{"uprn":"34107159","ward":"Fulham Town","epc_number":null,"description":"Variation of condition 2 (approved drawings) of planning permission ref: 2025/01638/FUL granted 5th September 2025 for the 'Demolition and re-building of the front (north) of the building with new windows and door configurations, removal of ground floor walls to create new entrance mews with new entrance door off the mews with replacement entrance gates facing Heathman's Road; replacement of existing roof covering with new roof including the installation of extract ducts, rooflights and solar panels in the roofslopes; installation of new air conditioning units at roof level located within flat roof recess; erection of new gable wall facing Heathman's Road including a new pitched roof over the entrance mews; replacement of 4no windows with new windows at first floor level, infilling of 4no windows and replacement of 1no window with a new window at ground floor level to the rear elevation; associated external alterations'. Amendments sought to include: A revised proposed alignment and external finish to the rebuilt front (north) wall of the building comprising of the elevation to be brought marginally forward by 340mm with a splayed alignment back to the left and right boundaries, and adjustment to the smaller gable section over the entrance mews; incorporation of a central glazed projection to the first floor of the front elevation, revised windows at ground floor level, and revised first floor (outer) windows; minor changes to the position of the proposed roof lights and solar panels; reduced size of the recessed flat roof area; and various changes to the internal layout of the building such as a smaller lift, a revised location of the staircase, and the incorporation of ancillary facilities at first floor rather than ground floor level.","centroid_easting":524923.0,"decision_date":"06/08/2026","street_name":"Heathman's Road","locality":"London","status":"Approved","date_building_work_started_under_previous_permission":null,"application_type_full":"Removal/Variation of a condition","lpa_name":"Hammersmith & Fulham","decision_target_date":"06/08/2026","lpa_app_no":"P/2026/01558/VAR","title_number":null,"decision":"Approved","last_updated":"2026-08-06T10:30:02.016Z","appeal_start_date":null,"actual_commencement_date":null,"bo_system":"Northgate M3","secondary_street_name":null,"last_synced":"2026-08-07T02:12:57.848Z","decision_agency":"Borough","last_date_consultation_comments":"05/08/2026","appeal_decision_date":null,"actual_completion_date":null,"centroid_northing":176517.0,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.202837,51.473869],[-0.202793,51.473765],[-0.202756,51.473772],[-0.202738,51.473731],[-0.202484,51.473769],[-0.202561,51.473924],[-0.202837,51.473869]]]},"date_building_work_completed_under_previous_permission":null,"lapsed_date":"06/08/2029","decision_conditions":["Condition : 1 - The development hereby permitted shall not commence later than the expiration of 3 years beginning with the date of the original planning permission ref. 2025/01638/FUL granted 5th September 2025\r\n\r\nCondition required to be imposed by section 91(1)(a) of the Town and Country Planning Act 1990 (as amended by section 51 of the Planning and Compulsory Purchase Act 2004).\r\n","Condition : 2 - The development shall be carried out and completed in accordance with the following drawings hereby approved:\r\n\t\t\r\n\tPCA-9320-20A (Ground floor plan);\r\n\tPCA-9320-21A (First floor plan);\r\n\tPCA-9320-22A (Roof plan);\r\n\tPCA-9320-30A (Street elevation);\r\n\tPCA-9320-31A (Street elevation A);\r\n\tPCA-9320-32A (Elevation with materials);\r\n\tPCA-9320-34A (Rear elevation C);\r\n\tPCA-9320-35A (Section B);\r\n\tPCA-9320-36A (Section I);\r\n\tPCA-9320-37A (Section E);\r\n\tPCA-9320-38A (Section F);\r\n\tPCA-9320-39A (Section G);\r\n\tPCA-9320-40A (Section H)\r\n\t\r\n\t\t\r\n\tReason: To ensure full compliance with the planning permission hereby approved and to prevent harm arising through deviations from the approved plans, in accordance with Policy DC1 and DC4 of the Local Plan 2018.\r\n","Condition : 3 - Prior to commencement of the construction phase of the development hereby permitted, a scheme for temporary solid timber hoarded fencing (minimum height 2.5 metres) along the boundary fronting Heathmans Road shall be submitted to and approved in writing by the Local Planning Authority. The temporary solid timber hoarded fencing and/or enclosure in accordance with BS 5975-2:2024 shall be installed prior to the start of any site clearance works and thereafter be retained for the duration of the building works in accordance with the approved details. No part of the temporary fencing and/or enclosure of the site shall be used for the display of commercial advertisement hoardings unless the relevant advertisement consent is sought from the Local Planning Authority. Approved details shall be fully implemented and permanently retained and maintained during the demolition and construction phases of the development.\r\n\t\r\n\tReason: To ensure a satisfactory external appearance and to prevent harm to surrounding residential occupiers, the street scene, in accordance with Policy D4 of the London Plan (2021), Policies DC1 and CC12 of the Local Plan (2018) and Key Principles of the Planning Guidance SPD (2018).