{"last_synced":"2026-11-12T02:15:57.810Z","epc_number":null,"decision":"Approved","decision_agency":"Borough","decision_conditions":["Condition : 1 - The development hereby permitted shall not commence later than the expiration of 3 years beginning with the date of the original permission Ref: No: 2024/02631/FUL dated 14 February 2025.  \r\n\r\nCondition required to be imposed by section 91(1)(a) of the Town and Country Planning Act 1990 (as amended by section 51 of the Planning and Compulsory Purchase Act 2004).\r\n","Condition : 2 - The development hereby permitted shall be carried out in complete accordance with the following approved drawing numbers, other than where those details are altered pursuant to the conditions of this planning permission. \r\n\r\nDrawings titled:\r\n-1115 UAL-RSS-00-GF-DR-A-1115 Rev. PL02 - Ground Floor Proposed Demolition Plan\r\n-1116 UAL-RSS-00-01-DR-A-1116 Rev. PL02 - First Floor Proposed Demolition Plan\r\n-1117 UAL-RSS-00-02-DR-A-1117 Rev. PL02 - Second Floor - Proposed Demolition Plan\r\n-1118 UAL-RSS-00-03-DR-A-1118 Rev. PL02 - Third Floor - Proposed Demolition Plan\r\n-1121 UAL-RSS-00-XX-DR-A-1121 Rev. PL02 - Site Elevations - Proposed Demolition\r\n-1135 UAL-RSS-00-GF-DR-A-1135 Rev. PL01 - Block A Ground Floor Demolition Plan\r\n-1136 UAL-RSS-00-01-DR-A-1136 Rev. PL01 - Block A First Floor Proposed Demolition\r\n-1155 UAL-RSS-00-GF-DR-A-1155 Rev. PL01 - Block C Ground Floor Proposed Demolition\r\n-1156 UAL-RSS-00-01-DR-A-1156 Rev. PL01 - Block C First Floor Plan - Proposed Demolition\r\n-1157 UAL-RSS-00-02-DR-A-1157 Rev. PL01 - Block C Second Floor Plan - Proposed Demolition\r\n-1158 UAL-RSS-00-03-DR-A-1158 Rev. PL01 - Block C Third Floor Plan - Proposed Demolition\r\n-1165 UAL-RSS-00-GF-DR-A-1165 Rev. PL02 - Block D Ground Floor Proposed Demolition\r\n-1166 UAL-RSS-00-01-DR-A-1166 Rev. PL02 - Block D First Floor Plan - Proposed Demolition\r\n-1167 UAL-RSS-00-01-DR-A-1167 Rev. PL01 - Block B Outbuilding Proposed Demolition\r\n-1172 UAL-RSS-00-XX-DR-A-1172 Rev. PL01 - Proposed Demolition Block A Elevations\r\n-1176 UAL-RSS-00-XX-DR-A-1176 Rev. PL01 - Proposed Demolition Block C Elevations\r\n-1177 UAL-RSS-00-XX-DR-A-1177 Rev. PL02 - Proposed Demolition Block D Elevations\r\n-1178 UAL-RSS-00-XX-DR-A-1178 Rev. PL02 - Proposed Demolition Block D Elevations\r\n-1179 UAL-RSS-00-XX-DR-A-1179 Rev. PL01 - Proposed Demolition Block B Outbuilding Elevations\r\n-1190 UAL-RSS-00-GF-DR-A-1190 Rev. PL01 - Demolition Plan Block C Entrance Internal Ramp\r\n-1191 UAL-RSS-00-GF-DR-A-1191 Rev. PL01 - Demolition Elevations","Condition : 3 - - 2511 UAL RSS 00 GF DR A 2511 Rev. PL01 - Block B External Ramp - Plan\r\n- 2512 UAL RSS 00 GF DR A 2512 Rev. PL01 - Block B External Ramp - Elevations\r\n- 2521 UAL RSS-00-GF-DR-A-2521 Rev. PL01 - Block C External Ramp - Plan\r\n- 2522 UAL-RSS-00-GF-DR-A-2522 Rev. PL01 - Block C External Ramp � Elevations\r\n- UAL RSS 00-00-DR-A-2536-PL01 - Proposed Block D External Ramp � Plan\r\n- UAL RSS 00-00-DR-A-2537-PL01 - Proposed Block D External Ramp - Section\r\n- 2815 UAL-RSS-00-ZZ-DR-A-2815 Rev. PL02 Block D Lift-Section\r\n\r\n\r\nDocuments titled\r\n- Below Ground Construction Method Statement - Revision P02, prepared by Elliott Wood \r\n- Biodiversity Net Gain Plan - Revision 2.0 September 2024, prepared by MKA Ecology \r\n- BNG Statutory Metric Calculation Spreadsheet, prepared by MKA Ecology \r\n- Covering Letter dated 16 September 2024, prepared by Newmark Gerald Eve LLP\r\n - Demolition Management Plan - Revision 1.0 September 2024, prepared by Elliott Wood \r\n- Design and Access Statement - Rev PL03 September 2024, prepared by RSSA \r\n- Flood Risk Assessment 784-B068374 - First Issue, prepared by Tetra Tech \r\n- Heritage Impact Assessment - September 2024, prepared by Portico Heritage\r\n- Operational Management Strategy - August 2024, prepared by UAL \r\n- Preliminary Ecological Appraisal and Preliminary Roost Assessment - September 2024, prepared by MKA Ecology \r\n- Statement of Community Involvement - September 2024, prepared by Kanda Consulting \r\n- Transport Statement - Revision 1.0 September 2024, prepared by Elliott Wood \r\n- Travel Plan - Revision 1.0 September 2024, prepared by Elliott Wood\r\n\r\nTo ensure full compliance with the planning application hereby approved and to prevent harm arising through deviations from the approved plans.