{"date_building_work_completed_under_previous_permission":null,"cil_liability":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.072282,51.570732],[-0.072282,51.570728],[-0.072294,51.570728],[-0.072293,51.570714],[-0.072303,51.570714],[-0.072303,51.57066],[-0.072246,51.570659],[-0.072247,51.570682],[-0.07222,51.570698],[-0.072151,51.570698],[-0.072147,51.570732],[-0.072282,51.570732]]]},"postcode":"N16 6EA","ward":"Springfield Ward","appeal_start_date":null,"appeal_decision":null,"valid_date":"08/06/2026","secondary_street_name":null,"centroid_northing":187521,"reference_no_of_permission_being_relied_on":null,"actual_commencement_date":null,"last_updated":"2026-09-02T07:35:16.876Z","description":"Erection of single storey side and rear extensions to existing office building, insertion of rooflights and excavation of basement and associated lightwell","subdivision_of_building":null,"epc_number":null,"url_planning_app":"https://developmentandhousing.hackney.gov.uk//planning/index.html?fa=getApplication&id=85498","borough":"Hackney","street_name":"PORTLAND AVENUE","decision_process":"Delegated","last_synced":"2026-09-03T01:50:46.473Z","last_updated_by":"Portal","date_building_work_started_under_previous_permission":null,"application_type":"All Other","lapsed_date":"11/08/2029","last_date_consultation_comments":"11/07/2026","title_number":null,"appeal_status":null,"application_type_full":"Full planning permission","development_type":"Minor all other minor developments","decision_target_date":"03/08/2026","lpa_name":"Hackney","uprn":"100021065392","decision_date":"11/08/2026","lpa_app_no":"2026/1232","centroid_easting":533697,"appeal_decision_date":null,"decision_conditions":["<p>The development hereby permitted must be begun not later than the expiration of three years beginning with the date of this permission.</p><p><br></p><p>\r\n</p><p>\r\nREASON: In order to comply with the provisions of the Town and Country Planning Act 1990 (as amended).</p><p>\r\n</p>","<p>The Development hereby permitted shall only be carried out and completed strictly in accordance with the submitted plans hereby approved and any subsequent approval of details.\r\n</p><p><br></p><p>\r\nREASON: To ensure that the development hereby permitted is carried out in full accordance with the plans hereby approved.\r\n</p>","All new external finishes in respect of all the works hereby approved (and any other incidental works to be carried out in this connection) shall match the existing building in respect of materials used, detailed execution and finished appearance, unless otherwise stated on the drawings hereby approved.REASON: To ensure that the external appearance of the building is satisfactory and does not detract from the character and visual amenity of the area.","No development shall commence, other than works of demolition, until a report (including intrusive investigation/trial pit and monitoring where necessary) demonstrating that the basement development will not increase the potential for groundwater flooding to itself or to the surrounding area during and post-construction has been submitted to the Local Planning Authority for approval. Where groundwater is identified as a potential risk, details of appropriate controls including flood resilience and/or resistance measures shall be submitted to the LPA for approval and the approved measures incorporated before the basement is occupied. The basement shall be constructed and completed in accordance with the approved plans in line with BS 8102:2022 Protection of below ground structures against water ingress - code of practice.REASON: To address and mitigate the impacts of flood risk.","No demolition or development shall take place until a written scheme of investigation (WSI) has been submitted to and approved by the local planning authority in writing. For land that is included within the WSI, no demolition or development shall take place other than in accordance with the agreed WSI, which shall include the statement of significance and research objectives, and the following:A. The programme and methodology of site investigation and recording and the nomination of a competent person(s) or organisation to undertake the agreed worksB. Where appropriate, details of a programme for delivering related positive public benefitsC. The programme for post-investigation assessment and subsequent analysis, publication &amp; dissemination and deposition of resulting material. This part of the condition shall not be discharged until these elements have been fulfilled in accordance with the programme set out in the WSI.The written scheme of investigation will need to be prepared and implemented by a suitably professionally accredited archaeological practice in accordance with Historic England’s Guidelines for Archaeological Projects in Greater London. This condition is exempt from deemed discharge under schedule 6 of The Town and Country Planning (Development Management Procedure) (England) Order 2015.REASON: To safeguard the archaeological interest of the site, which is within an Area of Archaeological Priority and to ensure that the archaeological operations are undertaken to an acceptable standard and that legitimate archaeological interest in the site is satisfied."],"site_number":"70","bo_system":"Portal","status":"Approved","site_name":null,"decision":"Approved","polygon":{"crs":{"type":"name","properties":{"name":"EPSG:27700"}},"type":"geometrycollection","geometries":[{"coordinates":[[[533695.826730802,187522.855217402],[533695.843221314,187522.355360394],[533695.043450464,187522.335366025],[533695.117655698,187520.765815461],[533694.449805665,187520.745821389],[533694.57348164,187514.727544144],[533698.531110816,187514.787526805],[533698.423925288,187517.286811124],[533700.237838452,187519.126284881],[533705.003484039,187519.256247306],[533705.168384982,187523.07515423],[533695.826730802,187522.855217402]]],"type":"Polygon"},{"coordinates":[[[533695.826730802,187522.855217402],[533695.843221314,187522.355360394],[533695.043450464,187522.335366025],[533695.117655698,187520.765815461],[533694.449805665,187520.745821389],[533694.57348164,187514.727544144],[533698.531110816,187514.787526805],[533698.423925288,187517.286811124],[533700.237838452,187519.126284881],[533705.003484039,187519.256247306],[533705.168384982,187523.07515423],[533695.826730802,187522.855217402]]],"type":"Polygon"}]},"centroid":{"lon":-0.072266,"lat":51.570715},"actual_completion_date":null,"pp_id":"14994614","decision_agency":"Borough","parking_details":{"no_existing_car":2,"net_car":-2,"no_proposed_car":0},"locality":"HACKNEY","id":"Hackney-2026_1232","application_details":{"other_residential_accommodation_details":{"site_area":132},"site_area":132,"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"entire development","intended_completion_date":"03/2027","intended_commencement_date":"08/2026"}],"total_gia_gained":106,"open_and_protected_space_details":{"protected_space_count":0,"open_space_local_and_other_area_gain":0,"open_spaces_details":[{"area":0.0052,"access":"Restricted","land_swap":false,"open_space_designation":"Not Designated","description":"concrete paved hard standing","open_space_type":"Brownfield land"}],"open_space_mol_area_loss":0,"open_space_green_belt_area_gain":0,"open_space_local_and_other_area_loss":0,"open_space_mol_area_gain":0,"open_space_green_belt_area_loss":0},"total_gia_lost":0,"total_gia_existing":48,"existing_proposed_floorspace_details":[{"gia_existing":48,"gia_gained":106,"use_class":"EG1","gia_lost":0}],"projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":106,"total_gia_lost":0,"total_gia_existing":48},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0.03,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"urban_greening_factor_score":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":1,"total_annual_nox_emissions":0.4,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":true},"internal_resi_water_usage":0,"ownership_status":"Private"}}