\r\n\r\nDetails approved under application ref. 2025/03538/DET\r\n","Condition : 4 - Notwithstanding the submitted details, prior to commencement of the development hereby approved a final Construction Management Plan shall be submitted to and approved in writing by the Local Planning Authority. Details shall include control measures for dust, noise, vibration, lighting, delivery locations, restriction of hours of work and all associated activities audible beyond the site boundary to 0800-1800hrs Mondays to Fridays and 0800-1300hrs on Saturdays, advance notification to neighbours and other interested parties of proposed works and public display of contact details including accessible phone contact to persons responsible for the site works for the duration of the works. The details shall also include any external illumination of the site during construction, contractors' method statements, waste classification and disposal procedures and locations, suitable site hoarding/enclosure, dust and noise monitoring and control. Approved details for each relevant phase, or part thereof shall be implemented throughout the project period.\r\n\t \r\n\tReason: To ensure that appropriate steps are taken to limit the impact of the proposed construction works on the amenities of local residents and the area generally, in accordance with Policy T7 of the London Plan 2021, Policies DC1, DC12, CC6, CC7, CC10, CC11 and CC12 of the Local Plan 2018 and Key Principles of the Planning Guidance SPD (2018).\r\n\r\nDetails approved under application ref. 2025/03538/DET\r\n","Condition : 5 - Prior to commencement of the development hereby approved, a final Construction Logistics Plan (CLP) in accordance with Transport for London Guidance shall have been submitted to and approved in writing by the Local Planning Authority. The CLP should cover the following minimum requirements: site logistics and operations; construction vehicle routing; contact details for site managers and details of management lines of reporting; location of site offices, ancillary buildings, plant, wheel-washing facilities, stacking bays and parking; storage of any skips, oil and chemical storage etc.; access and egress points and; membership of the Considerate Contractors Scheme; as well a clear description of how the site will discourage the use of private transport by personnel employed in its construction. The approved details shall be undertaken in accordance with the terms and throughout the period set out in the CLP.\r\n\t\t\r\n\tReason: To ensure that appropriate steps are taken to limit the impact of the proposed construction works on the operation of the public highway, in accordance with Policy T7 of the London Plan (2021) and T1, T6 and T7 of the Local Plan (2018).\r\n\r\nDetails approved under application ref. 2025/03538/DET\r\n","Condition : 6 - Prior to the commencement of the construction phase (excluding installation of temporary solid timber hoarded fencing around the perimeter of the site) of the development hereby permitted, details of Air Quality Emissions Control including Nitrogen Oxides (NOx), Particulates (PM10, PM2.5) emission control of Non-Road Mobile Machinery (NRMM), On Road Vehicles and fugitive dust emissions in order to mitigate air pollution shall be submitted to and approved in writing by the Local Planning Authority. The submitted details shall include: \r\n\t\r\n\ta.\tDetails of installation of solid timber hoarded fencing (minimum height of 2.5 m) including photographic confirmation of installed hoarding around the perimeter of the site.\r\n\tb.\tDetails of the Non-Road Mobile Machinery (NRMM) used on the site with CESAR Emissions Compliance Verification (ECV) identification that shall comply with the minimum Stage V NOx and PM10 emission criteria of The Non-Road Mobile Machinery (Type-Approval and Emission of Gaseous and Particulate Pollutants) Regulations 2018 and its subsequent amendments. This will apply to both variable and constant speed engines for both NOx and PM. An inventory of all NRMM for the first phase of construction shall be registered on the London City Hall NRMM register GLA-NRMM-Register prior to commencement of demolition works and thereafter retained and maintained until occupation of the development. \r\n\tc.\tDetails of the use of on-road London Ultra Low Emission Zone (ULEZ) compliant vehicles from on-site contractors and suppliers of services and materials to the site e.g. minimum Petrol/Diesel Euro 6 and Euro VI.\r\n\t\r\n\tDevelopers must ensure that on-site contractors follow best practicable means to minimise dust, particulates (PM10, PM2.5) and NOx emissions at all times in compliance with the Mayor of London 'The Control of Dust and Emissions during Construction and Demolition', SPG, July 2014. Approved details shall be fully implemented and permanently retained and maintai","Condition : 7 - Prior to occupation of the development hereby permitted, details (including manufacturer specification, installation/commissioning certificates and photographic confirmation) of the installed Zero Emission Air Source Heat Pumps, and standby Electric boilers to be provided for space heating and hot water for the Hotel use (Class C1) shall be submitted to and approved in writing by the Local Planning Authority. Approved details shall be fully implemented prior to the occupation/use of the development and thereafter permanently retained and maintained.\r\n\t\r\n\tReason: In the interests of air quality, in accordance with Policy SI 1 of the London Plan 2021, and Policy CC10 of the Local Plan (2018).