\r\n","Condition : 4 - Prior to commencement of each demolition phase of the development hereby permitted, a scheme for temporary solid hoarding fencing (minimum height 2.5 m) and/or enclosure of the site shall be submitted to and approved in writing by the Local Planning Authority. The temporary fencing and/or enclosure shall be installed prior to the start of any site clearance/demolition works and thereafter be retained for the duration of the building works in accordance with the approved details. No part of the temporary fencing and/or enclosure of the site shall be used for the display of commercial advertisement hoardings unless the relevant advertisement consent is sought from the Local Planning Authority.\r\n\r\nTo ensure that construction works do not adversely impact on the operation of the public highway, and that the amenity of occupiers of surrounding premises is not adversely affected in accordance with policies T1, T6, T7, CC10, CC11, CC12 and CC13 of the Local Plan (2018).\r\n\r\nDetails approved under discharge of condition application ref. 2025/00560/DET.","Condition : 5 - Prior to the commencement of the demolition phase (excluding installation of hoarding around the perimeter of the site) of the development hereby permitted, details of Air Quality Emissions Control including Nitrogen Oxides (NOx), Particulates (PM10, PM2.5) emission control of Non-Road Mobile Machinery (NRMM), On Road Vehicles and fugitive dust emissions in order to mitigate air pollution shall be submitted to and approved in writing by the Local Planning Authority. The submitted details shall include: \r\n\r\na.Details of the Non-Road Mobile Machinery (NRMM) used on the site with CESAR Emissions Compliance Verification (ECV) identification that shall comply with the minimum Stage V NOx and PM10 emission criteria of The Non-Road Mobile Machinery (Type-Approval and Emission of Gaseous and Particulate Pollutants) Regulations 2018 and its subsequent amendments. This will apply to both variable and constant speed engines for both NOx and PM. An inventory of all NRMM for the first phase of demolition shall be registered on the London City Hall NRMM register GLA-NRMM-Register prior to commencement of demolition works and thereafter retained and maintained until occupation of the development. \r\n\r\nb.Details of the use of on-road London Ultra Low Emission Zone (ULEZ) compliant vehicles from on-site contractors and suppliers of services and materials to the site e.g. minimum Petrol/Diesel Euro 6 and Euro VI.\r\n\r\nDevelopers must ensure that on-site contractors follow best practicable means to minimise dust, particulates (PM10, PM2.5) and NOx emissions at all times in compliance with the Mayor of London 'The Control of Dust and Emissions during Construction and Demolition', SPG, July 2014. Approved details shall be fully implemented and permanently retained and maintained during the demolition phases of the development.\r\n\r\nTo ensure air quality is not compromised during the demolition phase, in line with Local Plan Policies CC10 and CC13 (2018).\r\n\r\nDetails approved under discharge o","Condition : 6 - All disturbed surfaces of each part of each building shall be made good using materials to match the existing materials, composition, form, finish and colour of the relevant part of the existing building. \r\n\r\nTo ensure a satisfactory external appearance and to prevent harm to the character, appearance and setting of the adjacent conservation area, in accordance with Policies DC1, DC4 and DC8 of the Local Plan (2018).","Condition : 7 - Prior to the commencement of the relevant part of the works, details, including physical samples and colours, of materials to be used on the external surfaces of the building and cycle stores shall be submitted to and approved by the Local Planning Authority, in writing. The works shall not be carried out otherwise than in accordance with the details thus approved.\r\n\r\nTo ensure a satisfactory external appearance and to prevent harm to the character, appearance and setting of the adjacent conservation area, in accordance with Policies DC1, DC4 and DC8 of the Local Plan (2018).