{"uprn":34112598,"ward":"Parsons Green And Sandford","epc_number":null,"description":"Imperial Studios S73 - Gable end","centroid_easting":525830,"decision_date":"15/09/2026","street_name":"Imperial Road","locality":"London","status":"Approved","date_building_work_started_under_previous_permission":null,"application_type_full":"Removal/Variation of a condition","lpa_name":"Hammersmith & Fulham","decision_target_date":"15/09/2026","lpa_app_no":"P/2026/01641/VAR","title_number":null,"decision":"Approved","last_updated":"2026-09-29T15:02:28.544Z","appeal_start_date":null,"actual_commencement_date":null,"bo_system":"Northgate M3","secondary_street_name":null,"decision_agency":"Borough","last_date_consultation_comments":"05/08/2026","appeal_decision_date":null,"actual_completion_date":null,"centroid_northing":176810,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.189516,51.476278],[-0.189517,51.476251],[-0.189561,51.476252],[-0.18956,51.476279],[-0.189516,51.476278]]]},"date_building_work_completed_under_previous_permission":null,"lapsed_date":"15/09/2029","last_synced":"2026-09-30T01:41:40.879Z","decision_conditions":["Condition : 1 - Notwithstanding the time limits given to implement planning permission as prescribed by Sections 91 and 92 of the Town and Country Planning Act 1990 (as amended), this permission in so far as it relates to the development (being granted under section 73A of the Act in respect of development already carried out) shall have effect from the date of this decision notice.\r\n\r\nTo ensure clarification of the works commenced in accordance with Section 73A of Chapter 8, Part III, of the Town and Country Planning Act 1990 (as amended).","Condition : 2 - The development hereby permitted shall be carried out in complete accordance \r\nwith the following approved drawing numbers and documents, other than where \r\nthose details are altered pursuant to the conditions of this planning permission: \r\n\r\n1050 Rev P.01; \r\n1320 Rev P.01.\r\n  \r\nTo ensure full compliance with the planning permission hereby approved and to \r\nprevent harm arising through deviations from the approved plans, in accordance \r\nwith Policies DC1, DC4 and DC8 of the Local Plan (2018). ","Condition : 3 - The development hereby approved shall be carried out and completed in accordance with the materials (including colour and finish) specified on the drawings hereby approved and listed in the 'External Materials Schedule Rev B' prepared by UMC Architects dated April 2023. \r\n\r\nThe development shall be permanently retained in accordance with the approved details. Any works of making good to existing elevations shall be carried out in materials to match the elevation to which the works relate.\r\n\r\nTo ensure a satisfactory external appearance, in accordance with Policies DC1, DC4 and DC8 of the Local Plan (2018).","Condition : 4 - The approved development shall not be occupied until cycle parking facilities have been provided in accordance with detailed drawings to be submitted to and approved in writing by the Local Planning Authority, such drawings to show the position, design, materials and finishes thereof. The provision for cycle storage shall be so maintained for the life of the development. \r\n\r\nTo ensure satisfactory provision for cycle storage and thereby encourage sustainable and active modes of transport, in accordance with Policy T3 of the Local Plan (2018).\r\n\r\nDetails approved under application ref: 2025/01131/DET.","Condition : 5 - Prior to the commencement of the Demolition phase of the development hereby permitted, an Air Quality Dust Management Plan (AQDMP) in order to mitigate air pollution shall be submitted to and approved in writing by the Local Planning Authority. The AQDMP shall include:\r\na)         Site Location Plan indicating sensitive off-site receptors within 50m of the red line site boundaries\r\nb)         Demolition Site and Equipment Layout Plan\r\nc)         Inventory and Timetable of dust generating activities during Demolition; \r\nd)         Air Quality Dust Risk Assessment (AQDRA) that considers the potential for dust soiling and PM10 (human health) impacts for sensitive receptors off-site of the development within 250 m of the site boundaries during the demolition phase and is undertaken in compliance with the methodology contained within Chapter 4 of the Mayor of London 'The Control of Dust and Emissions during Construction and