{"cil_liability":false,"url_planning_app":"https://property.lbhf.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/00763/LBC","application_type":"All Other","lpa_app_no":"P/2026/00763/LBC","bo_system":"Northgate M3","reference_no_of_permission_being_relied_on":null,"decision_conditions":["Condition : 1 - The development hereby permitted shall not commence later than the expiration of 3 years beginning with the date of this planning permission.\r\n\r\nCondition required to be imposed by section 91(1)(a) of the Town and Country Planning Act 1990 (as amended by section 51 of the Planning and Compulsory Purchase Act 2004).","Condition : 2 - The development hereby permitted shall be carried out in complete accordance with the following approved drawings, other than where those details are altered pursuant to the conditions of this planning permission:\r\n\r\n-\tMasterplan National Proposed Site Plan Drawing Number 2425-AAI-DR-A-P-20-0S-01-02 Rev P01\r\n-\tExisting Elevation Ventilation Louvres Drawing Number OD2-AAI-NA-ZZ-DR-A-96035 Rev P01\r\n-\tCladding Level 0G Partial Plans and Elevation Ventilation Louvres Drawing Number OD2-AAI-NA-ZZ-DR-A-70750 Rev P01\r\n-\tDesign Statement National Louvres Olympia London Version I Dated Feb 2026\r\n-\tDemolition Plans and Elevation Level 0G Ventilation Louvres Drawing Number OD2-AAI-NA-ZZ-DR-A-96015 Rev P01\r\n-\tOlympia Day 2, Issue for Discussion � Planning, National, Ventilation Louvres 22/10/2025 Ref 2425-AAI-XX-XX-CI-A-00-00052 Rev P01\r\n\r\nTo ensure full compliance with the planning application hereby approved and to prevent harm arising through deviations from the approved plans.\r\n","Condition : 3 - The development hereby approved shall be carried out and completed metal and finished to match the colour of the surrounding window frames and any works of making good to existing elevations shall be carried out in materials to match the elevation to which the works relate, and will thereafter be permanently retained for the lifetime of the development.\r\n\r\nTo ensure a satisfactory external appearance, in accordance with Policies DC1, DC4 and DC8 of the Local Plan (2018)."],"uprn":"34063049","decision_date":"22/10/2026","centroid_easting":524314.0,"lapsed_date":"06/10/2029","valid_date":"24/02/2026","centroid":{"lat":51.496632,"lon":-0.210572},"last_synced":"2026-10-23T01:48:11.723Z","pp_id":"14711197","subdivision_of_building":"ground floor windows","date_building_work_started_under_previous_permission":null,"site_name":"Olympia Exhibition Centre","locality":"London","actual_completion_date":null,"date_building_work_completed_under_previous_permission":null,"decision_target_date":"23/10/2026","decision_agency":"Borough","street_name":"Hammersmith Road","application_type_full":"Full planning & listed building consent","development_type":"Other listed building consents (alter-extend)","appeal_decision_date":null,"secondary_street_name":null,"ward":null,"decision":"Approved","postcode":"W14 8UX","centroid_northing":179039.0,"appeal_status":null,"site_number":null,"last_date_consultation_comments":"15/04/2026","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[524420.39287,179012.445026],[524341.11065,178957.922423],[524350.567782,178945.775524],[524386.717781,178962.52526],[524441.468306,178977.075483],[524443.467915,178982.77573100003],[524420.39287,179012.445026]]],"type":"Polygon"}]},"title_number":null,"decision_process":null,"appeal_start_date":null,"parking_details":null,"lpa_name":"Hammersmith & Fulham","last_updated_by":"Northgate M3","application_details":{"grey_water_reuse":false,"total_gia_lost":0,"internal_resi_water_usage":0,"scheme_phasing":true,"rain_water_harvesting":false,"infrastructure_details":{"percentage_demolition_construction_material_recycling":0,"no_new_gas_connections_required":0,"total_annual_pm_emissions":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"no_homes_passive_cooling":0,"ghg_reduction_over_building_regulations":false,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_homes_to_have_electrical_heating":0,"waste_provision":true},"surface_water_discharge_percentage_reduction":0,"ownership_status":"Private","non_residential_details":{"total_gia_gained":0,"total_gia_existing":0,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0},"projected_cost_of_works":"Up to £2m","affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire development","intended_commencement_date":"02/2026","intended_completion_date":"03/2026"}],"site_area":0.1961,"green_suds":false,"garden_land_lost":false,"total_gia_gained":0,"total_gia_existing":0},"borough":"Hammersmith & Fulham","appeal_decision":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.20905,51.49637],[-0.21021,51.495898],[-0.210078,51.495787],[-0.209552,51.495929],[-0.208759,51.496048],[-0.208728,51.496099],[-0.20905,51.49637]]]},"status":"Approved","actual_commencement_date":null,"description":"Installation of louvres to replace existing over panels of windows at National Hall.","id":"Hammersmith_&_Fulham-P_2026_00763_LBC","epc_number":null,"last_updated":"2026-10-22T15:20:00.825Z"}