{"polygon":{"crs":{"type":"name","properties":{"name":"EPSG:27700"}},"geometries":[{"coordinates":[[[534749.801136221,187056.258779326],[534751.301737259,187044.402173368],[534752.893034247,187031.805778866],[534761.748229959,187033.005435784],[534760.247628888,187044.352187648],[534760.099217623,187045.601829978],[534758.854213063,187054.899168752],[534754.302939615,187089.399293054],[534752.497271237,187089.149364619],[534745.653870531,187088.249622262],[534749.347657656,187059.407878251],[534749.50431392,187058.808049563],[534749.801136221,187056.258779326]]],"type":"Polygon"},{"coordinates":[[[534749.801136221,187056.258779326],[534751.301737259,187044.402173368],[534752.893034247,187031.805778866],[534761.748229959,187033.005435784],[534760.247628888,187044.352187648],[534760.099217623,187045.601829978],[534758.854213063,187054.899168752],[534754.302939615,187089.399293054],[534752.497271237,187089.149364619],[534745.653870531,187088.249622262],[534749.347657656,187059.407878251],[534749.50431392,187058.808049563],[534749.801136221,187056.258779326]]],"type":"Polygon"}],"type":"geometrycollection"},"site_number":"27","appeal_decision_date":null,"ward":"Springfield Ward","appeal_decision":null,"appeal_start_date":null,"epc_number":null,"borough":"Hackney","title_number":null,"valid_date":"03/07/2026","status":"Approved","decision_process":"Delegated","secondary_street_name":null,"date_building_work_completed_under_previous_permission":null,"reference_no_of_permission_being_relied_on":null,"last_updated":"2026-10-06T07:46:41.681Z","decision_target_date":"28/08/2026","street_name":"WARWICK GROVE","postcode":"E5 9HX","site_name":null,"lpa_app_no":"2026/1417","development_type":"Minor all other minor developments","locality":"HACKNEY","application_type_full":"Full planning permission","wgs84_polygon":{"coordinates":[[[-0.057262,51.566289],[-0.057245,51.566182],[-0.057227,51.566068],[-0.057099,51.566077],[-0.057116,51.566179],[-0.057118,51.56619],[-0.057132,51.566274],[-0.057185,51.566585],[-0.057211,51.566584],[-0.05731,51.566577],[-0.057268,51.566317],[-0.057266,51.566312],[-0.057262,51.566289]]],"type":"Polygon"},"bo_system":"Portal","url_planning_app":"https://developmentandhousing.hackney.gov.uk//planning/index.html?fa=getApplication&id=85694","actual_completion_date":null,"application_type":"All Other","decision":"Approved","decision_date":"26/08/2026","date_building_work_started_under_previous_permission":null,"appeal_status":null,"centroid_easting":534753,"lpa_name":"Hackney","decision_agency":"Borough","last_updated_by":"Portal","last_synced":"2026-10-07T03:18:40.580Z","lapsed_date":"26/08/2029","description":"Excavation to provide a basement level and creation of lightwells to the side with stairwells for emergency egress.","last_date_consultation_comments":"06/08/2026","application_details":{"infrastructure_details":{"ghg_reduction_over_building_regulations":false,"no_homes_passive_cooling":0,"no_homes_to_have_electrical_heating":0,"no_new_water_connections_required":0,"waste_provision":true,"total_annual_pm_emissions":0,"mobile_network_operators_consultation":false,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"percentage_demolition_construction_material_recycling":0},"total_gia_existing":316.4,"grey_water_reuse":false,"green_suds":false,"ownership_status":"Private","existing_proposed_floorspace_details":[{"gia_existing":316.4,"use_class":"F1","gia_gained":386.4,"gia_lost":0}],"total_gia_gained":386.4,"site_area":0,"projected_cost_of_works":"Up to £2m","rain_water_harvesting":false,"surface_water_discharge_percentage_reduction":0,"phasing_details":[{"phase_detail":"All works","intended_completion_date":"12/2025","intended_commencement_date":"06/2025"}],"scheme_phasing":true,"total_gia_lost":0,"garden_land_lost":false,"internal_resi_water_usage":0,"affordable_housing_fast_track":false,"non_residential_details":{"total_gia_lost":0,"total_gia_gained":386.4,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_existing":316.4}},"pp_id":"15040211","actual_commencement_date":null,"uprn":"100021080030","centroid_northing":187052,"subdivision_of_building":null,"centroid":{"lat":51.56625,"lon":-0.057218},"parking_details":null,"id":"Hackney-2026_1417","cil_liability":null,"decision_conditions":["<p>The development hereby permitted must be begun not later than the expiration of three years beginning with the date of this permission.</p><p><br></p><p>\r\n</p><p>\r\nREASON: In order to comply with the provisions of the Town and Country Planning Act 1990 (as amended).</p><p>\r\n</p>","<p>The Development hereby permitted shall only be carried out and completed strictly in accordance with the submitted plans hereby approved and any subsequent approval of details.\r\n</p><p><br></p><p>\r\nREASON: To ensure that the development hereby permitted is carried out in full accordance with the plans hereby approved.\r\n</p>","&lt;p&gt;No development shall commence, other than works of demolition, until a report (including intrusive investigation/trial pit and monitoring where necessary) demonstrating that the basement development and lightwell will not increase the potential for groundwater flooding to itself or to the surrounding area during and post-construction has been submitted to the Local Planning Authority for approval. Where groundwater is identified as a potential risk, details of appropriate controls including flood resilience and/or resistance measures shall be submitted to the LPA for approval and the approved measures incorporated before the basement is occupied. The basement and lightwell shall be constructed and completed in accordance with the approved plans in line with BS 8102:2022 Protection of below ground structures against water ingress - code of practice.&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;\r\nREASON: To ensure that the development will provide a sustainable drainage system. The condition is required to be discharged prior to the commencement of development to ensure that sustainable drainage is incorporated into the design of the development.\r\n&lt;/p&gt;"]}