{"polygon":{"crs":{"type":"name","properties":{"name":"EPSG:27700"}},"geometries":[{"coordinates":[[[534937.747294566,185412.982310332],[534939.496709514,185405.692057481],[534961.33786467,185411.663310919],[534959.111747444,185419.653018741],[534937.747294566,185412.982310332]]],"type":"Polygon"},{"coordinates":[[[534937.747294566,185412.982310332],[534939.496709514,185405.692057481],[534961.33786467,185411.663310919],[534959.111747444,185419.653018741],[534937.747294566,185412.982310332]]],"type":"Polygon"}],"type":"geometrycollection"},"site_number":"9","appeal_decision_date":null,"ward":"Homerton Ward","appeal_decision":null,"appeal_start_date":null,"epc_number":null,"borough":"Hackney","title_number":null,"valid_date":"22/06/2026","status":"Refused","decision_process":"Delegated","secondary_street_name":null,"date_building_work_completed_under_previous_permission":null,"reference_no_of_permission_being_relied_on":null,"last_updated":"2026-09-09T06:57:48.011Z","decision_target_date":"17/08/2026","street_name":"CLARENCE PLACE","postcode":"E5 8HN","site_name":null,"lpa_app_no":"2026/1329","development_type":"Minor all other minor developments","locality":"HACKNEY","application_type_full":"Full planning permission","wgs84_polygon":{"coordinates":[[[-0.055182,51.551477],[-0.05516,51.551411],[-0.054843,51.551459],[-0.054872,51.551532],[-0.055182,51.551477]]],"type":"Polygon"},"bo_system":"Portal","url_planning_app":"https://developmentandhousing.hackney.gov.uk//planning/index.html?fa=getApplication&id=85758","actual_completion_date":null,"application_type":"All Other","decision":"Refused","decision_date":"02/09/2026","date_building_work_started_under_previous_permission":null,"appeal_status":null,"centroid_easting":534947,"lpa_name":"Hackney","decision_agency":"Borough","last_updated_by":"Portal","last_synced":"2026-09-10T01:42:53.353Z","lapsed_date":"02/09/2026","description":"Rear elevational alterations at lower ground floor level and replacement of existing timber glazed rear patio doors with sliding aluminum glazed doors&nbsp;","last_date_consultation_comments":"10/08/2026","application_details":{"infrastructure_details":{"ghg_reduction_over_building_regulations":false,"no_homes_passive_cooling":0,"no_homes_to_have_electrical_heating":0,"no_new_water_connections_required":0,"waste_provision":true,"total_annual_pm_emissions":0,"mobile_network_operators_consultation":false,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"percentage_demolition_construction_material_recycling":30},"total_gia_existing":107,"grey_water_reuse":false,"green_suds":false,"ownership_status":"Private","existing_proposed_floorspace_details":[{"gia_existing":107,"gia_gained":0,"use_class":"SG","gia_lost":0}],"total_gia_gained":0,"site_area":178,"other_residential_accommodation_details":{"site_area":178},"projected_cost_of_works":"Up to £2m","rain_water_harvesting":false,"surface_water_discharge_percentage_reduction":0,"phasing_details":[{"phase_detail":"Entire project","intended_completion_date":"09/2026","intended_commencement_date":"08/2026"}],"scheme_phasing":true,"total_gia_lost":0,"garden_land_lost":false,"internal_resi_water_usage":0,"affordable_housing_fast_track":false,"non_residential_details":{"total_gia_lost":0,"total_gia_gained":0,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_existing":107}},"pp_id":"15020309","actual_commencement_date":null,"uprn":"10008240767","centroid_northing":185412,"subdivision_of_building":"Lower ground floor flat No.9","centroid":{"lat":51.551466,"lon":-0.055049},"parking_details":null,"id":"Hackney-2026_1329","cil_liability":null,"decision_conditions":["&lt;p&gt;The proposed development would have a detrimental impact upon the character and appearance of the host property whilst failing to preserve or enhance the character and appearance of the conservation area. No public benefits have been identified that would outweigh the level of harm caused, contrary to policies D1 (London&#x27;s form, character and capacity for growth), D3 (Optimising site capacity through the design-led approach), D4 (Delivering good design), and HC1 (Heritage conservation and growth) of The London Plan (2021), policies LP1 (Design Quality and Local Character), LP3 (Design Code), and LP4 (Designated Heritage Assets) of the Hackney Local Plan 2033 (2020), and the council’s Residential Extensions and Alterations SPD (2025).&lt;/p&gt;"]}