\r\n\r\nDetails approved under discharge of condition application ref. 2025/00798/DET.","Condition : 8 - No boxed-in services shall be installed to the interior of the building unless shown on the drawings hereby approved. No permission is granted for any new plumbing, pipes, soil stacks, flues, vents, ductwork, grilles, security alarms, lighting, cameras or other appurtenances fixed to any external faces of the building unless shown on the drawings hereby approved. \r\n\r\nTo ensure a satisfactory external appearance and to prevent harm to the character, appearance and setting of the adjacent conservation area, in accordance with Policies DC1, DC4 and DC8 of the Local Plan (2018).","Condition : 9 - Prior to the commencement of the relevant part of the works, details including materials and colours of all new and replacement windows shall be submitted to and approved in writing by the Local Planning Authority.  The required details shall include a 1:20 scale elevation drawing of each window type showing the glazing pattern and 1:5 scale vertical and horizontal cross section drawings showing the upper and lower stiles, the meeting rails, the dimensions of the glazing, the profile and dimensions of the glazing bars and spacers (if any).  A 1:5 elevation drawing should be provided of any window details, particularly window horns (if any). The development shall not be carried out otherwise than in accordance with the details thus approved.\r\n\r\nTo ensure a satisfactory external appearance and to prevent harm to the character, appearance and setting of the adjacent conservation area, in accordance with Policies DC1, DC4 and DC8 of the Local Plan (2018).\r\n\r\nDetails approved under discharge of condition application ref. 2025/00779/DET.","Condition : 10 - Detailed drawings and full particulars of the following shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the relevant part of the works.  The development shall not be carried out otherwise than in accordance with the details thus approved:\r\na)\tDetails of the proposed lift tower at Block C in the form of detailed drawings in plan, section and elevation at a scale of not less than 1:20 (including the junction of the new structure to the host building);\r\nb)\tDetails of the proposed cycle stores in the form of detailed drawings in plan, section and elevation at a scale of not less than 1:20. \r\nc)\tDetails of the proposed hard and soft landscaping including external ramps and walls in the form of detailed drawings in plan, section and elevation at a scale of not less than 1:20; planting schedules and physical samples of materials of surface treatments, external ramps and walls.\r\n\r\nTo ensure a satisfactory external appearance and to prevent harm to the character, appearance and setting of the adjacent conservation area, in accordance with Policies DC1, DC4 and DC8 of the Local Plan (2018).\r\n\r\nDetails approved under discharge of condition application ref. 2025/01211/DET and  2025/01693/DET. ","Condition : 11 - Within 3 months of the commencement of the development, a Cycle Parking Maintenance and Management Plan shall be submitted and approved in writing to the Local Planning Authority details shall include: \r\na. appropriate lighting and security measures such as CCTV within the cycle parking area in order to allow students/staff to access the area during dark mornings and evenings, especially in winter months. \r\nb.  Details of the lockers to be provided within the cycle parking area. \r\nc. Additional lockers in an area close to the shower and changing facilities in order to store clothes. \r\nThereafter, the document shall be implemented in perpetuity.\r\n\r\nTo ensure satisfactory provision for the cycles and thereby promote sustainable and active modes of transport, in accordance with Policy T3 of the Local Plan (2018).\r\n\r\nDetails approved under discharge of condition application ref. 2025/02432/DET. \r\n","Condition : 12 - The development shall be carried out in accordance with the provisions of the Retrospective Fire Strategy prepared by Mott MacDonald dated October 2024 Rev A (ref. 100117703-MMD-00-LG-RP-FI-001), unless an update to this document is submitted  and approved in writing by the Local Planning Authority.\r\n\r\nTo ensure that the development incorporates the necessary fire safety measures in accordance with Policy D12 of the London Plan (2021).","Condition : 13 - Within 3 months of the commencement of development a Detailed Travel Plan shall be submitted to the Local Planning Authority. Details shall include: \r\n1.