{"application_details":{"existing_proposed_floorspace_details":[{"gia_existing":1971.8,"use_class":"EG1","gia_gained":0,"gia_lost":1971.8},{"gia_existing":0,"use_class":"C3","gia_gained":1971.8,"gia_lost":0}],"occupation_status":"Vacant","total_gia_gained":1971.8,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":1971.8,"total_gia_existing":1971.8,"total_gia_lost":1971.8},"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":9,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":false,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":true,"no_new_gas_connections_required":0,"waste_details":[{"external_dry_recycling":false,"external_food_waste":false,"unit_reference":"All","external_residual_waste":false,"reason_for_no_provision":"Please see Transport Assessment","internal_residual_waste":true,"internal_food_waste":true,"internal_dry_recycling":true}],"ghg_reduction_over_building_regulations":false},"residential_details":{"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_bedrooms":39,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_units":9,"total_no_proposed_residential_affordable_units":0,"total_no_existing_residential_units":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_market_for_rent":1,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_market_for_sale":8,"total_no_existing_residential_affordable_units":0,"habitable_rooms_density":null,"total_no_existing_residential_units_affordable_rent":0,"total_no_existing_residential_units_london_shared_ownership":0,"total_gia_gained":1971.8,"total_no_proposed_residential_units_social_rent":0,"total_no_existing_residential_units_london_affordable_rent":0,"dwelling_density":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_starter_homes":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_gia_lost":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_intermediate":0,"total_no_proposed_residential_units_london_shared_ownership":0,"affordable_percentage":0.0,"residential_units":[{"provider":"Private","no_habitable_rooms":8,"change_type":"Gain","no_bedrooms":5,"unit_type":"Terraced Home","gia":248.3,"tenure":"Market for sale"},{"provider":"Private","no_habitable_rooms":8,"change_type":"Gain","no_bedrooms":5,"unit_type":"Terraced Home","gia":280.6,"tenure":"Market for sale"},{"provider":"Private","no_habitable_rooms":8,"change_type":"Gain","no_bedrooms":5,"unit_type":"Terraced Home","gia":263.5,"tenure":"Market for sale"},{"provider":"Private","no_habitable_rooms":7,"change_type":"Gain","no_bedrooms":4,"unit_type":"Terraced Home","gia":224,"tenure":"Market for sale"},{"provider":"Private","no_habitable_rooms":7,"change_type":"Gain","no_bedrooms":4,"unit_type":"Terraced Home","gia":223,"tenure":"Market for sale"},{"provider":"Private","no_habitable_rooms":7,"change_type":"Gain","no_bedrooms":4,"unit_type":"Terraced Home","gia":224.5,"tenure":"Market for sale"},{"provider":"Private","no_habitable_rooms":6,"change_type":"Gain","no_bedrooms":4,"unit_type":"Terraced Home","gia":162.4,"tenure":"Market for sale"},{"provider":"Private","no_habitable_rooms":6,"change_type":"Gain","no_bedrooms":4,"unit_type":"Terraced Home","gia":185.3,"tenure":"Market for sale"},{"provider":"Private","no_habitable_rooms":6,"change_type":"Gain","no_bedrooms":4,"unit_type":"Terraced Home","gia":160.2,"tenure":"Market for rent"}],"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0},"intended_completion_date":"03/2028","total_gia_existing":1971.8,"intended_commencement_date":"03/2027","total_gia_lost":1971.8},"site_name":null,"lpa_app_no":"P/2026/01579/PACU1","last_updated_by":"Northgate M3","epc_number":null,"development_type":"County Matters","postcode":"SW6 1RU","pp_id":"14914621","valid_date":"29/06/2026","last_date_consultation_comments":"29/07/2026","decision_target_date":"16/10/2026","decision_conditions":["Condition : 1 - The development hereby permitted must be completed within a period of 3 years starting with this prior approval date.\r\n\t\t\t\t\r\nCondition required to be imposed by Condition MA.2.(5) of Class MA, Part 3, Schedule 2 of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended).\r\n","Condition : 2 - The development hereby permitted shall be carried out in complete accordance with the following approved drawing numbers, other than where those details are altered pursuant to the conditions of this planning permission:\r\n\t\t\t\t\r\n020001 Rev.P05, \r\n020002 Rev.P05; \r\n020003 Rev.P06;\r\n040101 Rev.P01;\r\n040102 Rev.P01;\r\nFlood Risk Assessment prepared by Arup received 19 June 2026.