{"date_building_work_completed_under_previous_permission":null,"cil_liability":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.066362,51.576639],[-0.066312,51.576534],[-0.066674,51.576474],[-0.066767,51.576463],[-0.066767,51.576568],[-0.066362,51.576639]]]},"postcode":"N16 6TD","ward":"Springfield Ward","appeal_start_date":null,"appeal_decision":null,"valid_date":"16/06/2026","secondary_street_name":null,"centroid_northing":188176,"reference_no_of_permission_being_relied_on":null,"actual_commencement_date":null,"last_updated":"2026-09-02T07:36:12.053Z","description":"Erection of joint ground floor wrap-around extension with a lightwell and insertion of rooflights","subdivision_of_building":null,"epc_number":null,"url_planning_app":"https://developmentandhousing.hackney.gov.uk//planning/index.html?fa=getApplication&id=85525","borough":"Hackney","street_name":"MOUNDFIELD ROAD","decision_process":"Delegated","last_synced":"2026-09-03T02:39:56.234Z","last_updated_by":"Portal","date_building_work_started_under_previous_permission":null,"application_type":"All Other","lapsed_date":"28/08/2029","last_date_consultation_comments":"13/07/2026","title_number":null,"appeal_status":null,"application_type_full":"Full planning permission","development_type":"Minor all other minor developments","decision_target_date":"11/08/2026","lpa_name":"Hackney","uprn":"100021060261","decision_date":"28/08/2026","lpa_app_no":"2026/0950","centroid_easting":534075,"appeal_decision_date":null,"decision_conditions":["<p>The Development hereby permitted shall only be carried out and completed strictly in accordance with the submitted plans hereby approved and any subsequent approval of details.\r\n</p><p><br></p><p>\r\nREASON: To ensure that the development hereby permitted is carried out in full accordance with the plans hereby approved.\r\n</p>","<p>The development hereby permitted must be begun not later than the expiration of three years beginning with the date of this permission.</p><p><br></p><p>\r\n</p><p>\r\nREASON: In order to comply with the provisions of the Town and Country Planning Act 1990 (as amended).</p><p>\r\n</p>","Prior to superstructure works, detailed specification, a drainage layout and a management &amp; maintenance plan (where applicable) of at least one suitable sustainable drainage system (i.e. water butt with overflow, raingarden, bioretention planter box, living roof (substrate depth of 80-150mm excluding the vegetative mat), permeable paving etc.) shall be submitted to, and approved by the LPA, in consultation with the LLFA. If soakaways i.e. plastic modules and soakaway rings are used, an infiltration test must be carried out to ensure that the capacity of the soil is suitable for infiltration. It must be demonstrated that there will be no increase in surface water flow being discharged offsite and an overall reduction in peak flow rate and volume.","&lt;span id=&quot;docs-internal-guid-8752c48f-7fff-c68c-b8b2-69e05833a432&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:10pt;margin-bottom:10pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;Within one month of the first occupation of the development, evidence must be submitted to and approved in writing by the Local Planning Authority to demonstrate that the green roof has been fully installed in accordance with the required design specifications.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:10pt;margin-bottom:10pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;The submission for approval must include the following details alongside the completion evidence:&lt;/span&gt;&lt;/p&gt;&lt;ul style=&quot;margin-bottom: 0px; padding-inline-start: 48px;&quot;&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type: disc; background-color: transparent; font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:10pt;margin-bottom:0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;Cross-section drawings verifying a minimum substrate depth of no less than 80-100mm;&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type: disc; background-color: transparent; font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:0pt;margin-bottom:0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;Details of the installed roof drainage infrastructure;&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type: disc; background-color: transparent; font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:0pt;margin-bottom:0pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;Details of the completed planting mix, incorporating a minimum of 16+ diverse species; and&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;li dir=&quot;ltr&quot; style=&quot;list-style-type: disc; background-color: transparent; font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot; aria-level=&quot;1&quot;&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:0pt;margin-bottom:10pt;&quot; role=&quot;presentation&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;A management and maintenance plan, including defined access arrangements, irrigation provisions, and ongoing seasonal care schedules.&lt;/span&gt;&lt;/p&gt;&lt;/li&gt;&lt;/ul&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:10pt;margin-bottom:10pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;The green roof shall be retained thereafter for the lifetime of the development and managed in strict accordance with the approved management and maintenance details.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:0pt;margin-bottom:0pt;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;Reason: To promote biodiversity on site through green roofs, in line with Hackney&#x27;s Local Plan LP33, policy LP46.&lt;/span&gt;&lt;/p&gt;&lt;div&gt;&lt;span style=&quot;font-size: 11pt; font-family: Arial, sans-serif; background-color: transparent; font-style: italic; font-variant: normal; vertical-align: baseline; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/span&gt;&lt;/div&gt;&lt;/span&gt;","&lt;p&gt;All new external facing and roofing materials in respect of all the works hereby approved (and any other incidental works carried out in this connection) shall match those of the existing building in respect of materials used, detailed execution and finished appearance including type, size, colour, bond, pointing, coursing, jointing, profile and texture, notwithstanding the details of the approved plans.&amp;nbsp;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-e12b7529-7fff-2274-6379-270ba99318f1&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; font-variant-emoji: normal; vertical-align: baseline;&quot;&gt;REASON: To ensure that the external appearance of the building is satisfactory and does not detract from the character and visual amenity of the area.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","The extensions hereby approved at the two properties are to be undertaken as one development and works are not to be substantially completed at either property until such a time as works are commenced at the other property.REASON: To ensure that a partially completed development does not result in an obtrusive and incompatible form of development detrimentally impacting on the character and appearance of the properties."],"site_number":"103","bo_system":"Portal","status":"Approved","site_name":null,"decision":"Approved","polygon":{"crs":{"type":"name","properties":{"name":"EPSG:27700"}},"type":"geometrycollection","geometries":[{"coordinates":[[[534088.717138156,188190.544919196],[534092.460608377,188178.992349367],[534067.584788156,188171.619922985],[534061.144695374,188170.241506913],[534060.87767781,188181.888906143],[534088.717138156,188190.544919196]]],"type":"Polygon"},{"coordinates":[[[534088.717138156,188190.544919196],[534092.460608377,188178.992349367],[534067.584788156,188171.619922985],[534061.144695374,188170.241506913],[534060.87767781,188181.888906143],[534088.717138156,188190.544919196]]],"type":"Polygon"}]},"centroid":{"lon":-0.066565,"lat":51.576512},"actual_completion_date":null,"pp_id":"14901908","decision_agency":"Borough","parking_details":null,"locality":"HACKNEY","id":"Hackney-2026_0950","application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"All works","intended_completion_date":"11/2026","intended_commencement_date":"07/2026"}],"total_gia_gained":52.8,"site_area":0,"total_gia_lost":0,"total_gia_existing":174,"existing_proposed_floorspace_details":[{"gia_existing":174,"gia_gained":52.8,"use_class":"C3","gia_lost":0}],"projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":52.8,"total_gia_lost":0,"total_gia_existing":174},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"urban_greening_factor_score":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":0,"ownership_status":"Private"}}