\tPromotion of cycle training which is offered by LBHF to anyone working, studying, or living in the borough. \r\n2.\tPromotion of discounted travel for students: Student travel - Transport for London. \r\n3.\tThe University's website should be updated to reflect the ambitions to improve active travel mode share and provide information on available facilities on site and the Travel Plan \r\n4.\tUpdate actions from the submitted Travel Plan to include  setting up a monitoring group, sustainable deliveries, smarter working practices. \r\n\r\nTo ensure that appropriate steps are taken to encourage sustainable modes of transport to the site, in accordance with Policy T2 of the London Plan (2021) and T1, T6 and T7 of the Local Plan (2018).\r\n\r\nDetails approved under discharge of condition application ref.  2025/01652/DET. \r\n","Condition : 14 - Prior to commencement (excluding site clearance and demolition) of the development hereby approved the following shall be submitted to, and approved in writing by, the Council:\r\n(i)\tA Construction Logistics Plan- \r\nThis shall be in accordance with Transport for London (TfL) requirements and must seek to minimise the impact of construction traffic on nearby roads and restrict construction trips to off peak hours only. The details shall also include the numbers, size and routes of construction vehicles, provisions to ensure that all vehicles associated with the construction works are properly washed and cleaned to prevent the passage of mud and dirt onto the highway, and other matters relating to traffic management to be agreed. The approved details shall be implemented throughout the project period.\r\n\r\nTo ensure that construction works do not adversely impact on the operation of the public highway, and that the amenity of occupiers of surrounding premises is not adversely affected by noise, vibration, lighting or other emissions from the building site, in accordance with policies T1, T6, T7, CC10, CC11, CC12 and CC13 of the Local Plan (2018).\r\n\r\nDetails approved under discharge of condition application ref. 2025/00883/DET. \r\n","Condition : 15 - The development hereby approved shall be carried out and completed in full accordance with the details contained within the approved Biodiversity Net Gain Plan dated September 2024 (V.2) and prepared by MKA Ecology. \r\n\r\nTo ensure the development delivers a biodiversity net gain on site in accordance with Policies G1 and G6 of the London Plan (2021), Policy OS5 of the H&F Local Plan (2018) and Schedule 7A of the Town and Country Planning Act 1990. \r\n","Condition : 16 - Prior to the commencement of the external landscaping works, a Habitat Management and Monitoring Plan (the HMMP), prepared in accordance with the approved Biodiversity Gain Plan shall be submitted to, and approved in writing by, the local planning authority. The HMMP should include: \r\n \r\na)\ta non-technical summary; \r\nb)\tthe roles and responsibilities of the people or organisation(s) delivering the HMMP; \r\nc)\tthe planned habitat creation and enhancement works to create or improve habitat to achieve the biodiversity net gain in accordance with the approved Biodiversity Gain Plan; \r\nd)\tproposed habitat details including species composition, requirements to reach the condition detailed in the metric, distinctiveness and any additional features such as log piles;\r\ne)\taccompanying plans of the site boundary, baseline and proposed habitats, provided in GIS format; \r\nf)\tthe management measures to maintain habitat in accordance with the approved Biodiversity Gain Plan for a period of 30 years from the completion of development; and \r\ng)\tthe monitoring methodology and frequency in respect of the created or enhanced habitat to be submitted to the local planning authority, \r\n \r\nNotice in writing shall be given to the Council when the HMMP has been implemented, and the habitat creation and enhancement works as set out in the HMMP have been completed. \r\nThe created and/or enhanced habitat specified in the approved HMMP shall be managed and maintained in accordance with the approved HMMP. Monitoring reports shall be submitted in years 2, 5, 10, 15, 20, 25 and 30 after completion to the local planning authority in writing in accordance with the methodology and frequency specified in the approved HMMP. \r\n\r\nReason: To ensure the development delivers a biodiversity net gain on site in accordance with Policies G1 and G6 of the London Plan (2021), Policy OS5 of the H&F Local Plan (2018) and Schedule 7A of the Town and Country Planning Act 1990. \r\n\r\nDetails approved under discharge of co"],"application_type":"All Other","url_planning_app":"https://property.lbhf.