{"decision_target_date":"20/10/2026","url_planning_app":"https://property.lbhf.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/00643/VAR","centroid":{"lat":51.500067,"lon":-0.24444},"decision_date":"13/11/2026","last_synced":"2026-11-14T02:15:44.090Z","wgs84_polygon":{"coordinates":[[[-0.244634,51.500383],[-0.244429,51.499973],[-0.244329,51.499993],[-0.244533,51.500401],[-0.244634,51.500383]]],"type":"Polygon"},"epc_number":null,"last_date_consultation_comments":"10/06/2026","decision_process":"Delegated","site_number":"2","last_updated":"2026-11-13T16:40:00.408Z","decision":"Approved","actual_commencement_date":null,"appeal_decision_date":null,"status":"Approved","bo_system":"Northgate M3","cil_liability":false,"development_type":"Other house holder developments","parking_details":null,"application_details":{},"pp_id":"14337869","last_updated_by":"Northgate M3","reference_no_of_permission_being_relied_on":null,"appeal_start_date":null,"lapsed_date":"12/11/2029","postcode":"W12 9RL","uprn":"34001048","application_type":"Householder","subdivision_of_building":null,"ward":"Wendell Park","borough":"Hammersmith & Fulham","id":"Hammersmith_&_Fulham-P_2026_00643_VAR","appeal_decision":null,"street_name":"Rylett Crescent","secondary_street_name":null,"lpa_name":"Hammersmith & Fulham","date_building_work_completed_under_previous_permission":null,"title_number":null,"description":"Variation of condition 2 of planning permission ref: 2025/00136/VAR granted 20th May 2025 for the Variation of condition 2 (approved drawings) and 3 (materials) of planning permission ref: 2024/01114/FUL granted 11th December 2024 for the 'Erection of a rear roof extension; erection of a single storey rear extension, to the side and rear of the existing back addition following the demolition of existing conservatory and partial demolition of the ground floor back addition; excavation and enlargement of rear part of the existing basement; erection of bin/cycle store in the front garden; erection of timber gates to replace the existing gates at the side of the property including a canopy over part of the side passageway; removal of the front existing brick infill porch and reinstatement of the original front entrance; replacement of all existing single glazed timber framed windows with new double glazed timber framed windows' to allow amendments to the approved drawings to include alterations and increasing the size of the basement extension and changing the materials of the ground floor extension finishes from timber cladding and rendered finish to traditional brickwork' to allow amendments at basement floor level to remove the 4 inch walls, further excavation and re-building of the wall to 300mm thickness.","decision_conditions":["Condition : 1 - Standard time limit\r\nThe development hereby permitted shall not commence later than the expiration of 3 years beginning with the date of the original planning permission dated 15th January 2025 (ref: 2024/01949/FUL).\r\n\r\nAs required by section 91(1)(a) of the Town and Country Planning Act 1990 (as amended by section 51 of the Planning and Compulsory Purchase Act 2004).\r\n","Condition : 2 - The development shall be carried out and completed in accordance with the following approved drawings; other than where those details are altered pursuant to the conditions of this planning permission:\r\n\r\nRC_BASEMENT_APPR_SECTA_REV \r\nRC_BASEMENT_OVERLAP_REV1\r\nRC_BASEMENT_APPR_SECTA_REV1\r\n3051_P09_M\r\nFF23002-PL-010 REV P03\r\nFF23002-PL-001 REV P01\r\nFF23002-PL-012 REV P03\r\nF23002-PL-013 REV  P01\r\nFF23002-PL-014 REV P01\r\nFF23002-PL-016 REV P03\r\nFF23002-PL-022 REV P01\r\nFF23002-PL-020 REV P01\r\nFF23002-PL-0019 REV P02\r\nFF23002-PL-021 REV P01\r\nFF23002-PL-015 REV P02\r\nFF23002-PL-017 REV P01\r\nFF23002-PL-018 REV P01\r\n\r\nand documents\r\n\r\nFRA and Drainage Strategy 2 Rylett Crescent, London, W12 9RL\r\nReference: 654 -Rev - V1 Aug-24 submitted 10/04/2026 \r\n\r\nHarrison Shortt Structural Engineers Ltd for 2 Rylett Crescent, London W12 9RL \r\nStructural Report 2024_05_08 Page 1 3051_Report 01_B submitted 25/08/2026\r\n\r\nBS 5837:2012 Tree Survey, Arboricultural Impact Assessment & Arboricultural Method Statement 2 Rylett Crescent London W12 9RL Date: 9th May 2024 submitted 10/04/2026 \r\n\r\nCONSTRUCTION METHOD STATEMENT submitted 20/04/2026\r\n\r\nTo ensure full compliance with the planning application hereby approved and to prevent harm arising through deviations from the approved plans.