{"polygon":{"crs":{"type":"name","properties":{"name":"EPSG:27700"}},"geometries":[{"coordinates":[[[535392.503648362,185765.208339037],[535389.700327867,185766.707910113],[535386.798066035,185761.299458166],[535413.55328935,185746.953564592],[535416.496776072,185752.252047925],[535403.354148911,185759.300030312],[535392.503648362,185765.208339037]]],"type":"Polygon"},{"coordinates":[[[535392.503648362,185765.208339037],[535389.700327867,185766.707910113],[535386.798066035,185761.299458166],[535413.55328935,185746.953564592],[535416.496776072,185752.252047925],[535403.354148911,185759.300030312],[535392.503648362,185765.208339037]]],"type":"Polygon"}],"type":"geometrycollection"},"site_number":"72","appeal_decision_date":null,"ward":"Lea Bridge Ward","appeal_decision":null,"appeal_start_date":null,"epc_number":null,"borough":"Hackney","title_number":null,"valid_date":"20/07/2026","status":"Approved","decision_process":"Delegated","secondary_street_name":null,"date_building_work_completed_under_previous_permission":null,"reference_no_of_permission_being_relied_on":null,"last_updated":"2026-10-20T07:25:49.194Z","decision_target_date":"14/09/2026","street_name":"POWERSCROFT ROAD","postcode":"E5 0PP","site_name":null,"lpa_app_no":"2026/1423","development_type":"Minor all other minor developments","locality":"HACKNEY","application_type_full":"Full planning permission","wgs84_polygon":{"coordinates":[[[-0.048492,51.554533],[-0.048532,51.554547],[-0.048576,51.5545],[-0.048196,51.554364],[-0.048151,51.554411],[-0.048338,51.554478],[-0.048492,51.554533]]],"type":"Polygon"},"bo_system":"Portal","url_planning_app":"https://developmentandhousing.hackney.gov.uk//planning/index.html?fa=getApplication&id=85945","actual_completion_date":null,"application_type":"All Other","decision":"Approved","decision_date":"14/10/2026","date_building_work_started_under_previous_permission":null,"appeal_status":null,"centroid_easting":535397,"lpa_name":"Hackney","decision_agency":"Borough","last_updated_by":"Portal","last_synced":"2026-10-21T16:11:04.039Z","lapsed_date":"14/10/2029","description":"Demolition of the existing outbuilding and erection of a single-storey outbuilding within the rear garden.","last_date_consultation_comments":"10/09/2026","application_details":{"infrastructure_details":{"ghg_reduction_over_building_regulations":false,"no_homes_passive_cooling":0,"no_homes_to_have_electrical_heating":0,"no_new_water_connections_required":0,"waste_provision":true,"total_annual_pm_emissions":0,"mobile_network_operators_consultation":false,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"percentage_demolition_construction_material_recycling":0},"total_gia_existing":320.62,"grey_water_reuse":false,"green_suds":false,"ownership_status":"Private","existing_proposed_floorspace_details":[{"gia_existing":320.62,"use_class":"SG","gia_gained":0,"gia_lost":0}],"total_gia_gained":0,"site_area":336.93,"other_residential_accommodation_details":{"site_area":336.93},"projected_cost_of_works":"Up to £2m","rain_water_harvesting":false,"surface_water_discharge_percentage_reduction":0,"phasing_details":[{"phase_detail":"construction","intended_commencement_date":"08/2026","intended_completion_date":"09/2026"}],"scheme_phasing":true,"total_gia_lost":0,"garden_land_lost":true,"internal_resi_water_usage":0,"affordable_housing_fast_track":false,"non_residential_details":{"total_gia_lost":0,"total_gia_gained":0,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_existing":320.62},"constraints_details":[{"result":"Lea Bridge","constraints_layer_description":"Wards"},{"result":"2017/3824","constraints_layer_description":"Application Boundaries"},{"result":"NORTH/78/00/FP","constraints_layer_description":"Application Boundaries"},{"result":"2015/3060","constraints_layer_description":"Application Boundaries"},{"result":"2024/0721","constraints_layer_description":"Applications"},{"result":"2021/3334","constraints_layer_description":"Applications"},{"result":"NORTH/78/00/FP","constraints_layer_description":"Applications"},{"result":"2017/3824","constraints_layer_description":"Applications"},{"result":"2021/2587","constraints_layer_description":"Applications"},{"result":"2015/3060","constraints_layer_description":"Applications"},{"result":"2021/0208/PA","constraints_layer_description":"Pre-Applications"},{"result":"2021/0068/ENF","constraints_layer_description":"Enforcements"},{"result":"2023/0176/ENF","constraints_layer_description":"Enforcements"},{"result":"2023/0205/ENF","constraints_layer_description":"Enforcements"}]},"pp_id":"15046188","actual_commencement_date":null,"uprn":"100021065937","centroid_northing":185760,"subdivision_of_building":"Rear garden","centroid":{"lat":51.554485,"lon":-0.048429},"parking_details":null,"id":"Hackney-2026_1423","cil_liability":null,"decision_conditions":["<p>The Development hereby permitted shall only be carried out and completed strictly in accordance with the submitted plans hereby approved and any subsequent approval of details.\r\n</p><p><br></p><p>\r\nREASON: To ensure that the development hereby permitted is carried out in full accordance with the plans hereby approved.\r\n</p>","<p>The development hereby permitted must be begun not later than the expiration of three years beginning with the date of this permission.</p><p><br></p><p>\r\n</p><p>\r\nREASON: In order to comply with the provisions of the Town and Country Planning Act 1990 (as amended).</p><p>\r\n</p>","<p>All new external facing and roofing materials in respect of all the works hereby approved (and any other incidental works carried out in this connection) shall match those of the existing building in respect of materials used, detailed execution and finished appearance including type, size, colour, bond, pointing, coursing, jointing, profile and texture (delete as appropriate)</p><p><br></p><p>\r\n\r\nREASON: To ensure the development integrates with the host building and surrounding area.\r\n</p>","&lt;p&gt;Full details of site-appropriate biodiversity enhancements, such as a green roof or integrated bird/bat boxes, must be submitted to and approved by the Local Planning Authority, in writing, prior to the commencement of any works above ground level (excluding the demolition of the existing unauthorised outbuilding required under Enforcement Notice 2023/0176/ENF). The development shall not be carried out otherwise than in accordance with the details thus approved which shall be implemented in full prior to the first use/occupation of the development.&lt;br&gt;&lt;br&gt;REASON: In the interest of enhancing biodiversity&lt;/p&gt;","&lt;p&gt;A scheme for the provision and implementation of flood resilient and resistant construction details and measures for the site against surface water flood risk shall be submitted to and agreed, in writing with the LPA in consultation with the LLFA prior to the construction of the measures. The scheme shall be carried out in its entirety before the outbuilding is occupied and; constructed and completed in accordance with the approved plans in line with current best practices.&lt;/p&gt;&lt;div&gt;&lt;br&gt;&lt;div&gt;REASON: To promote sustainable water management and prevent increased surface water runoff into the local network.&lt;/div&gt;&lt;/div&gt;"]}