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/00714/VAR","development_type":"Minor all other minor developments","lpa_name":"Hammersmith & Fulham","application_details":{},"subdivision_of_building":null,"borough":"Hammersmith & Fulham","appeal_decision_date":null,"reference_no_of_permission_being_relied_on":null,"decision_date":"23/10/2026","site_name":"London College Of Fashion","lapsed_date":"22/10/2029","actual_completion_date":null,"cil_liability":false,"appeal_start_date":null,"date_building_work_completed_under_previous_permission":null,"postcode":"W12 8EA","locality":"London","lpa_app_no":"P/2026/00714/VAR","date_building_work_started_under_previous_permission":null,"title_number":null,"wgs84_polygon":{"coordinates":[[[-0.228559,51.504264],[-0.228184,51.50426],[-0.228196,51.504115],[-0.227849,51.50412],[-0.227868,51.503531],[-0.229033,51.503504],[-0.229039,51.503661],[-0.230153,51.503637],[-0.23014,51.503316],[-0.230231,51.503319],[-0.230387,51.50377],[-0.230551,51.503765],[-0.230593,51.503907],[-0.230526,51.503936],[-0.23044,51.503954],[-0.230168,51.503962],[-0.22991,51.503958],[-0.229596,51.503927],[-0.229091,51.503869],[-0.228824,51.503841],[-0.228505,51.503856],[-0.228559,51.504264]]],"type":"Polygon"},"bo_system":"Northgate M3","status":"Application Received","appeal_status":null,"appeal_decision":null,"actual_commencement_date":null,"site_number":"40","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[523044.9687499993,179857.31238266674],[523070.9999999994,179857.53119623003],[523070.5625000013,179841.33899247134],[523094.625,179842.43306029052],[523094.8437499997,179777.00780455663],[523014.1249999996,179771.97509257443],[523013.24999999907,179789.48017771984],[522936.03124999994,179784.88509286987],[522937.78125000105,179749.21848188422],[522931.43750000006,179749.43729544466],[522919.4062500002,179799.3267881167],[522908.03125000093,179798.45153385866],[522904.7500000004,179814.20611049014],[522909.34374999994,179817.48831395697],[522915.2500000008,179819.67644959677],[522934.06249999884,179820.98933098913],[522952.0000000007,179820.98933098774],[522973.8749999999,179818.14475464745],[523009.0937500007,179812.455601979],[523027.68749999854,179809.82983920415],[523049.78125000023,179812.01797484892],[523044.9687499993,179857.31238266674]]],"type":"Polygon"}]},"centroid":{"lat":51.503724,"lon":-0.228133},"centroid_northing":179798.0,"last_updated_by":"Northgate M3","id":"Hammersmith_&_Fulham-P_2026_00714_VAR","application_type_full":null,"valid_date":"04/03/2026","centroid_easting":523076.0,"parking_details":null,"last_date_consultation_comments":"13/05/2026","last_updated":"2026-11-11T12:10:00.245Z","street_name":"Lime Grove","uprn":"34032553","decision_target_date":"23/10/2026","secondary_street_name":null,"ward":"Coningham","description":"Amendments to Conditions 2, 6, and 9 (part c) of planning permission dated 14 February 2025 (ref. 2024/02332/FUL), for the 'Demolition of three non-original existing buildings adjacent to Blocks A, B and D, and associated remedial works, installation of a new external lift on south facade of Block C, installation of a new external lift on north east facade of Block D, installation of new permanent external ramps to Block B and C, replacement of external doors, provision of short and long stay cycle parking, external landscaping works including new nature garden, new surfacing, reorganisation of planters, and new planting, and associated works' to allow amendments to Block D only: (i) removal of the existing roof-top plant equipment and installation of replacement plant equipment and associated acoustic enclosures, fall restraint ladders and stepovers; (ii) installation of replacement fanlights above two external doors; (iii) amendment from double-leaf to single-leaf doors within two door sets; (iv) installation of external gas cylinder storage within meshed cage with fire protecting walls; (v) regrading, widening and increasing in length of two existing ramps to the rear of Block D; and (vi) installation of a dropped kerb, and associated works.","decision_process":"Delegated","pp_id":"14741623"}