\r\n","Condition : 3 - The development hereby approved shall be carried out and completed in accordance with the materials details (including colour and finish) specified below:\r\n\r\n- Walls -Timber cladding and rendered brick\r\nRear roof extension Grey zinc cladding to dormer\r\n-Doors: Slimline sliding doors to the garden\r\n- Windows Double glazed timber windows and door, with details including the colours, opening mechanism, glazing configuration, arched window head and run through sash horns to match the existing/original windows to be replaced.\r\nSide gate - timber\r\n\r\nThe development shall be permanently retained in accordance with the approved details. Any works of making good to existing elevations shall be carried out in materials to match the elevation to which the works relate.\r\n\r\nTo ensure a satisfactory external appearance, in accordance with Policies DC1, DC4 and DC6 of the Local Plan (2018).\r\n","Condition : 4 - No part of any roof of the ground floor extension hereby approved shall be used as a roof terrace or other form of open amenity space. No alterations shall be carried out; nor planters or other chattels placed on the roof. No railings or other means of enclosure shall be erected on the roof, and no alterations shall be carried out to the property to form access onto the roof.\r\n\r\nThe use of the roof as a terrace would increase the likelihood of harm to the existing residential amenities of the occupiers of neighbouring properties as a result of overlooking, noise and disturbance, contrary to Policies HO11 and CC11 of the Local Plan (2018).\r\n","Condition : 5 - The basement hereby approved shall not be converted to use as a separate dwelling and shall only be used in connection with, and remain incidental and ancillary to, the use of the remainder of the application property as a single dwellinghouse. \r\n\r\nThe use of the basement accommodation as a self-contained unit, separate from the use of the remainder of the application property as a single dwellinghouse, would raise materially different planning considerations that the Council would wish to consider at that time, and to minimise flood risk to occupiers, in accordance with Policies DC1, HO4, HO5 and HO11 of the Local Plan (2018).\r\n","Condition : 6 - The development shall be carried out and completed in full accordance with the details contained within the approved FRA and Drainage Strategy [FRA and Drainage Strategy 2 Rylett Crescent, London, W12 9RL Reference: 654 -Rev - V1 Aug-24 submitted 10/04/2026]. No part of the development shall be used or occupied until all flood prevention and mitigation measures have been installed in accordance with the submitted details and the development shall be permanently retained in this form and maintained as necessary thereafter.\r\n\r\nTo limit the impact on flood risk and mitigate the susceptibility of the development to flooding in accordance with Policies CC2, CC3 and CC4 of the Local Plan (2018).\r\n","Condition : 7 - All pruning back of the overhanging trees is to be carried out in accordance with BS3998:2010, and only to the joint boundary unless otherwise agreed with the neighbouring tree owners.\r\n\r\nTo preserve the health of the  trees as well as the visual amenity of the surrounding area in accordance with policies OS5 and DC8 of the Local Plan (2018).\r\n","Condition : 8 - All Arboricultural works contained within BS 5837:2012 Tree Survey, Arboricultural Impact Assessment & Arboricultural Method Statement 2 Rylett Crescent London W12 9RL Date: 9th May 2024 submitted 10/04/2026 shall be in accordance with BS5837:2012. The initial hand digging along the boundary should be to a depth of 1000mm not 500mm.\r\n\r\nTo protect nearby trees in line with Local Plan (2018) OS5 and Key Principle CAG6 of\r\nthe SPD (2018).\r\n","Condition : 9 -  No development shall commence until a preliminary risk assessment report is\r\nsubmitted to and approved in writing by the Council. This report shall comprise: a\r\ndesktop study which identifies all current and previous uses at the site and surrounding area as well as the potential contaminants associated with those uses; a site\r\nreconnaissance; and a conceptual model indicating potential pollutant linkages\r\nbetween sources, pathways and receptors, including those in the surrounding area and\r\nthose planned at the site; and a qualitative risk assessment of any potentially\r\nunacceptable risks arising from the identified pollutant linkages to human health,\r\ncontrolled waters and the wider environment including ecological receptors and\r\nbuilding materials. All works must be carried out in compliance with and by a\r\ncompetent person who conforms to LCRM: Land Contamination Risk Management\r\n(Environment Agency 2023) or the current UK requirements for sampling and testing.