\r\n","Condition : 8 - External artificial lighting at the development shall not exceed lux levels of vertical illumination at neighbouring premises that are recommended by the Institution of Lighting Professionals in the 'Guidance Notes for The Reduction of Light Pollution 2021'. Lighting should be minimized, and glare and sky glow should be prevented by correctly using, locating, aiming and shielding luminaires, in accordance with the Guidance Notes. \r\n\t\t\r\n\tReason: To ensure that the amenity of occupiers of surrounding premises is not adversely affected by lighting, in accordance with Policies CC11 and CC13 of the Local Plan 2018.\r\n","Condition : 9 - No other part of any land within the curtilage of the application site or part of any roof of the main building or new buildings hereby approved shall be used as a roof terrace or other form of open amenity space. No alterations shall be carried out; nor planters or other chattels placed on the roofs/within the curtilage of the application site. No railings or other means of enclosure shall be erected on the roofs/within the curtilage of the application site, and no alterations shall be carried out to any elevation of the application building to form access onto the roofs/within the curtilage of the application site.\r\n\t\t\r\n\tReason: The use of the roof as a terrace or the provision of additional amenity space would increase the likelihood of harm to the existing residential amenities of the occupiers of neighbouring properties as a result of overlooking, loss of privacy and noise and disturbance, contrary to Policies HO11, CC11 and DC4 of the Local Plan (2018), and SPD Policy HS8 of the Planning Guidance Supplementary Planning Document (2018).\r\n","Condition : 10 - The external sound level emitted from plant, machinery or equipment at the development hereby approved shall be lower than the lowest existing background sound level by at least 10dBA in order to prevent any adverse impact. The assessment shall be made in accordance with BS4142:2014 at the nearest and/or most affected noise sensitive premises, with all machinery operating together at maximum capacity.\r\n\t\r\n\tReason: To ensure that the amenity of occupiers of the development site/ surrounding premises is not adversely affected by noise from plant/mechanical installations/ equipment, in accordance with Policies CC11 and CC13 of the Local Plan 2018.\r\n","Condition : 11 - Prior to first use, the plant and machinery at the development shall be mounted with proprietary anti-vibration isolators and fan motors shall be vibration isolated from the casing and adequately silenced and maintained as such.\r\n\t\r\n\tReason: To ensure that the amenity of occupiers of the development site/ surrounding premises is not adversely affected by vibration, in accordance with Policies CC11 and CC13 of the Local Plan 2018.\r\n","Condition : 12 - No alterations shall be carried out to the external appearance of the building hereby permitted, including the installation of air-conditioning units, ventilation fans, extraction equipment, flues or other plant equipment and associated external pipework or ducting not shown on the approved drawings, without planning permission first being obtained. Any such changes shall be carried out in accordance with the approved details.\r\n\t\t\t\r\n\tReason: To ensure a satisfactory external appearance and to prevent harm to the amenities of the occupiers of neighbouring residential properties, in accordance with Policies DC1, DC4, CC11, CC13 and HO11 of the Local Plan (2018), and Key Principles of the Planning Guidance SPD (2018).\r\n","Condition : 13 - To be deleted.","Condition : 14 - Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any Order revoking or re-enacting that Order with or without modification), no aerials, antennae, satellite dishes or related telecommunications equipment shall be erected on any external part of the approved building, without planning permission first being obtained.\r\n\t\t\t\r\n\tReason: In order to ensure that the Council can fully consider the effect of telecommunications equipment upon the character and appearance of the building and its setting, in accordance with Policies DC1 and DC4 of the Local Plan (2018).\r\n","Condition : 15 - No water tanks, water tank enclosures or other structures, other than those set out on the approved drawings, shall be erected upon the roofs of the building hereby permitted.\r\n\t\t\t\r\n\tReason: It is considered that such structures would seriously detract from the appearance of the building, contrary to Policies DC1, DC4 and DC8 of the Local Plan (2018).\r\n","Condition : 16 - No plumbing, extract flues or pipes other than rainwater pipes shall be fixed on the front, rear or side elevations of the building hereby approved.\r\n\t\t\r\n\tReason: To ensure a satisfactory external appearance of the development, and to preserve the character and appearance of the area in accordance with Policies DC1 and DC4 of the Local Plan (2018).\r\n","Condition : 17 - Prior to the first occupation of the development hereby approved, full details of the cycle storage fixtures/fittings to serve the areas shown for this purpose on the approved plans shall be submitted to and approved by the Local Planning Authority.  \r\n\t\t\r\n\tThe cycle storage shall be provided in accordance with the approved plans and the approved fixture/fitting details prior to the first occupation of the office and shall be so permanently maintained for this designated purpose.