\r\n\t\t\t\t\r\nTo ensure full compliance with the planning application hereby approved and to prevent harm arising through deviations from the approved plans.\r\n","Condition : 3 - Any building permitted to be used as a dwellinghouse by virtue of Class MA is to remain in use as a dwellinghouse within the meaning of Class C3 of Schedule 1 to the Use Classes Order and for no other purpose, except to the extent that the other purpose is ancillary to the use as a dwellinghouse.\r\n\t\t\t\t\t\r\nCondition required to be imposed by Condition MA.2.(6) of Class MA, Part 3, Schedule 2 of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended).\r\n","Condition : 4 - The development shall be carried out and completed in full accordance with the details contained within the approved Flood Risk Assessment prepared by Arup received 19 June 2026. No part of the development shall be used or occupied until all flood prevention and mitigation measures, including a flood emergency plan, have been implemented in accordance with the submitted details and the development shall be permanently retained in this form and maintained as necessary thereafter.\r\n\t\t\t\r\nTo limit the impact on flood risk and mitigate the susceptibility of the development to flooding in accordance with Policies CC2, CC3 and CC4 of the Local Plan (2018).\r\n\r\n","Condition : 5 - Prior to occupation of the development hereby approved, provision shall be made for the storage of 18 bicycles within the storage area as indicated on the approved drawing nos. 020001 Rev.P05, 020002 Rev.P05 and 020003 Rev.P06. Thereafter the provision for cycle parking shall be permanently retained and maintained for the life of the development. \r\n\t\t\t\t\r\nTo ensure satisfactory provision for the cycles and thereby promote sustainable and active modes of transport, in accordance with Policy T3 of the Local Plan (2018).\r\n","Condition : 6 - Prior to occupation of the development hereby approved, provision shall be made for the storage of refuse and recycling as indicated on the approved drawing nos. 020001 Rev.P05, 020002 Rev.P05 and 020003 Rev.P06. Thereafter the provision for refuse and recycling storage shall be permanently retained and maintained for the life of the development. \r\n\t\t\t\t\r\nTo ensure satisfactory provision for the storage of refuse and recycling on site, and thereby prevent it being stored on the highway, in accordance with Policy CC7 of the Local Plan (2018).\r\n","Condition : 7 - No development shall commence until a preliminary risk assessment report is submitted to and approved in writing by the Council. This report shall comprise: a desktop study which identifies all current and previous uses at the site and surrounding area as well as the potential contaminants associated with those uses; a site reconnaissance; and a conceptual model indicating potential pollutant linkages between sources, pathways and receptors, including those in the surrounding area and those planned at the site; and a qualitative risk assessment of any potentially unacceptable risks arising from the identified pollutant linkages to human health, controlled waters and the wider environment including ecological receptors and building materials. All works must be carried out in compliance with and by a competent person who conforms to LCRM: Land Contamination Risk Management (Environment Agency 2023) or the current UK requirements for sampling and testing.\r\n\r\nPotentially contaminative land uses (past or present) are understood to occur at, or near to, this site. This condition is required to ensure that no unacceptable risks are caused to humans, controlled waters or the wider environment during and following the development works, in accordance with policy CC9 the Local Plan (2018) and key principles LC1 to LC7 of the Planning Guidance Supplementary Planning Document (2018). \r\n\r\n","Condition : 8 - No development shall commence until a site investigation scheme is submitted to and approved in writing by the Council. This scheme shall be based upon and target the risks identified in the approved preliminary risk assessment and shall provide provisions for, where relevant, the sampling of soil, soil vapour, ground gas, surface and groundwater . All works must be carried out in compliance with and by a competent person who conforms to LCRM: Land Contamination Risk Management (Environment Agency 2023) or the current UK requirements for sampling and testing.