\r\n\r\nPotentially contaminative land uses (past or present) are understood to occur at, or\r\nnear to, this site. This condition is required to ensure that no unacceptable risks are\r\ncaused to humans, controlled waters or the wider environment during and following the\r\ndevelopment works, in accordance with policy CC9 the Local Plan (2018) and key\r\nprinciples LC1 to LC7 of the Planning Guidance Supplementary Planning Document\r\n(2018).\r\n","Condition : 10 - No development shall commence until a site investigation scheme is submitted to and\r\napproved in writing by the Council. This scheme shall be based upon and target the\r\nrisks identified in the approved preliminary risk assessment and shall provide\r\nprovisions for, where relevant, the sampling of soil, soil vapour, ground gas, surface\r\nand groundwater . All works must be carried out in compliance with and by a\r\ncompetent person who conforms to LCRM: Land Contamination Risk Management\r\n(Environment Agency 2023) or the current UK requirements for sampling and testing.\r\n\r\nPotentially contaminative land uses (past or present) are understood to occur at, or\r\nnear to, this site. This condition is required to ensure that no unacceptable risks are\r\ncaused to humans, controlled waters or the wider environment during and following the\r\ndevelopment works, in accordance with policy CC9 the Local Plan (2018) and key\r\nprinciples LC1 to LC7 of the Planning Guidance Supplementary Planning Document\r\n(2018).\r\n","Condition : 11 - Unless the Council agree in writing that a set extent of development must commence\r\nto enable compliance with this condition, no development shall commence until,\r\nfollowing a site investigation undertaken in compliance with the approved site\r\ninvestigation scheme, a quantitative risk assessment report is submitted to and\r\napproved in writing by the Council. This report shall: assess the degree and nature of\r\nany contamination identified on the site through the site investigation; include a revised\r\nconceptual site model from the preliminary risk assessment based on the information\r\ngathered through the site investigation to confirm the existence of any remaining\r\npollutant linkages and determine the risks posed by any contamination to human\r\nhealth, controlled waters and the wider environment. All works must be carried out in\r\ncompliance with and by a competent person who conforms to LCRM: Land\r\nContamination Risk Management (Environment Agency 2023) or the current UK\r\nrequirements for sampling and testing.\r\n\r\nPotentially contaminative land uses (past or present) are understood to occur at, or\r\nnear to, this site. This condition is required to ensure that no unacceptable risks are\r\ncaused to humans, controlled waters or the wider environment during and following the\r\ndevelopment works, in accordance with policy CC9 the Local Plan (2018) and key\r\nprinciples LC1 to LC7 of the Planning Guidance Supplementary Planning Document\r\n(2018).\r\n","Condition : 12 - Unless the Council agree in writing that a set extent of development must commence\r\nto enable compliance with this condition, no development shall commence until, a\r\nremediation method statement is submitted to and approved in writing by the Council.\r\nThis statement shall detail any required remediation works and shall be designed to\r\nmitigate any remaining risks identified in the approved quantitative risk assessment. All\r\nworks must be carried out in compliance with and by a competent person who\r\nconforms to LCRM: Land Contamination Risk Management (Environment Agency\r\n2023) or the current UK requirements for sampling and testing.\r\n\r\nPotentially contaminative land uses (past or present) are understood to occur at, or\r\nnear to, this site. This condition is required to ensure that no unacceptable risks are\r\ncaused to humans, controlled waters or the wider environment during and following the\r\ndevelopment works, in accordance with policy CC9 the Local Plan (2018) and key\r\nprinciples LC1 to LC7 of the Planning Guidance Supplementary Planning Document\r\n(2018).\r\n","Condition : 13 - Unless the Council agree in writing that a set extent of development must commence\r\nto enable compliance with this condition, no development shall commence until the\r\napproved remediation method statement has been carried out in full and a verification\r\nreport confirming these works has been submitted to, and approved in writing, by the\r\nCouncil. This report shall include: details of the remediation works carried out; results\r\nof any verification sampling, testing or monitoring including the analysis of any\r\nimported soil; all waste management documentation showing the classification of\r\nwaste, its treatment, movement and disposal; and the validation of gas membrane\r\nplacement. If, during