Demolition', SPG, July 2014 \r\ne)         Site Specific Dust, Particulate (PM10) and NOx Emission mitigation and control measures as required by the overall Dust Risk Rating (Low, Medium, High) of the site and shall be in a table format as contained within Appendix 7 of Mayor's SPG including for on-road and off-road demolition traffic. \r\nf)          Details of Site Particulate (PM10) and Dust Monitoring Procedures and Protocols including locations of a minimum of 2 x MCERTS compliant (PM10) monitors on the site boundaries used to prevent levels exceeding predetermined PM10 threshold trigger levels, calibration certificates of MCERTS compliant PM10 monitors and details of real time internet based remote access to PM10 monitoring data \r\ng)         Details of the Non-Road Mobile Machinery (NRMM) used on the site with CESAR Emissions Compliance Verification (ECV) identification that shall comply with the minimum Stage IV NOx and PM10 emission criteria of The Non-Road Mobile Machinery (Type-Approval and Emission of Gaseous and Particulate Pollutants) Regula","Condition : 6 - Prior to the commencement of the construction phase of the development hereby permitted, an Air Quality Dust Management Plan (AQDMP) in order to mitigate air pollution shall be submitted to and approved in writing by the Local Planning Authority. The AQDMP shall include:\r\na)         Site Location Plan indicating sensitive off-site receptors within 50m of the red line site boundaries\r\nb)         Construction Site and Equipment Layout Plan\r\nc)         Inventory and Timetable of dust generating activities during Construction; \r\nd)         Air Quality Dust Risk Assessment (AQDRA) that considers the potential for dust soiling and PM10 (human health) impacts for sensitive receptors off-site of the development within 250 m of the site boundaries during the construction phase and is undertaken in compliance with the methodology contained within Chapter 4 of the Mayor of London 'The Control of Dust and Emissions during Construction and Demolition', SPG, July 2014 \r\ne)         Site Specific Dust, Particulate (PM10) and NOx Emission mitigation and control measures as required by the overall Dust Risk Rating (Low, Medium, High) of the site and shall be in a table format as contained within Appendix 7 of Mayor's SPG including for on-road and off-road construction traffic. \r\nf)          Details of Site Particulate (PM10) and Dust Monitoring Procedures and Protocols including locations of a minimum of 2 x MCERTS compliant (PM10) monitors on the site boundaries used to prevent levels exceeding predetermined PM10 threshold trigger levels, calibration certificates of MCERTS compliant PM10 monitors and details of real time internet based remote access to PM10 monitoring data \r\ng)         Details of the Non-Road Mobile Machinery (NRMM) used on the site with CESAR Emissions Compliance Verification (ECV) identification that shall comply with the minimum Stage IV NOx and PM10 emission criteria of The Non-Road Mobile Machinery (Type-Approval and Emission of Gaseous and Particulate Pollutan","Condition : 7 - Prior to occupation of the development hereby permitted, details of the installation/commissioning reports of the Zero Emission MCS certified Air Source Heat Pumps and electric boilers to be provided for space heating and hot water for the commercial uses (Use Class E) shall be submitted to and approved in writing by the Local Planning Authority. Approved details shall be fully implemented prior to the occupation/use of the development and thereafter permanently retained and maintained.\r\n\r\nIn the interests of air quality, in accordance with Policy SI 1 of the London Plan 2021, and Policy CC10 of the Local Plan (2018).\r\n\r\nDetails approved under application ref: 2025/01435/DET.","Condition : 8 - Prior to occupation of the development hereby permitted, a Delivery and Servicing Plan (DSP) shall be submitted to and approved in writing by the Local Planning Authority. Details shall include: \r\n\r\na.Use of Zero Exhaust Emission Vehicles in accordance with the emissions hierarchy (1) Walking Freight Trolleys (2) Cargo bike (3) Electric Vehicle, (4) Alternative Fuel e.g., CNG, Hydrogen, \r\n\r\nb.Facilities and measures that will minimise the impact of vehicle emissions from increasing personal deliveries e.g., carrier agnostic parcel locker, Cargo bike stands etc\r\n\r\nc.Reduction and consolidation of deliveries and collections