{"uprn":"100021073358","ward":"De Beauvoir Ward","epc_number":null,"description":"Demolition of existing rear extensions; erection of a ground floor single storey rear extension; front elevation refurbishment; remedial works to the roof; internal alterations; replacement and refurbishment of windows; and rear landscaping works. ","centroid_easting":532965,"decision_date":"16/10/2026","street_name":"SOUTHGATE ROAD","locality":"HACKNEY","status":"Approved","date_building_work_started_under_previous_permission":null,"application_type_full":"Full planning & listed building consent","last_synced":"2026-10-21T16:11:04.039Z","lpa_name":"Hackney","decision_target_date":"12/08/2026","lpa_app_no":"2026/1295","title_number":null,"decision":"Approved","last_updated":"2026-10-20T07:25:51.848Z","appeal_start_date":null,"actual_commencement_date":null,"bo_system":"Portal","secondary_street_name":null,"decision_agency":"Borough","last_date_consultation_comments":"30/07/2026","appeal_decision_date":null,"actual_completion_date":null,"centroid_northing":184448,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.084084,51.543248],[-0.083877,51.54322],[-0.083862,51.543218],[-0.083775,51.543206],[-0.083724,51.5432],[-0.083699,51.54326],[-0.083816,51.543276],[-0.083882,51.543285],[-0.0839,51.543288],[-0.084062,51.54331],[-0.084174,51.543325],[-0.084197,51.543267],[-0.084084,51.543248]]]},"date_building_work_completed_under_previous_permission":null,"lapsed_date":"16/10/2029","decision_conditions":["<p>The Development hereby permitted shall only be carried out and completed strictly in accordance with the submitted plans hereby approved and any subsequent approval of details.\r\n</p><p><br></p><p>\r\nREASON: To ensure that the development hereby permitted is carried out in full accordance with the plans hereby approved.\r\n</p>","<p>The development hereby permitted must be begun not later than the expiration of three years beginning with the date of this permission.</p><p><br></p><p>\r\n</p><p>\r\nREASON: In order to comply with the provisions of the Town and Country Planning Act 1990 (as amended).</p><p>\r\n</p>","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:6pt;margin-bottom:6pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;The following shall be submitted to and approved in writing by the LPA prior to the commencement of the relevant part of the works. The work shall be carried out in accordance with the details so approved, and shall be maintained as such thereafter.&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:6pt;margin-bottom:6pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;a) Details and samples of all proposed external materials, fixtures and finishes, including bricks, render and roofing slates&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:6pt;margin-bottom:6pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;b) Details of proposed new or altered internal and external plumbing, waste pipes and ventilation routes&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:6pt;margin-bottom:6pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;c) Details of all proposed vent and flue covers, including scale drawings showing the locations of the proposed vents, product specifications, size, material, colour and finish&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:6pt;margin-bottom:6pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;d) Details of proposed external rainwater and soil pipes&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:6pt;margin-bottom:6pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;e) Details of the proposed Ionic capital to the front porch&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-b5bbd92c-7fff-ddbc-42ac-f296d2829f4b&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:6pt;margin-bottom:6pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Reason: In order to protect the special interest of the listed building.&lt;/span&gt;&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:6pt;margin-bottom:6pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;The following elements of the scheme shall not be installed, implemented or carried out unless in accordance with details which shall have been submitted to and approved in writing by the Local Planning Authority.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:6pt;margin-bottom:6pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;a) Full details of proposed repair and upgrading of timber sash windows&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:6pt;margin-bottom:6pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;b) A detailed survey of the age, significance and condition of any windows which are proposed to be replaced&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:6pt;margin-bottom:6pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;c) Details of all proposed external windows and doors including the material, colour, finish, product information if available, and large scale drawings of each window (elevations at 1:20, sections and details at 1:5, showing the window and its masonry surround/reveal)&amp;nbsp; ith full details of the proposed replacement windows.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-694f543b-7fff-1776-cf65-47a5719a66af&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:6pt;margin-bottom:6pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Reason: In order to protect the special interest of the listed building.&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;A scheme for the provision and implementation of flood resilient and resistant construction details and measures for the site against surface water flood risk shall be submitted to and agreed, in writing with the LPA in consultation with the LLFA prior to the construction of the measures. The scheme shall be carried out in its entirety before the extension is occupied and; constructed and completed in accordance with the approved plans in line with current best practices.&lt;/p&gt;&lt;p&gt;REASON: In the interest of sustainable urban drainage.&lt;/p&gt;","&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:6pt;margin-bottom:6pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Tree and ground protection for all retained trees at the site and on adjacent land shall be undertaken in accordance with BS5837:2012 (Trees in relation to construction - Recommendations) and will protect the root protection area calculated as described in Table 2 of that British Standard for the duration of all site works (including demolition) undertaken in connection with the development hereby approved. The protective fencing will be 2.4m high and conform to Figure 2 of BS5837:2012 i.e. a scaffold framework comprising a vertical and horizontal framework, well braced to resist impacts, with vertical tubes spaced at a maximum interval of 3m. On to this weldmesh panels should be securely fixed with wire or scaffold clamps. A suitably robust alternative will be acceptable where levels of construction traffic are anticipated to be low.