{"uprn":"34011862","last_synced":"2026-10-09T01:46:58.010Z","ward":"Coningham","epc_number":null,"description":"Erection of a single storey rear extension at ground floor level, following demolition of the existing single storey rear conservatory extension; installation of 1no. photovoltaic solar panel to the flat roof of the proposed single storey rear extension.","centroid_easting":522307.0,"decision_date":"16/09/2026","street_name":"Percy Road","locality":"London","status":"Approved","date_building_work_started_under_previous_permission":null,"application_type_full":"Full planning permission","lpa_name":"Hammersmith & Fulham","decision_target_date":"16/09/2026","lpa_app_no":"P/2026/01540/FUL","title_number":null,"decision":"Approved","last_updated":"2026-10-05T13:00:00.513Z","appeal_start_date":null,"actual_commencement_date":null,"bo_system":"Northgate M3","secondary_street_name":null,"decision_agency":"Borough","last_date_consultation_comments":"21/08/2026","appeal_decision_date":null,"actual_completion_date":null,"centroid_northing":179588.0,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.23941,51.502008],[-0.239386,51.502056],[-0.23907,51.501994],[-0.239092,51.501946],[-0.23941,51.502008]]]},"date_building_work_completed_under_previous_permission":null,"lapsed_date":"15/09/2029","decision_conditions":["Condition : 1 - The development hereby permitted shall not commence later than the expiration of 3 years beginning with the date of this planning permission.\r\n\r\nCondition required to be imposed by section 91(1)(a) of the Town and Country Planning Act 1990 (as amended by section 51 of the Planning and Compulsory Purchase Act 2004).","Condition : 2 - The development hereby permitted shall be carried out in complete accordance with the following approved drawings, other than where those details are altered pursuant to the conditions of this planning permission:\r\n\r\n- PRY_P131 � Proposed Section A\r\n- PRY_P122 � Proposed Side Elevation\r\n- PRY_P121 � Proposed Rear Elevation\r\n- PRY_P114 � Proposed Roof Plan\r\n- PRY_P111 � Proposed Ground Floor Plan\r\n- Flood Risk Assessment (dated: 21/07/2026)\r\n\r\nTo ensure full compliance with the planning application hereby approved and to prevent harm arising through deviations from the approved plans.\r\n","Condition : 3 - The development hereby approved shall be carried out and completed in accordance with the materials (including colour and finish) specified on the drawings hereby approved. The development shall be permanently retained in accordance with the approved details. Any works of making good to existing elevations shall be carried out in materials to match the elevation to which the works relate. \r\n\r\nTo ensure a satisfactory external appearance, in accordance with Policies DC1 and DC4 of the Local Plan (2018).\r\n","Condition : 4 - No water tanks, water tank enclosures or other structures (excluding solar panels and air source heat pumps) shall be erected upon the roof of the extension hereby permitted.   \r\n\r\nIt is considered that such structures would seriously detract from the appearance of the building, contrary to Policy DC4 of the Local Plan (2018).\r\n","Condition : 5 - The development shall be carried out and completed in full accordance with the details contained within the approved Flood Risk Assessment (dated: 21/07/2026). No part of the development shall be used or occupied until all flood prevention and mitigation measures have been installed in accordance with the submitted details and the development shall be permanently retained in this form and maintained as necessary thereafter.\r\n\r\nTo limit the impact on flood risk and mitigate the susceptibility of the development to flooding in accordance with Policies CC2, CC3 and CC4 of the Local Plan (2018).\r\n","Condition : 6 - The photovoltaic panel hereby approved shall not be situated anywhere other than the location as shown in drawings hereby approved. The tilt angle of the panel above the ground floor extension (as depicted on the approved roof plan drawing no. PRY_P121 � Proposed Rear Elevation) shall not be any greater than 10 degrees and the panel shall be permanently maintained in accordance with this requirement.\r\n\r\nTo ensure a satisfactory external appearance and to prevent harm to the street scene, in accordance with Policies DC1, DC4 and DC8 of the Local Plan (2018).\r\n","Condition : 7 - The solar/renewable equipment hereby approved shall, when they are no longer required for renewable energy purposes, be removed from the building and the building restored to its condition before the development took place.\r\n\r\nIn order to ensure a satisfactory external appearance, in accordance with Policies DC1, DC4, DC8 and HO11 of the Local Plan (2018).\r\n\r\n"],"id":"Hammersmith_&_Fulham-P_2026_01540_FUL","application_type":"All Other","pp_id":"15003925","parking_details":null,"url_planning_app":"https://property.lbhf.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/01540/FUL","appeal_status":null,"valid_date":"22/07/2026","site_number":"28","application_details":{"non_residential_details":{"total_gia_gained":0,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_gia_lost":3,"total_gia_existing":74,"total_non_resi_gross_internal_floor_area_to_be_lost":0},"garden_land_lost":false,"ownership_status":"Private","infrastructure_details":{"total_annual_pm_emissions":0,"no_homes_to_have_electrical_heating":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"ghg_reduction_over_building_regulations":false,"mobile_network_operators_consultation":false,"no_new_gas_connections_required":0,"percentage_demolition_construction_material_recycling":0,"waste_provision":true,"no_new_water_connections_required":0,"fire_suppression_system_proposed":false,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0},"total_gia_lost":3,"scheme_phasing":true,"existing_proposed_floorspace_details":[{"gia_existing":74,"use_class":"C3","gia_gained":0,"gia_lost":3}],"grey_water_reuse":false,"total_gia_existing":74,"total_gia_gained":0,"phasing_details":[{"phase_detail":"Entire Development","intended_completion_date":"05/2027","intended_commencement_date":"02/2027"}],"affordable_housing_fast_track":false,"site_area":0.011,"projected_cost_of_works":"Up to £2m","rain_water_harvesting":false,"internal_resi_water_usage":110,"surface_water_discharge_percentage_reduction":0,"green_suds":false},"site_name":null,"decision_process":"Delegated","postcode":"W12 9QA","last_updated_by":"Northgate M3","centroid":{"lat":51.502004,"lon":-0.239279},"polygon":{"geometries":[{"coordinates":[[[522297.91766125854,179588.22486894176],[522299.46774596395,179593.67416015302],[522321.5676935337,179587.22464820062],[522320.1180183042,179581.87456624617],[522297.91766125854,179588.22486894176]]],"type":"Polygon"}],"type":"geometrycollection"},"appeal_decision":null,"borough":"Hammersmith & Fulham","cil_liability":false,"subdivision_of_building":"Ground floor flat","development_type":"Minor all other minor developments","reference_no_of_permission_being_relied_on":null}