e.g., Waste\r\n\r\nd.Re-timing of deliveries and collections outside of peak traffic time periods of 07:00-10:00 and 15:00-19:00 hrs\r\n\r\ne.Times, frequency and management of deliveries and collections including collection of waste and recyclables\r\n\r\nf. Operations of the loading bay (s) as identified on the approved drawings\r\n\r\ng.Emergency access, and vehicle movement at the site entrance and throughout the development\r\n\r\nh.Quiet loading/unloading mitigation including silent reversing measures in accordance with Building Design Guidance for Quieter Deliveries, TFL, June 2018, \r\n\r\nThe DSP shall demonstrate that all servicing and deliveries shall take place from within the site. Approved details shall be fully implemented prior to the occupation/use of the development and thereafter permanently retained and maintained for the lifetime of the development.\r\n\r\nIn the interests of air quality and sustainable transport, in accordance with Policies SI 1 and T2 of the London Plan (2021), and Policies CC10 and T1 of the Local Plan (2018).\r\n\r\nDetails approved under application ref: 2025/01377/DET.","Condition : 9 - Prior to occupation of the development hereby permitted, details of the installation of a minimum of three off-street cargo bike parking bays with cargo bike stands shall be submitted to and approved in writing by the Local Planning Authority. Approved details shall be fully implemented prior to the occupation/use of the development and thereafter permanently retained and maintained.\r\n\r\nIn the interests of air quality and sustainable transport, in accordance with Policies SI 1 and T2 of the London Plan 2021, and Policies CC10 and T1 of the Local Plan (2018).\r\n\r\nDetails approved under application ref: 2025/01131/DET.","Condition : 10 - Prior to occupation of the development hereby permitted, details of the installation including location and type of a minimum of twelve active electric vehicle charging points (minimum 22 kW) for all on-site car parking spaces must be submitted to and approved in writing by the Local Planning Authority. The approved electric vehicle charging points shall be installed and retained in working order for the lifetime of the development.\r\n\r\nIn the interests of air quality and sustainable transport, in accordance with Policies SI 1, T2  and T6 of the London Plan (2021), and Policies CC10 and T1 of the Local Plan (2018).\r\n\r\nDetails approved under application ref: 2025/01287/DET.","Condition : 11 - The development hereby permitted shall not commence until a detailed Construction Logistics Plan has been submitted to and approved in writing by the Local Planning Authority. This shall be in accordance with Transport for London Guidance on Construction Logistics Plans and shall include the demolition phase of the development. Each CLP shall include the following minimum information: \r\n \r\no          site logistics and operations; \r\no          construction vehicle routing; \r\no          Details of the estimated number, size and routes of construction vehicles per day/week\r\no          details of the use of Ultra Low Emission Zone (ULEZ) compliant Vehicles e.g. Euro 6 and Euro VI;\r\no          details of the access and egress arrangements\r\no          delivery locations on the site; \r\no          details of any vehicle holding areas; and other matters relating to traffic management to be agreed as required\r\no          Efficiency and sustainability measures to be undertaken for the works\r\no          membership of the Considerate Contractors Scheme. \r\n \r\nThe works shall be carried out in accordance with the relevant approved CLP unless otherwise agreed in writing with the Local Planning Authority. Approved details shall be fully implemented and retained and maintained throughout the construction phase of the development.\r\n                                                \r\nTo minimise the impacts of construction-related vehicle movements and facilitate sustainable construction travel to the site in accordance with Policies T1 and T6 of the Local Plan (2018).\r\n\r\nDetails approved under application ref: 2024/00638/DET \r\n","Condition : 12 - The development shall be carried out and completed in full accordance with the details of the flood mitigation measures including sustainable drainage measures contained within the hereby approved Flood Risk Assessment by Evolve Consulting Structural & Civil Engineers (Rev B / Ref: 3451-EVE-00-XX-T-C-0150 dated March 2022). \r\n\r\nNo part of the development shall be used or occupied until all flood prevention and mitigation measures have been installed in accordance with the submitted details and the development shall be permanently retained in this form and maintained as necessary thereafter.