\r\n\t\t\t\r\n\tIn order to promote alternative, sustainable forms of transport, in accordance with Policy T3 of the Local Plan (2018).\r\n","Condition : 18 - No part of the development hereby approved shall be occupied or used until the refuse storage, including provision for the storage of recyclable materials, have been implemented in accordance with the details provided on the approved plans. Thereafter the provision for cycle storage shall be so maintained for the life of the development.\r\n\t\t\t\r\n\tReason: To ensure satisfactory provision for the storage of refuse and recycling on site, and thereby prevent it being stored on the highway, in accordance with Policy CC7 of the Local Plan (2018).\r\n","Condition : 19 - Prior to the occupation of the development hereby permitted, the windows at ground and second floor level in the south elevation [plan ref PCA-9320-34A] shall be fitted with obscure glass to a minimum level of obscurity equivalent to Pilkington Texture Glass Level 3, and shall be non-opening and fixed shut. The windows shall thereafter be permanently retained as approved. \r\n\t\r\n\tReason: To protect the amenities of adjoining occupiers in terms of privacy and overlooking in accordance with Policy HO11 of the Local Plan (2018).\r\n","Condition : 20 - In the unlikely event that any bat, bat roost or bird nest is suspected or discovered during works, then works must immediately cease and a licensed ecologist must be consulted.\r\n\t\r\n\tReason: All Bats, their roosts and bird nests are protected under Schedule 5 of the Wildlife and Countryside Act 1981 and it is a criminal offence to disturb or destroy bats, their roosts and/or bird nests.\r\n","Condition : 21 - No development shall commence until a preliminary risk assessment report is submitted to and approved in writing by the Council. This report shall comprise: a desktop study which identifies all current and previous uses at the site and surrounding area as well as the potential contaminants associated with those uses; a site reconnaissance; and a conceptual model indicating potential pollutant linkages between sources, pathways and receptors, including those in the surrounding area and those planned at the site; and a qualitative risk assessment of any potentially unacceptable risks arising from the identified pollutant linkages to human health, controlled waters and the wider environment including ecological receptors and building materials. All works must be carried out in compliance with and by a competent person who conforms to LCRM: Land Contamination Risk Management (Environment Agency 2023) or the current UK requirements for sampling and testing.\r\n\t\t\r\n\tPotentially contaminative land uses (past or present) are understood to occur at, or near to, this site. This condition is required to ensure that no unacceptable risks are caused to humans, controlled waters or the wider environment during and following the development works, in accordance with Policy CC9 of the Local Plan (2018). \r\n\r\n\tDetails approved under application ref. 2025/03347/DET.\r\n","Condition : 22 - No development shall commence until a site investigation scheme is submitted to and approved in writing by the Council. This scheme shall be based upon and target the risks identified in the approved preliminary risk assessment and shall provide provisions for, where relevant, the sampling of soil, soil vapour, ground gas, surface and groundwater. All works must be carried out in compliance with and by a competent person who conforms to LCRM: Land Contamination Risk Management (Environment Agency 2023) or the current UK requirements for sampling and testing.\r\n\t\t\r\n\tPotentially contaminative land uses (past or present) are understood to occur at, or near to, this site. This condition is required to ensure that no unacceptable risks are caused to humans, controlled waters or the wider environment during and following the development works, in accordance with Policy CC9 of the Local Plan (2018).\r\n\r\nDetails approved under application ref. 2026/00237/DET\r\n","Condition : 23 - Unless the Council agree in writing that a set extent of development must commence to enable compliance with this condition, no development shall commence until, following a site investigation undertaken in compliance with the approved site investigation scheme, a quantitative risk assessment report is submitted to and approved in writing by the Council. This report shall: assess the degree and nature of any contamination identified on the site through the site investigation; include a revised conceptual site model from the preliminary risk assessment based on the information gathered through the site investigation to confirm the existence of any remaining pollutant linkages and determine the risks posed by any contamination to human health, controlled waters and the wider environment. All works must be carried out in compliance with and by a competent person who conforms to LCRM: Land Contamination Risk Management (Environment Agency 2023) or the current UK requirements for sampling and testing. \r\n\t\t\r\n\tPotentially contaminative land uses (past or present) are understood to occur at, or near to, this site. This condition is required to ensure that no unacceptable risks are caused to humans, controlled waters or the wider environment during and following the development works, in accordance with Policy CC9 of the Local Plan (2018).