\r\n\r\nPotentially contaminative land uses (past or present) are understood to occur at, or near to, this site. This condition is required to ensure that no unacceptable risks are caused to humans, controlled waters or the wider environment during and following the development works, in accordance with policy CC9 the Local Plan (2018) and key principles LC1 to LC7 of the Planning Guidance Supplementary Planning Document (2018). \r\n\r\n\r\n","Condition : 9 - Unless the Council agree in writing that a set extent of development must commence to enable compliance with this condition, no development shall commence until, following a site investigation undertaken in compliance with the approved site investigation scheme, a quantitative risk assessment report is submitted to and approved in writing by the Council. This report shall: assess the degree and nature of any contamination identified on the site through the site investigation; include a revised conceptual site model from the preliminary risk assessment based on the information gathered through the site investigation to confirm the existence of any remaining pollutant linkages and determine the risks posed by any contamination to human health, controlled waters and the wider environment. All works must be carried out in compliance with and by a competent person who conforms to LCRM: Land Contamination Risk Management (Environment Agency 2023) or the current UK requirements for sampling and testing.\r\n\r\nPotentially contaminative land uses (past or present) are understood to occur at, or near to, this site. This condition is required to ensure that no unacceptable risks are caused to humans, controlled waters or the wider environment during and following the development works, in accordance with policy CC9 the Local Plan (2018) and key principles LC1 to LC7 of the Planning Guidance Supplementary Planning Document (2018). \r\n\r\n","Condition : 10 - Unless the Council agree in writing that a set extent of development must commence to enable compliance with this condition, no development shall commence until, a remediation method statement is submitted to and approved in writing by the Council. This statement shall detail any required remediation works and shall be designed to mitigate any remaining risks identified in the approved quantitative risk assessment. All works must be carried out in compliance with and by a competent person who conforms to LCRM: Land Contamination Risk Management (Environment Agency 2023) or the current UK requirements for sampling and testing.\r\n\r\nPotentially contaminative land uses (past or present) are understood to occur at, or near to, this site. This condition is required to ensure that no unacceptable risks are caused to humans, controlled waters or the wider environment during and following the development works, in accordance with policy CC9 the Local Plan (2018) and key principles LC1 to LC7 of the Planning Guidance Supplementary Planning Document (2018). \r\n","Condition : 11 - Unless the Council agree in writing that a set extent of development must commence to enable compliance with this condition, no development shall commence until the approved remediation method statement has been carried out in full and a verification report confirming these works has been submitted to, and approved in writing, by the Council. This report shall include: details of the remediation works carried out; results of any verification sampling, testing or monitoring including the analysis of any imported soil; all waste management documentation showing the classification of waste, its treatment, movement and disposal; and the validation of gas membrane placement. If, during development, contamination not previously identified is found to be present at the site, the Council is to be informed immediately and no further development (unless otherwise agreed in writing by the Council) shall be carried out until a report indicating the nature of the contamination and how it is to be dealt with is submitted to, and agreed in writing by, the Council. Any required remediation shall be detailed in an amendment to the remediation statement and verification of these works included in the verification report. All works must be carried out in compliance with and by a competent person who conforms to LCRM: Land Contamination Risk Management (Environment Agency 2023) or the current UK requirements for sampling and testing.