development, contamination not previously identified is found to\r\nbe present at the site, the Council is to be informed immediately and no further\r\ndevelopment (unless otherwise agreed in writing by the Council) shall be carried out\r\nuntil a report indicating the nature of the contamination and how it is to be dealt with is\r\nsubmitted to, and agreed in writing by, the Council. Any required remediation shall be\r\ndetailed in an amendment to the remediation statement and verification of these works\r\nincluded in the verification report. All works must be carried out in compliance with and\r\nby a competent person who conforms to LCRM: Land Contamination Risk\r\nManagement (Environment Agency 2023) or the current UK requirements for sampling\r\nand testing.\r\n\r\nPotentially contaminative land uses (past or present) are understood to occur at, or\r\nnear to, this site. This condition is required to ensure that no unacceptable risks are\r\ncaused to humans, controlled waters or the wider environment during and following the\r\ndevelopment works, in accordance with policy CC9 the Local Plan (2018) and key\r\nprinciples LC1 to LC7 of the Planning Guidance Supplementary Planning Document\r\n(2018).\r\n","Condition : 14 - Unless the Council agree in writing that a set extent of development must commence\r\nto enable compliance with this condition, no development shall commence until an\r\nonward long-term monitoring methodology report is submitted to and approved in\r\nwriting by the Council where further monitoring is required past the completion of\r\ndevelopment works to verify the success of the remediation undertaken. A verification\r\nreport of these monitoring works shall then be submitted to and approved in writing by\r\nthe Council when it may be demonstrated that no residual adverse risks exist. All\r\nworks must be carried out in compliance with and by a competent person who\r\nconforms to LCRM: Land Contamination Risk Management (Environment Agency\r\n2023) or the current UK requirements for sampling and testing.\r\n\r\nPotentially contaminative land uses (past or present) are understood to occur at, or\r\nnear to, this site. This condition is required to ensure that no unacceptable risks are\r\ncaused to humans, controlled waters or the wider environment during and following the\r\ndevelopment works, in accordance with policy CC9 the Local Plan (2018) and key\r\nprinciples LC1 to LC7 of the Planning Guidance Supplementary Planning Document\r\n(2018).\r\n","Condition : 15 - Prior to commencement of the development hereby approved, a Construction Logistics\r\nPlan shall be submitted to, and approved in writing by, the Council. The Construction\r\nLogistics Plan should seek to minimise the impact of construction traffic on nearby\r\nroads and restrict construction trips to off peak hours only. Approved details shall be\r\nimplemented throughout the project period.\r\n\r\nTo ensure that construction works do not adversely impact on the operation of the\r\npublic highway, in accordance with Policies T1 and T7 of the Local Plan (2018).\r\n","Condition : 16 - Prior to commencement of the development, a Construction Management Plan shall be submitted to and approved in writing by the Council. Details shall include control measures for dust, noise, vibration, lighting, delivery locations, restriction of hours of work and all associated activities audible beyond the site boundary to 0800-1800hrs Mondays to Fridays and 0800 -1300 hrs on Saturdays, and not at all on Sundays or bank holidays, advance notification to neighbours and other interested parties of proposed works and public display of contact details including accessible phone contact to persons responsible for the site works for the duration of the works. The approved details shall be implemented throughout the project period.   \r\n\r\nTo ensure that the amenity of occupiers of surrounding premises is not adversely affected by noise, vibration, dust, lighting or other emissions from the building site, in accordance with Policies CC11 and CC13 of the Local Plan (2018).\r\n"],"application_type_full":"Removal/Variation of a condition","actual_completion_date":null,"locality":"London","centroid_easting":521954.0,"lpa_app_no":"P/2026/00643/VAR","valid_date":"21/04/2026","polygon":{"geometries":[{"coordinates":[[[521939.66699645016,179398.82515574386],[521955.01705689006,179353.62503817934],[521961.9170944688,179355.97461613163],[521946.6671064262,179401.0246787169],[521939.66699645016,179398.82515574386]]],"type":"Polygon"}],"type":"geometrycollection"},"decision_agency":"Borough","centroid_northing":179364.0,"site_name":null,"appeal_status":null,"date_building_work_started_under_previous_permission":null}