{"actual_completion_date":null,"appeal_start_date":null,"application_type_full":"Full planning permission","decision_conditions":null,"decision":null,"appeal_decision":null,"valid_date":"22/05/2026","description":"The proposed scheme supports the installation of new elevated pipework/gantry between the two apartment blocks, 2.2m above ground level to support in the heating upgrade of the apartment blocks. ","status":"Application Under Consideration","last_updated_by":"Portal","site_number":null,"cil_liability":null,"decision_process":"Delegated","development_type":"Minor all other minor developments","subdivision_of_building":"The area between the two apartment blocks on the ground floor to install a steel gantry/frame 2.2m from the ground fixed above the existing gate. The proposal of creating an aluminium pipe boxing is to carry the new pipework. Internal refurbishments include replacing the existing pipework in the riser and corridor. ","centroid_northing":187774,"last_updated":"2026-08-07T12:45:54.160Z","lapsed_date":null,"bo_system":"Portal","centroid":{"lat":51.573275,"lon":-0.089691},"parking_details":null,"url_planning_app":"https://developmentandhousing.hackney.gov.uk//planning/index.html?fa=getApplication&id=85332","pp_id":"14857984","locality":"HACKNEY","reference_no_of_permission_being_relied_on":null,"uprn":"10008335054","ward":"Woodberry Down Ward","last_synced":"2026-08-08T02:59:34.356Z","application_details":{"other_residential_accommodation_details":{"site_area":2720.8},"site_area":2720.8,"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Phase 1","intended_completion_date":"07/2027","intended_commencement_date":"12/2026"}],"total_gia_gained":0,"total_gia_lost":0,"total_gia_existing":0,"scheme_name":"Heating Upgrade of Rowan and Hornbeam Apartment blocks","projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_lost":0,"total_gia_existing":0},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"urban_greening_factor_score":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":false,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"waste_details":[{"external_dry_recycling":false,"external_food_waste":false,"unit_reference":"N/A","external_residual_waste":false,"reason_for_no_provision":"The proposal does not create any new units. The existing units have their dedicated internal and external storage space. ","internal_residual_waste":false,"internal_food_waste":false,"internal_dry_recycling":false}],"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":0,"ownership_status":"Private","lead_developer_company_name":"Vital Energi Utilities Limited "},"street_name":"SEVEN SISTERS ROAD","decision_agency":"Borough","appeal_decision_date":null,"site_name":"Flat 1, HORNBEAM APARTMENTS","last_date_consultation_comments":"19/06/2026","secondary_street_name":null,"lpa_name":"Hackney","title_number":null,"epc_number":null,"decision_date":null,"wgs84_polygon":{"coordinates":[[[-0.09081,51.573198],[-0.090384,51.572753],[-0.089299,51.573134],[-0.089675,51.573594],[-0.09081,51.573198]]],"type":"Polygon"},"date_building_work_started_under_previous_permission":null,"decision_target_date":"17/07/2026","postcode":"N4 1JU","appeal_status":null,"polygon":{"crs":{"properties":{"name":"EPSG:27700"},"type":"name"},"geometries":[{"coordinates":[[[532404.677314373,187763.385119476],[532435.553311982,187714.683453498],[532509.577529676,187758.940622928],[532482.179144585,187809.464418895],[532404.677314373,187763.385119476]]],"type":"Polygon"}],"type":"geometrycollection"},"centroid_easting":532482,"date_building_work_completed_under_previous_permission":null,"borough":"Hackney","id":"Hackney-2026_0823","application_type":"All Other","lpa_app_no":"2026/0823","actual_commencement_date":null}