\r\n\r\nPotentially contaminative land uses (past or present) are understood to occur at, or near to, this site. This condition is required to ensure that no unacceptable risks are caused to humans, controlled waters or the wider environment during and following the development works, in accordance with policy CC9 the Local Plan (2018) and key principles LC1 to LC7 of the Planning Guidance Supplementary Planning Document (2018). \r\n\r\n","Condition : 12 - Unless the Council agree in writing that a set extent of development must commence to enable compliance with this condition, no development shall commence until an onward long-term monitoring methodology report is submitted to and approved in writing by the Council where further monitoring is required past the completion of development works to verify the success of the remediation undertaken. A verification report of these monitoring works shall then be submitted to and approved in writing by the Council when it may be demonstrated that no residual adverse risks exist. All works must be carried out in compliance with and by a competent person who conforms to LCRM: Land Contamination Risk Management (Environment Agency 2023) or the current UK requirements for sampling and testing.\r\n\r\nPotentially contaminative land uses (past or present) are understood to occur at, or near to, this site. This condition is required to ensure that no unacceptable risks are caused to humans, controlled waters or the wider environment during and following the development works, in accordance with policy CC9 the Local Plan (2018) and key principles LC1 to LC7 of the Planning Guidance Supplementary Planning Document (2018). \r\n\r\n","Condition : 13 - Prior to commencement of the development hereby approved, a construction management plan shall be submitted to and approved in writing by the Council. Details shall include control measures for dust, noise, vibration, lighting, delivery locations, restriction of hours of work and all associated activities audible beyond the site boundary to 0800-1800hrs Mondays to Fridays and 0800 -1300 hrs on Saturdays with no works permitted on Sundays and Bank Holidays, advance notification to neighbours and other interested parties of proposed works and public display of contact details including accessible phone contact to persons responsible for the site works for the duration of the works. Approved details shall be implemented throughout the project period.\r\n\r\nTo ensure that the amenity of occupiers of surrounding premises is not adversely affected by noise, vibration, dust, lighting or other emissions from the building site, in accordance with Policies CC11, CC12 and CC13 of Local Plan (2018).\r\n"],"date_building_work_completed_under_previous_permission":null,"decision":"Approved","description":"Change of use of the existing properties from offices (Class E) to 9no. residential dwellings (Class C3).","centroid":{"lon":-0.196094,"lat":51.486411},"reference_no_of_permission_being_relied_on":null,"decision_date":"13/10/2026","status":"Approved","title_number":null,"actual_completion_date":null,"decision_agency":"Borough","centroid_easting":525347.0,"centroid_northing":177927.0,"url_planning_app":"https://property.lbhf.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/01579/PACU1","appeal_start_date":null,"parking_details":{"no_existing_cycle":0,"no_proposed_cycle":18,"net_cycle":18},"date_building_work_started_under_previous_permission":null,"ward":"Lillie","decision_process":"Delegated","locality":"London","appeal_decision":null,"appeal_decision_date":null,"cil_liability":false,"lapsed_date":"12/10/2029","secondary_street_name":null,"borough":"Hammersmith & Fulham","wgs84_polygon":{"coordinates":[[[-0.196567,51.486599],[-0.196177,51.486741],[-0.196076,51.486637],[-0.196469,51.486495],[-0.196474,51.486502],[-0.196567,51.486599]]],"type":"Polygon"},"actual_commencement_date":null,"last_updated":"2026-10-15T14:30:00.359Z","polygon":{"geometries":[{"coordinates":[[[525313.6165447772,177947.0764522021],[525340.3164079387,177963.5266423595],[525347.5670614105,177952.12656070833],[525320.7165759312,177935.7260336046],[525320.3668841468,177936.52634974825],[525313.6165447772,177947.0764522021]]],"type":"Polygon"}],"type":"geometrycollection"},"application_type":"Prior Approval","uprn":"34106589","site_number":"5","street_name":"Rickett Street","last_synced":"2026-10-21T16:11:34.071Z","appeal_status":null,"subdivision_of_building":null,"id":"Hammersmith_&_Fulham-P_2026_01579_PACU1","application_type_full":"Prior Approval: Change of use from Commercial, Business and Service (Use Class E) to Dwellinghouses (Use Class C3)","bo_system":"Northgate M3","lpa_name":"Hammersmith & Fulham"}