{"borough":"London Borough of Hammersmith and Fulham","application_type":"All Other","decision":null,"decision_conditions":null,"last_synced":"2025-12-12T01:53:34.521Z","centroid_northing":"178727","url_planning_app":null,"lpa_app_no":"2025/02533/FUL","site_number":"5, 17","ward":"GROVE","locality":null,"last_date_consultation_comments":"11/11/2025","date_building_work_started_under_previous_permission":null,"description":"Removal of the existing revolving doors and erection of a single storey glazed extension over the existing entrance steps, erection of handrail and new steps to the side over the existing forecourt facing Hammersmith Grove.\r","parking_details":null,"postcode":"W6 0LG","appeal_status":null,"cil_liability":false,"date_building_work_completed_under_previous_permission":null,"pp_id":"PP-14325196","status":"Application Under Consideration","last_updated_by":"Idox Uniform","polygon":{"geometries":[{"coordinates":[[[523232,178735],[523229,178747],[523225,178746],[523225,178744],[523228,178734],[523232,178735]]],"type":"Polygon"}],"type":"geometrycollection"},"wgs84_polygon":{"coordinates":[[[-0.226257,51.494137],[-0.226296,51.494245],[-0.226354,51.494237],[-0.226355,51.494219],[-0.226315,51.494129],[-0.226257,51.494137]]],"type":"Polygon"},"appeal_decision_date":null,"secondary_street_name":null,"lapsed_date":null,"bo_system":"Idox Uniform","decision_date":null,"centroid_easting":"523220","actual_commencement_date":null,"id":"Hammersmith_&_Fulham-2025_02533_FUL","lpa_name":"Hammersmith & Fulham","decision_target_date":"16/12/2025","valid_date":"21/10/2025","development_type":null,"last_updated":"2025-12-11T21:01:12.133Z","subdivision_of_building":null,"reference_no_of_permission_being_relied_on":null,"centroid":{"lat":51.494068,"lon":-0.226433},"decision_process":null,"application_type_full":"Full planning permission","decision_agency":null,"street_name":"Hammersmith Grove","appeal_decision":null,"title_number":[],"site_name":"The Triangle","appeal_start_date":null,"application_details":{"scheme_phasing":true,"internal_resi_water_usage":0,"total_gia_gained":11.5,"non_residential_details":{"total_gia_existing":0,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":11.5},"garden_land_lost":false,"existing_proposed_floorspace_details":[{"gia_existing":0,"use_class":"EG1","gia_gained":11.5,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","grey_water_reuse":false,"total_gia_existing":0,"surface_water_discharge_percentage_reduction":0,"affordable_housing_fast_track":false,"rain_water_harvesting":false,"ownership_status":"Private","site_area":0.0035,"total_gia_lost":0,"green_suds":false,"phasing_details":[{"phase_detail":"x","intended_commencement_date":"01/2026","intended_completion_date":"06/2026"}],"infrastructure_details":{"no_homes_to_have_electrical_heating":0,"waste_provision":true,"green_roof_area":26.9,"ghg_reduction_over_building_regulations":false,"no_resi_units_to_have_full_fibre":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"total_annual_nox_emissions":0,"no_new_gas_connections_required":0,"percentage_demolition_construction_material_recycling":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_non_resi_units_to_have_full_fibre":0,"total_annual_pm_emissions":0}},"epc_number":null,"uprn":"000034026570","actual_completion_date":null}