{"uprn":"34137957","ward":"Brook Green","epc_number":"2748-3072-1953-4496-2091","description":"Change of use of the ground floor property from a drinking establishment (Sui Generis) to a restaurant (Class E).","centroid_easting":523376.0,"decision_date":"17/09/2026","street_name":"Hammersmith Broadway","locality":"London","status":"Approved","date_building_work_started_under_previous_permission":null,"application_type_full":"Full planning permission","lpa_name":"Hammersmith & Fulham","decision_target_date":"17/09/2026","lpa_app_no":"P/2026/01369/FUL","title_number":null,"decision":"Approved","last_updated":"2026-09-17T11:40:01.050Z","appeal_start_date":null,"actual_commencement_date":null,"bo_system":"Northgate M3","secondary_street_name":null,"decision_agency":"Borough","last_date_consultation_comments":"19/08/2026","appeal_decision_date":null,"actual_completion_date":null,"centroid_northing":178662.0,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.224523,51.493675],[-0.224288,51.493673],[-0.224289,51.493638],[-0.224101,51.493632],[-0.224102,51.493596],[-0.224313,51.493601],[-0.224414,51.49359],[-0.224414,51.493608],[-0.224516,51.49361],[-0.224523,51.493675]]]},"date_building_work_completed_under_previous_permission":null,"lapsed_date":"16/09/2029","decision_conditions":["Condition : 1 - The development hereby permitted shall not commence later than the expiration of 3 years beginning with the date of this planning permission.\r\n\r\nCondition required to be imposed by section 91(1)(a) of the Town and Country Planning Act 1990 (as amended by section 51 of the Planning and Compulsory Purchase Act 2004).","Condition : 2 - The development hereby permitted shall be carried out in complete accordance with the following approved drawings, other than where those details are altered pursuant to the conditions of this planning permission:\r\n\r\n7240-NWCE-GW01-00-DR-2001 rev 2;\r\nFlood Risk Assessment dated June 2026. \r\n\r\nTo ensure full compliance with the planning application hereby approved and to prevent harm arising through deviations from the approved plans.\r\n","Condition : 3 - Prior to occupation of the development, a Delivery and Servicing Management Plan shall be submitted to and approved in writing by the Council, including frequency of deliveries and collections, number of vehicle movements over a typical day and weekly profile, management measures to be put in place relating to all servicing arrival and departures in accordance with kerb-side restrictions including alternative measures to be considered should kerb-side space not be available and quiet loading/unloading mitigation including silent reversing measures in accordance with Building Design Guidance for Quieter Deliveries, TFL, June 2018.  \r\n\t\r\nTo ensure that satisfactory provision is made for refuse storage and collection and to ensure that the amenity of occupiers of the surrounding premises and the development are not adversely affected by noise and that servicing activities do not adversely impact on the highway, in accordance with Policies T4 and SI1 of the London Plan (2021) and Policies T2, T4, T5, CC10, CC11 and CC13 of the Local Plan (2018) and the Council's Air Quality Action Plan.\r\n","Condition : 4 - Notwithstanding the provisions of the Town and Country Planning (Use Classes) Order 1987 or the Town and Country Planning (General Permitted Development) Order 2015 (or any orders revoking and re-enacting those orders with or without modification) the premises shall be used for all Class E uses except for the following uses:\r\n\r\n- Class E(d) for indoor sport, recreation or fitness\r\n- Class E(f) for Non-residential creche, day centre or nursery\r\n- Class E(g) for office use/light industrial\r\n\r\nTo ensure that there would be no adverse impact upon residential amenity by reason of noise and disturbance or highway safety by reason of increased traffic generation in accordance with Policies HO11, CC11 and T1 of the Local Plan (2018).\r\n","Condition : 5 - The use hereby permitted shall only operate between 11:00 and 22:00 hours Mondays to Fridays, between 11:00 and 23:59 on Saturdays, and between 12:00 and 22:00 Sundays and Bank Holidays.\r\n\r\nTo safeguard the amenities of surrounding occupiers and the area generally, in compliance with policies HO11 and CC11 of the Local Plan (2018).\r\n","Condition : 6 - No external air-conditioning units, ventilation fans, extraction equipment, flues or other plant equipment and associated external pipework or ducting shall be fitted to the exterior of the building. \r\n\r\nTo ensure a satisfactory external appearance and to prevent harm to the amenities of the occupiers of neighbouring residential properties, in accordance with Policies DC1, DC2, DC4, DC8 and HO11 of the Local Plan (2018).