","centroid_easting":533040,"actual_completion_date":null}