\r\n\r\nTo limit the impact on flood risk and mitigate the susceptibility of the development to flooding in accordance with Policies CC2, CC3 and CC4 of the Local Plan (2018).","Condition : 13 - Prior to occupation of the development hereby approved, a scheme for ecological enhancements shall be submitted to and approved in writing by the Local Planning Authority, such details to include bird or bat boxes fixed to the building or trees in suitable spots and native pollinator friendly plants added to the external planters. \r\n\r\nNo part of the development shall be occupied until these biodiversity enhancements have been carried out in accordance with the details so approved.\r\n\r\nIn order to secure the appropriate features to conserve and enhance wildlife habitats and biodiversity in line with Policies OS4 and OS5 of the Local Plan (2018).\r\n\r\nDetails approved under application ref: 2025/01608/DET.","Condition : 14 - Prior to the occupation of the development hereby permitted, all of the rooflights on the rear roof slope shown on approved Dwg No.1005 Rev P.05 (Proposed Roof Plan) shall be installed fixed shut / non opening below a height of 1.7m from floor level and fitted with obscure glass to a minimum level of obscurity equivalent to Pilkington Texture Glass Level 3. The rooflights shall thereafter be permanently retained as approved.\r\n\r\nTo protect the amenities of adjoining occupiers in terms of privacy and overlooking in accordance with Policy HO11 of the Local Plan (2018).\r\n","Condition : 15 - The development hereby permitted shall only be used in connection with the continued use of the existing building as business/retail/cafe use, and for no other purpose (including any other separate purpose in Class E of the Schedule to the Town and Country Planning (Use Classes) Order 1987, as amended, (or in any provision equivalent to that Class in any statutory instrument revoking and re-enacting that Order with or without modification).\r\n\r\nIn granting this permission, the Council has had regard to the special circumstances of the case. Certain other uses within the same use class may be unacceptable due to effect on residential amenity or traffic generation, in accordance with Policies DC1, DC4, HO11, CC11, CC13 and T1 of the Local Plan (2018).","Condition : 16 - The photovoltaic panels hereby approved shall not be situated anywhere other than the location as shown in drawings hereby approved. The tilt angle of the panels on the flat roof shall not be any greater than 10 degrees, and otherwise flush with the pitched roofs of the remaining buildings, and the panels shall be permanently maintained in accordance with this requirement. At no point shall additional panels be installed unless permission is first granted by council. \r\n\r\nTo ensure a satisfactory external appearance and to prevent harm to the street scene, in accordance with Policies DC1 and DC4 of the Local Plan (2018).\r\n"],"id":"Hammersmith_&_Fulham-P_2026_01641_VAR","application_type":"All Other","pp_id":"14971444","parking_details":null,"url_planning_app":"https://property.lbhf.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/01641/VAR","appeal_status":null,"valid_date":"12/06/2026","site_number":7,"application_details":{},"site_name":"Imperial Studios","decision_process":"Delegated","postcode":"SW6 2AG","last_updated_by":"Planning Portal ingest","centroid":{"lat":51.476265,"lon":-0.189538},"polygon":{"geometries":[{"coordinates":[[[525780.581162107,176820.05845210474],[525783.7884610929,176824.06625304878],[525782.1848116001,176825.26859333192],[525783.5211861781,176827.94046062673],[525796.0831072053,176837.9599629935],[525874.1273825298,176792.80540567666],[525865.1736728601,176777.70935545085],[525862.3672862485,176779.1788824654],[525861.69909896,176773.56796114013],[525780.581162107,176820.05845210474]]],"type":"Polygon"}],"type":"geometrycollection"},"appeal_decision":null,"borough":"Hammersmith And Fulham","cil_liability":false,"subdivision_of_building":null,"development_type":"Minor all other minor developments","reference_no_of_permission_being_relied_on":null}