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span id=&quot;docs-internal-guid-198f5b1e-7fff-5ca3-bd69-123ce145e4a0&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:6pt;margin-bottom:6pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;REASON: To accord with the requirements of Section 197(a) of the Town and Country Planning Act 1990 and to provide reasonable environmental standards in the interests of the appearance of the site and area.&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;&lt;span id=&quot;docs-internal-guid-03f4044f-7fff-8c1b-4351-a88c13a4a97a&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p dir=&quot;ltr&quot; style=&quot;line-height:1.2;margin-top:6pt;margin-bottom:6pt;&quot;&gt;&lt;span style=&quot;font-size:10pt;font-family:Arial,sans-serif;color:#000000;background-color:transparent;font-weight:400;font-style:normal;font-variant:normal;text-decoration:none;vertical-align:baseline;white-space:pre;white-space:pre-wrap;&quot;&gt;Prior to the commencement of the relevant part of the work, the applicant shall submit, and have approved in writing by the Local Planning Authority, a detailed layout, cross sections (scale 1:20), full specifications and a detailed management and maintenance plan of the biodiverse roof with a minimum substrate depth of 80mm, not including the vegetative mat. The development shall not be carried out otherwise than in accordance with the details thus approved and shall be fully implemented before the premises are first occupied.\r\n\r\nREASON: In the interest of enhancing biodiversity and managing flood risk and providing a sustainable drainage system. \r\n&lt;/span&gt;&lt;/p&gt;"],"id":"Hackney-2026_1295","application_type":"All Other","pp_id":"14950306","parking_details":null,"url_planning_app":"https://developmentandhousing.hackney.gov.uk//planning/index.html?fa=getApplication&id=85635","appeal_status":null,"valid_date":"17/06/2026","site_number":"128","application_details":{"other_residential_accommodation_details":{"site_area":211},"site_area":211,"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Development","intended_commencement_date":"08/2026","intended_completion_date":"03/2027"}],"total_gia_gained":6,"total_gia_lost":0,"total_gia_existing":150,"existing_proposed_floorspace_details":[{"gia_existing":150,"use_class":"C3","gia_gained":6,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"surface_water_discharge_percentage_reduction":50,"green_suds":true,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":6,"total_gia_lost":0,"total_gia_existing":150},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":25,"no_resi_units_to_have_full_fibre":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":105,"ownership_status":"Private","constraints_details":[{"result":"De Beauvoir","constraints_layer_description":"Wards"},{"result":"Kingsland CAAC (ST)","constraints_layer_description":"Consultees"},{"result":"2014/0262/ENF","constraints_layer_description":"Enforcement Boundaries"},{"result":"2008/0857/ENF","constraints_layer_description":"Enforcement Boundaries"},{"result":"2010/0655/ENF","constraints_layer_description":"Enforcement Boundaries"},{"result":"2008/0856/ENF","constraints_layer_description":"Enforcement Boundaries"},{"result":"2017/0099","constraints_layer_description":"Application Boundaries"},{"result":"2008/1168","constraints_layer_description":"Application Boundaries"},{"result":"SOUTH/1085/00/TCA","constraints_layer_description":"Application Boundaries"},{"result":"SOUTH/452/99/FP","constraints_layer_description":"Application Boundaries"},{"result":"SOUTH/376/95/LB","constraints_layer_description":"Application Boundaries"},{"result":"2004/0260","constraints_layer_description":"Application Boundaries"},{"result":"SOUTH/376/95/LB","constraints_layer_description":"Applications"},{"result":"2023/2724","constraints_layer_description":"Applications"},{"result":"2023/2674","constraints_layer_description":"Applications"},{"result":"2023/2678","constraints_layer_description":"Applications"},{"result":"2023/2723","constraints_layer_description":"Applications"},{"result":"2017/0099","constraints_layer_description":"Applications"},{"result":"2008/1168","constraints_layer_description":"Applications"},{"result":"SOUTH/1085/00/TCA","constraints_layer_description":"Applications"},{"result":"SOUTH/452/99/FP","constraints_layer_description":"Applications"},{"result":"2023/2610","constraints_layer_description":"Applications"},{"result":"2024/0805","constraints_layer_description":"Applications"},{"result":"2025/0255","constraints_layer_description":"Applications"},{"result":"2004/0260","constraints_layer_description":"Applications"},{"result":"2026/0456","constraints_layer_description":"Applications"},{"result":"2023/0095/PA","constraints_layer_description":"Pre-Applications"}]},"site_name":null,"decision_process":"Delegated","postcode":"N1 3HX","last_updated_by":"Portal","centroid":{"lat":51.543273,"lon":-0.083983},"polygon":{"crs":{"type":"name","properties":{"name":"EPSG:27700"}},"geometries":[{"coordinates":[[[532958.000948132,184445.056228696],[532972.45454009,184442.307015701],[532973.501662733,184442.107072421],[532979.553537418,184440.907416114],[532983.148384225,184440.307587817],[532984.69845593,184447.005670706],[532976.519355406,184448.615209575],[532971.9021208,184449.514952501],[532970.698341986,184449.754883301],[532959.353137707,184451.954253911],[532951.553310131,184453.463822012],[532950.151649628,184446.955684624],[532958.000948132,184445.056228696]]],"type":"Polygon"},{"coordinates":[[[532958.000948132,184445.056228696],[532972.45454009,184442.307015701],[532973.501662733,184442.107072421],[532979.553537418,184440.907416114],[532983.148384225,184440.307587817],[532984.69845593,184447.005670706],[532976.519355406,184448.615209575],[532971.9021208,184449.514952501],[532970.698341986,184449.754883301],[532959.353137707,184451.954253911],[532951.553310131,184453.463822012],[532950.151649628,184446.955684624],[532958.000948132,184445.056228696]]],"type":"Polygon"}],"type":"geometrycollection"},"appeal_decision":null,"borough":"Hackney","cil_liability":null,"subdivision_of_building":null,"development_type":"Minor all other minor developments","reference_no_of_permission_being_relied_on":null}