\r\n","Condition : 24 - Unless the Council agree in writing that a set extent of development must commence to enable compliance with this condition, no development shall commence until, a remediation method statement is submitted to and approved inwriting by the Council. This statement shall detail any required remediation works and shall be designed to mitigate any remaining risks identified in the approved quantitative risk assessment. All works must be carried out in compliance with and by a competent person who conforms to LCRM: Land Contamination Risk Management (Environment Agency 2023) or the current UK requirements for sampling and testing.\r\n\t\t\r\n\tPotentially contaminative land uses (past or present) are understood to occur at, or near to, this site. This condition is required to ensure that no unacceptable risks are caused to humans, controlled waters or the wider environment during and following the development works, in accordance with Policy CC9 of the Local Plan (2018).\r\n","Condition : 25 - Unless the Council agree in writing that a set extent of development must commence to enable compliance with this condition, no development shall commence until the approved remediation method statement has been carried out in full and a verification report confirming these works has been submitted to, and approved in writing, by the Council. This report shall include: details of the remediation works carried out; results of any verification sampling, testing or monitoring including the analysis of any imported soil; all waste management documentation showing the classification of waste, its treatment, movement and disposal; and the validation of gas membrane placement. If, during development, contamination not previously identified is found to be present at the site, the Council is to be informed immediately and no further development (unless otherwise agreed in writing by the Council) shall be carried out until a report indicating the nature of the contamination and how it is to be dealt with is submitted to, and agreed in writing by, the Council. Any required remediation shall be detailed in an amendment to the remediation statement and verification of these works included in the verification report. All works must be carried out in compliance with and by a competent person who conforms to LCRM: Land Contamination Risk Management (Environment Agency 2023) or the current UK requirements for sampling and testing. \r\n\t\t\r\n\tPotentially contaminative land uses (past or present) are understood to occur at, or near to, this site. This condition is required to ensure that no unacceptable risks are caused to humans, controlled waters or the wider environment during and following the development works, in accordance with Policy CC9 of the Local Plan (2018).\r\n","Condition : 26 - Unless the Council agree in writing that a set extent of development must commence to enable compliance with this condition, no development shall commence until an onward long-term monitoring methodology report is submitted to and approved in writing by the Council where further monitoring is required past the completion of development works to verify the success of the remediation undertaken. A verification report of these monitoring works shall then be submitted to and approved in writing by the Council when it may be demonstrated that no residual adverse risks exist. All works must be carried out in compliance with and by a competent person who conforms to LCRM: Land Contamination Risk Management (Environment Agency 2023) or the current UK requirements for sampling and testing.\r\n\t\t\r\n\tPotentially contaminative land uses (past or present) are understood to occur at, or near to, this site. This condition is required to ensure that no unacceptable risks are caused to humans, controlled waters or the wider environment during and following the development works, in accordance with Policy CC9 of the Local Plan (2018).\r\n","Condition : 27 - The development hereby approved shall be carried out and completed in accordance with the materials (including colour and finish) specified on the drawings hereby approved. The development shall be permanently retained in accordance with the approved details. Any works of making good to existing elevations shall be carried out in materials to match the elevation to which the works relate. \r\n\t\r\n\tTo ensure a satisfactory external appearance, in accordance with Policies DC1 and DC4 of the Local Plan (2018)\r\n"],"id":"Hammersmith_&_Fulham-P_2026_01558_VAR","application_type":"All Other","pp_id":"14945215","parking_details":null,"url_planning_app":"https://property.lbhf.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/01558/VAR","appeal_status":null,"valid_date":"24/06/2026","site_number":"15","application_details":{},"site_name":null,"decision_process":"Delegated","postcode":"SW6 4TJ","last_updated_by":"Northgate M3","centroid":{"lat":51.473833,"lon":-0.202695},"polygon":{"geometries":[{"coordinates":[[[524913.068812,176520.725553],[524916.418424,176509.32593900003],[524918.968427,176510.126207],[524920.268454,176505.626138],[524937.868579,176510.226076],[524932.04349,176527.40097],[524913.068812,176520.725553]]],"type":"Polygon"}],"type":"geometrycollection"},"appeal_decision":null,"borough":"Hammersmith & Fulham","cil_liability":false,"subdivision_of_building":null,"development_type":"Minor all other minor developments","reference_no_of_permission_being_relied_on":null}