{"borough":"London Borough of Hammersmith and Fulham","application_type":"All Other","decision":"Approved","decision_conditions":["Materials","Standard time limit","Justification","Approved Plans"],"last_synced":"2026-01-30T02:10:09.403Z","centroid_northing":"182888","url_planning_app":null,"lpa_app_no":"2025/02892/FUL","site_number":"42","ward":"COLLP","locality":null,"last_date_consultation_comments":null,"date_building_work_started_under_previous_permission":null,"description":"Replacement of all existing single glazed timber framed windows with new double glazed uPVC framed windows at first floor level.","parking_details":null,"postcode":"NW10 6BL","appeal_status":null,"cil_liability":false,"date_building_work_completed_under_previous_permission":null,"pp_id":"PP-14408892","status":"Approved","last_updated_by":"Idox Uniform","polygon":{"geometries":[{"coordinates":[[[522664,182882],[522669,182888],[522676,182897],[522674,182899],[522673,182900],[522670,182896],[522660,182886],[522659,182884],[522662,182881],[522664,182882]]],"type":"Polygon"}],"type":"geometrycollection"},"wgs84_polygon":{"coordinates":[[[-0.232993,51.53153],[-0.232919,51.531583],[-0.232815,51.531662],[-0.232843,51.531681],[-0.232857,51.53169],[-0.232902,51.531655],[-0.233049,51.531567],[-0.233065,51.531549],[-0.233022,51.531522],[-0.232993,51.53153]]],"type":"Polygon"},"appeal_decision_date":null,"secondary_street_name":null,"lapsed_date":"15/12/2028","bo_system":"Idox Uniform","decision_date":"15/12/2025","centroid_easting":"522664","actual_commencement_date":null,"id":"Hammersmith_&_Fulham-2025_02892_FUL","lpa_name":"Hammersmith & Fulham","decision_target_date":"15/12/2025","valid_date":"20/10/2025","development_type":null,"last_updated":"2026-01-29T21:00:56.550Z","subdivision_of_building":null,"reference_no_of_permission_being_relied_on":null,"centroid":{"lat":51.531584,"lon":-0.232991},"decision_process":"Delegated","application_type_full":"Full planning permission","decision_agency":null,"street_name":"Ponsard Road","appeal_decision":null,"title_number":[],"site_name":"Flat B First Floor","appeal_start_date":null,"application_details":{"scheme_phasing":true,"internal_resi_water_usage":110,"total_gia_gained":0,"non_residential_details":{"total_gia_existing":70,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":0},"garden_land_lost":false,"existing_proposed_floorspace_details":[{"gia_existing":70,"gia_gained":0,"use_class":"C3","gia_lost":0}],"projected_cost_of_works":"Up to £2m","grey_water_reuse":false,"total_gia_existing":70,"surface_water_discharge_percentage_reduction":0,"affordable_housing_fast_track":false,"rain_water_harvesting":false,"ownership_status":"Private","site_area":0.014700000000000001,"total_gia_lost":0,"green_suds":false,"phasing_details":[{"phase_detail":"1","intended_completion_date":"01/2026","intended_commencement_date":"12/2025"}],"infrastructure_details":{"no_homes_to_have_electrical_heating":0,"waste_provision":true,"green_roof_area":0,"ghg_reduction_over_building_regulations":false,"no_resi_units_to_have_full_fibre":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"total_annual_nox_emissions":0,"no_new_gas_connections_required":0,"percentage_demolition_construction_material_recycling":100,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_non_resi_units_to_have_full_fibre":0,"total_annual_pm_emissions":0}},"epc_number":null,"uprn":"000034081106","actual_completion_date":null}