\r\n","Condition : 7 - No external seating shall be permitted at the development site at any time. \r\n\r\nIn order that the use of the Class E floorspace does not give rise to conditions detrimental to the amenities of the occupiers of neighbouring properties, in terms of noise and disturbance, and so as not to impede pedestrian flow on the public highway, in accordance with Policies HO11, T1, T3, T6, CC11 and CC13 of the Local Plan (2018) and Key Principles of the Planning Guidance Supplementary Planning Document (2018).\r\n","Condition : 8 - None of the shopfront on the Hammersmith Broadway frontage shall be fitted with external roller shutters, and the window glass of the shopfront shall not be mirrored, painted or otherwise obscured. \r\n\r\nTo ensure a satisfactory external appearance, in accordance with Policies DC1, DC4, DC5 and DC8 of the Local Plan (2018).","Condition : 9 - No organised delivery of food (i.e. takeaway deliveries to customers) shall take place from the commercial premises hereby approved using motorised and electric powered cycles and motorised and electric powered vehicles at any time. \r\n\r\nTo ensure that the amenity of occupiers of the development site/ surrounding premises is not adversely affected by noise, or that the development does not impact highway safety in accordance with Polices CC11, CC13, DC1, DC2, HO11, T1, T6 and TLC5 of the Local Plan (2018), and Key Principles of the Planning Guidance SPD (2018).\r\n","Condition : 10 - The development shall be carried out and completed in full accordance with the details contained within the approved Flood Risk Assessment [dated June 2026]. No part of the development shall be used or occupied until all flood prevention and mitigation measures have been installed in accordance with the submitted details and the development shall be permanently retained in this form and maintained as necessary thereafter.  \r\n\r\nTo limit the impact on flood risk and mitigate the susceptibility of the development to flooding in accordance with Policies CC2, CC3 and CC4 of the Local Plan (2018).\r\n"],"id":"Hammersmith_&_Fulham-P_2026_01369_FUL","application_type":"All Other","pp_id":"14853208","parking_details":null,"url_planning_app":"https://property.lbhf.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/01369/FUL","appeal_status":null,"valid_date":"25/06/2026","site_number":null,"application_details":{"non_residential_details":{"total_gia_gained":68,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_gia_lost":68,"total_gia_existing":68,"total_non_resi_gross_internal_floor_area_to_be_lost":68},"garden_land_lost":false,"ownership_status":"Private","infrastructure_details":{"total_annual_pm_emissions":0,"no_homes_to_have_electrical_heating":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"ghg_reduction_over_building_regulations":false,"mobile_network_operators_consultation":false,"no_new_gas_connections_required":0,"percentage_demolition_construction_material_recycling":0,"waste_provision":true,"no_new_water_connections_required":0,"fire_suppression_system_proposed":false,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0},"total_gia_lost":68,"scheme_phasing":true,"existing_proposed_floorspace_details":[{"gia_existing":68,"gia_gained":0,"use_class":"SG","gia_lost":68},{"gia_existing":0,"gia_gained":68,"use_class":"EB","gia_lost":0}],"grey_water_reuse":false,"total_gia_existing":68,"total_gia_gained":68,"phasing_details":[{"phase_detail":"Entire development","intended_completion_date":"12/2026","intended_commencement_date":"08/2026"}],"affordable_housing_fast_track":false,"site_area":0.0068000000000000005,"projected_cost_of_works":"Up to £2m","rain_water_harvesting":false,"internal_resi_water_usage":0,"surface_water_discharge_percentage_reduction":0,"green_suds":false},"site_name":"Unit 14 Ground Floor And Basement","decision_process":"Delegated","postcode":"W6 7AF","last_updated_by":"Northgate M3","centroid":{"lat":51.493449,"lon":-0.224209},"polygon":{"geometries":[{"coordinates":[[[523353.6249999999,178686.57469738682],[523369.9218750007,178686.68403629988],[523369.9218750006,178682.85717436747],[523383.0468749996,178682.52915763308],[523383.04687499994,178678.4836178723],[523368.3906250006,178678.70229569852],[523361.39062499965,178677.28088983876],[523361.3906250007,178679.24899026047],[523354.2812499987,178679.35832917358],[523353.6249999999,178686.57469738682]]],"type":"Polygon"}],"type":"geometrycollection"},"last_synced":"2026-09-18T02:25:13.588Z","appeal_decision":null,"borough":"Hammersmith & Fulham","cil_liability":false,"subdivision_of_building":"Ground floor ","development_type":"Other change of use","reference_no_of_permission_being_relied_on":null}